HomeMy WebLinkAboutWQ0013502_Monitoring - 02-2024_20240307Monitoring Report Submittal
Permit Number#*
Name of Facility:*
Month: * February
WQ0013502
Towers Apartments WWTF
Report Information
Type *
NDMR, NDAR-1, NDAR-2, NDMLR
Confirmation Email Address:
Name of Submitter: *
Signature:
Date of submittal:
Initial Review
Year:* 2024
Upload Document*
Towers NDAR_2402.pdf 350.87KB
PDF Only
Please upload one PDF containing all applicable monitoring reports
(i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59).
chad.leinbach@gmail.com
Chad Leinbach
Reviewer: Wanda.Gerald
3/7/2024
This will be filled in automatically
Is the project number correct?* WQ0013502
Is the monitoring report accepted?* Yes No
Regional Office* Raleigh
Reviewer: _anonymous
Review Date: 3/11/2024
FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page
Permit No.: WQ0013502
Facility Name: Tower Apartments WWTF
County: Chatham
Month: February
Year: 2024
PPI: 001
Flow Measuring Point: ® Influent Ef luent No flow generated
Parameter Monitoring Point: ® Influent ❑ Effluent ❑ Groundwater Lowering surface water
Parameter Code 0.
50050
@
2 m
V F-
0
O
c
O
d
U N
O
LL
24-hr
hrs
GPD
1
240
2
240
3
240
4
240
5
240
6
07:35
0.25
240
7
235
8
235
9
235
10
235
11
235
12
235
13
1 07:40
0.25
235
14
240
15
240
16
240
17
240
18
1
240
19
240
20
1 07:30
0.33
240
21
215
22
215
23
215
24
215
25
215
26
215
27
07:40
0.33
215
28
205
29
205
30
31
Average:
230
Daily Maximum:
240
Daily Minimum:
205
Sampling Type:
Estimate
Monthly Limit:
Daily Limit:
1,080
Sample Frequency:
Monthly
FORM: NDMR 05-16 NON -DISCHARGE MONITORING REPORT (NDMR) Page of
Sampling Person(s) Certified Laboratories
Name: Chad Leinbach Name: Eurofins
Name: Conner Leinbach Name: Conner Consulting, LLC
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit?
® Compliant ❑ Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach
additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Chad Leinbach
Permittee: 3995 Jones Ferry, LLC
Certification No.: 23928
Signing Official: Chad Leinbach
Grade: SI Phone Number: 919-260-7301
Signing Official's Title: ORC
Has the ORC changed since the previous NDMR? ❑ Yes ® No
Phone Number: 919-260-7301 Permit Expiration: 7/31/25
clzle�_ 3/7/24
3/7/24
Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to
the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false
information, including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page
Permit No.: WQ0013502
Facility Name: Tower Apartments WWTF
County: Chatham
Month: February
Year: 2024
Did irrigation
Field Name:
1
Field Name:
2
Field Name:
3
Field Name:
4
occur at
facility?
Area (acres):
0.02
Area (acres):
0.02
Area (acres):
0.02
Area (acres):
0.02
this
Cover Crop:
Cover Crop:
Cover Crop:
Cover Crop:
® YES No
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Hourly Rate (in):
Annual Rate (in):
150.6
Annual Rate (in):
150.6
Annual Rate (in):
150.6
Annual Rate (in):
150.6
Weather
Freeboard
Field Irrigated?
® YES ❑ No
Field Irrigated?
YES ® No
Field Irrigated?
YES ® No
Field Irrigated?
YES ® No
>`
A
v
U
t
m
y
i
y
E
2
.O.
.2
i
d
O
U
""
Q O
U
>, O-
O Q
d v
E 2
7-
O O.
iQ
a
d+0'
E N
H
`a
O
J
�`
E rn
O TC
E 7 -O
= p
J
m o
E 1
O-
O fl_
>Q
d+0'
E O
F L
-
a
O
J
T
E m
O T�
E� -O
N 2
J
d a
E d
7-
O O.
>Q
'a
O+O'
E O
H L
`a
O
J
>.
'm
E m
O TC
E 7 'O
W 2 O
2 J
m a
E L
3-
Q
>Q
a
d+0'
E
31
F
_
o
O
T
@
E 0)
O T�
txo 0
J
°F
in
ft
ft
gal
min
in
in
gal
min
in
in
gal
min
in
in
gal
min
in
in
1
240
28.2353
0.44
0.44
0
0
0
2
240
28.2353
0.44
0.44
0
0
0
3
240
28.2353
0.44
0.44
0
0
0
4
240
28.2353
0.44
0.44
0
0
0
5
240
28.2353
0.44
0.44
0
0
0
6
C
47
0.1
240
28.2353
0.44
0.44
0
0
0
7
235
27.6471
0.43
0.43
0
0
0
8
235
27.6471
0.43
0.43
0
0
0
9
235
27.6471
0.43
0.43
0
0
0
10
235
27.6471
0.43
0.43
0
0
0
11
235
27.6471
0.43
0.43
0
0
0
12
235
27.6471
0.43
0.43
0
0
0
13
C
45
0.35
235
27.6471
0.43
0.43
0
0
0
14
240
28.2353
0.44
0.44
0
0
0
15
240
28.2353
0.44
0.44
0
0
0
16
240
28.2353
0.44
0.44
0
0
0
17
240
28.2353
0.44
0.44
0
0
0
18
240
28.2353
0.44
0.44
0
0
0
19
240
28.2353
0.44
0.44
0
0
0
20
CI
45
0.77
240
28.2353
0.44
0.44
0
0
0
21
215
25.2941
0.40
0.40
0
0
0
22
215
25.2941
0.40
0.40
0
0
0
23
215
25.2941
0.40
0.40
0
0
0
24
215
25.2941
0.40
0.40
0
0
0
25
1
1
1215
25.2941
0.40
0.40
10
0
0
26
215
25.2941
0.40
0.40
0
0
0
27
CI
56
0.35
215
25.2941
0.40
0.40
0
0
0
28
205
24.1176
0.38
0.38
0
0
0
29
205
24.11761
0.38
0.38
0
0
0
30
0
0
0
0
31
0
0
0
0
Monthly Loading:
F_-,2
6,680
00�
12.30
0
��/f,
0.00
Rod,
0
0.00%%%
0
0.00
Month Floating Total (in):
i ♦♦
♦♦/
53.31
i i i i
i i ii.
81.02
i i
83.07
1 80.99
FORM: NDAR-1 10-13 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of
Did the application rates exceed the limits in Attachment B of your permit?
®
Compliant
❑
Non -Compliant
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
®
Compliant
❑
Non -Compliant
Was a suitable vegetative cover maintained on all sites as specified in your permit?
®
Compliant
❑
Non -Compliant
Were all setbacks listed in your permit maintained for every application to each permitted site?
®
Compliant
❑
Non -Compliant
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
®
Compliant
❑
Non -Compliant
If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective
action(s) taken. Attach
additional sheets if necessary.
Operator in Responsible Charge (ORC) Certification
Permittee Certification
ORC: Chad Leinbach
Permittee:
3995 Jones Ferry, LLC
Certification No.: 23928
Signing Official: Chad Leinbach
Grade: SI Phone Number: 919 260-7301
Signing Official's Title: ORC
Has the ORC changed since the previous NDAR-1? ❑ Yes ® No
Phone Number: 919 260-7301 Permit Exp.: 7/31/25
3/7/24
3/7/24
Signature Date
Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge.
I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to
the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617