Loading...
HomeMy WebLinkAbout20191261 Ver 2_240307 - Kittrell Hill MY4 Signed Credit Release Request_20240307 117 Centrewest Court, Cary, NC 27513 | EcoTerra.com March 7, 2024 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset & Buffer Banking Coordinator From: Jordan Burbage / jordan@ecoterra.com / 919-922-9508 Through: Eco Terra, LLC We formally request a credit release for KITTRELL HILL (DWR ID# 2019-1261v2) for completion of Task #8 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task #8: MY4 Annual Monitoring Report, Approved Monitoring Bond Credits requested for release are detailed below: Credit Type % Release Credit Amount (include Units) Notes/Comments Buffer Restoration 5 18,190.850 ft2 MY4 Approved Buffer Preservation Buffer Enhancement Generated Nitrogen Nutrient Offset 5 1,057.353 lbs MY4 Approved Delivered Nitrogen Nutrient Offset (Jordan sites only) Generated Phosphorus Nutrient Offset Delivered Phosphorus Nutrient Offset (Jordan sites only) Signature: Attachments: 1) Approved Project Credit Table (Include the most recent Asset Table approved by DWR, whether it is the Plan table or the As-Built table) 2) Approved Credit Release Schedule (Include the approved credit release schedule, whether it is the credit release schedule from the MBI/UMBI or from the Plan) 3) Approved Monitoring Bond Table 2: Buffer Project Components and Assets Kittrell Hill Nutrient Offset and Riparian Buffer Mitigation Bank DWR Project #: 2019-1261v2 Monitoring Year 0 – 2020 Kittrell Hill Nutrient Offset and Riparian Buffer Mitigation Bank, NCDWR Project#: 2019-1261v2, Project Mitigation Credits: 363,817 ft2 (RBC) and 21,147.061 lbs N (NOC) Project Area N Credit Conversion Ratio (ft2/pound) P Credit Conversion Ratio (ft2/pound) Credit Type Location Subject? (enter NO if ephemeral or ditch 1) Feature Type Mitigation Activity Min-Max Buffer Width (ft) Feature Name Total Area (ft2) Total (Creditable) Area of Buffer Mitigation (ft2) Initial Credit Ratio (x:1)% Full Credit Final Credit Ratio (x:1) Convertible to Riparian Buffer? Riparian Buffer Credits Convertible to Nutrient Offset? Delivered Nutrient Offset: N (lbs) Delivered Nutrient Offset: P (lbs) Buffer Rural No Ditch Restoration 0-50 UT1 37,245 37,245 1 100% 1.00000 Yes 37,245.000 No —— Buffer Rural Yes I / P Restoration 0-100 UT1 236,463 236,463 1 100% 1.00000 Yes 236,463.000 No —— Nutrient Offset Rural Yes I / P Restoration 101-200 UT1 212,770 1 33%N/A —Yes 11,102.623 — Buffer Rural Yes I / P Restoration 0-100 UT2 90,109 90,109 1 100% 1.00000 Yes 90,109.000 No —— Nutrient Offset Rural Yes I / P Restoration 101-200 UT2 71,724 1 33%N/A —Yes 3,742.654 — Nutrient Offset Rural No Ditch Restoration UT1 (51-200)120,767 1 No —Yes 6,301.783 — Totals:769,078 363,817 Enter Preservation Credits Below Eligible for Preservation (ft2):121,272 Credit Type Location Subject?Feature Type Mitigation Activity Min-Max Buffer Width (ft) Feature Name Total Area (sf) Total (Creditable) Area for Buffer Mitigation (ft2) Initial Credit Ratio (x:1)% Full Credit Final Credit Ratio (x:1) Riparian Buffer Credits Buffer Preservation — Preservation Area Subtotal (ft2):0 Preservation as % Total Area of Buffer Mitigation:0.0% Ephemeral Reaches as % Total Area of Buffer Mitigation:0.0%Square Feet Credits 363,817 363,817.000 0 0.000 0 0.000 0 363817 363,817 363,817.000 363817 Square Feet Credits Nitrogen:21,147.061 1. The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a).Phosphorus:0.000 Enhancement: Preservation: Total Riparian Buffer: TOTAL NUTRIENT OFFSET MITIGATION Mitigation Totals Nutrient Offset:405,261 Neuse 03020203 19.16394 N/A TOTAL AREA OF BUFFER MITIGATION (TABM) Mitigation Totals Restoration: 11 VIII. CREDIT RELEASE SCHEDULE A. Upon submittal of all appropriate documentation by the Sponsor, and subsequent approval by DWR, it is agreed that the Riparian Buffer Credits and Nutrient Offset Credits associated with the Bank Parcel will become available for sale to a third party in accordance with the Credit Release Schedule in Table 2 below: Table 2.0 - Credit Release Schedule for Riparian Buffer and Nutrient Offset Credits Task Project Milestone Credit Available for Sale I MBI and BPDP Approved by DWR, Conservation Easement Recorded* and Financial Assurance posted 20 2 Site Earthwork, Planting and Installation of Monitoring Devices Completed, all applicable permits obtained 20 3 Monitoring Financial Assurance Posted and Approval of As-Built Report 10 4 Monitoring Report #1: App roved by the DWR** & financial assurance renewed 10 5 Monitoring Report #2: Approved by the DWR** & financial assurance renewed 10 6 Monitoring Report #3: Approved by the DWR** & financial assurance renewed 10 7 Item B (I) of Section X in this Instrument has been completed and approved by DWR. 5 No remaining credits will be released until Task 7 has been satisfied, assigning the conservation easement to an approved land trust or long-term steward. 8 Monitoring Report #4: Approved by the DWR** & financial assurance renewed 5 9 Monitoring Report #5: Approved by the DWR** and final site visit by DWR has been conducted 10 Total 100% For specification, please see Section V in this Instrument DWR Approval provided upon a determination that the site is meeting performance standards contained within the approved BPDP B. DWR may modify the credit release schedule based on the information submitted or the order in which required information is received. DWR will notify the Sponsor of any modification to the credit release schedule. C. DWR may consider a Credit Release Schedule for a Bank Parcel based on the extent of change between current onsite conditions and proposed post construction conditions.