Loading...
HomeMy WebLinkAbout20231624 Ver 1__External_ RE_ RFAI for Revised PCN Stream Impacts_20240215Baker, Caroline D From: Michael Penny <MPenny@mckimcreed.com> Sent: Tuesday, February 20, 2024 2:40 PM To: Tillery, Julia A CIV USARMY CESAW (USA) Cc: Andre Miller; Anna Reusche; Thomas, Zachary T Subject: [External] RE: RFAI for Revised PCN Stream Impacts CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Thanks Julia! We greatly appreciate your help on providing a quick review! Thanks, Michael From: Tillery, Julia A CIV USARMY CESAW (USA) <Julia.A.Tillery@usace.army.mil> Sent: Tuesday, February 20, 2024 2:29 PM To: Michael Penny <MPenny@mckimcreed.com> Cc: Andre Miller <amiller@owasa.org>; Anna Reusche <areusche@transystems.com>; Thomas, Zachary T <zachary.thomas@deq.nc.gov> Subject: RE: RFAI for Revised PCN Stream Impacts Good afternoon, Michael, Nice speaking with you today, I appreciate the call and discussion. I do have everything I need now to complete review and proceed with a provisional verification this week. Thank you, Julia Julia Tillery Regulatory Specialist, Raleigh Regulatory Field Office US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: 919.440.1951 Email: Julia.A.Tillery@usace.army.mil From: Michael Penny <MPenny@mckimcreed.com> Sent: Monday, February 19, 2024 11:18 AM To: Tillery, Julia A CIV USARMY CESAW (USA) <Julia.A.Tillery@usace.army.mil>; Thomas, Zachary T <zachary.thomas@ deg. nc.gov> Cc: Andre Miller <amiller@owasa.org>; Anna Reusche <areusche@transystems.com> Subject: [Non-DoD Source] RE: RFAI for Revised PCN Stream Impacts 1 Good morning Zach! Thanks for taking my call. I understand you have received the responses provided to you and you intend to begin review late this week after you work through some other projects. Julia, this is a follow up to my voice mail. Please let us know if you need anything else from our team. Asa reminder to all parties, this project is very criticaIf or OWASA's infrastructure due to the age and condition and history of repairs. We recognize and appreciate your efforts to provide comments and feedback to date and we aim to be responsive to your needs so that we can keep this project on track for OWASA. I've copied OWASA's PM, Andre Miller, on this email so that OWASA is up to speed with communication. Please let us know if there are other items you need in order to process the permits. Thanks again! Michael Penny, PE I Project Manager I T 919.233.8091 1 M 919.441.1014 4300 Edwards Mill Road, Suite 200, Raleigh, NC 27612 mpenny@mckimcreed.com I www.mckimcreed.com Voted "Best Firm To Work For" - Zweig Group J �w From: Tillery, Julia A CIV USARMY CESAW (USA)<Julia.A.Tillerv@usace.army.mil> Sent: Thursday, February 15, 2024 4:49 PM To: Anna Reusche <areusche@transystems.com> Cc: Michael Penny <MPenny@mckimcreed.com>; Subject: RE: RFAI for Revised PCN Stream Impacts Very good, thank you. Thomas, Zachary T <zacharv.thomas@deq.nc.gov> Julia Tillery Regulatory Specialist, Raleigh Regulatory Field Office US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: 919.440.1951 Email: Julia.A.Tillerv@usace.army.mil From: Anna Reusche <areusche@transystems.com> Sent: Thursday, February 15, 2024 10:49 AM To: Tillery, Julia A CIV USARMY CESAW (USA)<Julia.A.Tillerv@usace.army.mil> Cc: Michael Penny <MPenny@mckimcreed.com>; Thomas, Zachary T <zacharv.thomas@deq.nc.gov> Subject: [Non-DoD Source] RE: RFAI for Revised PCN Stream Impacts Good morning, Please see the attached table. Description of the impacts is also provided below: Sa. Reason for impact 315.1mpact type* 3c. Type of impact* 3d. S. name* S1 Temporary Acces ITemporaryy v other Sewer line installITemporary; v Excavation VI FsB ssI Concrete pier re ITernporary v other VI I Morgan Cree Add another impact "* All Perennial or Intermittent streams mLISt be verified by DID^IR or delegated local government. 3i. 'Total jurisdictional ditch impact in square feet: S1 impact is required for access to sewer line for installation of temporary flow -through connection to existing sanitary sewer. The disturbance area will be restored with native material. S2 impact will result from the temporary excavation required for the sewer line replacement installation. The disturbance area will be restored to existing conditions following construction. Currently this section is lined with rip rap. No additional rip rap will be placed outside of the existing footprint. S3 impact will result from the removal of the existing aerial sewer line and existing concrete piers. The stream bed will be restored using native material. New piers will be located adjacent to the stream channel, above the OHWM. No permanent stream impacts are proposed. Thank you, Anna Reusche Anna Reusche, PWS I TranSystems c: 919-816-7745 From: Tillery, Julia A CIV USARMY CESAW (USA)<Julia.A.Tillery@usace.army.mil> Sent: Wednesday, February 14, 2024 2:48 PM To: Anna Reusche <areusche@transystems.com> Cc: Michael Penny <MPenny@mckimcreed.com>; Thomas, Zachary T <zachary.thomas@deg.nc.gov> Subject: RFAI for Revised PCN Stream Impacts Importance: High Hi, Anna, Thank you for checking in. I am in the process of reviewing. I did just notice that you did not include an updated PCN. Please update and send the PCN Section D Proposed Impacts Inventory to include the revised Temporary and Permanent stream impacts. Currently, your updated plans indicate all stream impacts as temporary. If any riprap is placed below the OHWM, then that is a Permanent No -permanent -loss stream impact. Bank stabilization impacts are generally classified as follows: if there's riprap in a new footprint anywhere (even extending outside of current riprap footprint), that will be a Permanent (No -permanent -loss) impact. If the locations where riprap overlaps existing riprap, it could be a temporary impact if removing the old riprap and replacing new riprap in that same footprint. If piling more riprap on top of existing riprap it would be a Permanent (No -permanent -loss) impact. Please indicate each quantified impact type as a separate entry and include explanation of each. You can send a revision of your original PCN or you can just recreate the section snip seen below in an email response and I will edit it into your PCN I have on file. D. Proposed Impacts Inventory 1. Impacts Summary ia, Where are the impacts associated with your project? (check all that apply): Wetlands Open Waters 3. Stream Impacts Streams -tributaries Pond Construction Buffers 3a, Reason for impact' i'1 3tr.1mpact type 3c. Type of impact„ 3d. S. narne 3e. Stream Type } - 3f. Type J uriAit SM Sewer crossing Permanent Bank Stabilization Morgan Creek Perennial Bcrh 1. Total jurisdictional ditch impact in squarefeet: 0 1. Total permanent stream impacts: 56 1. Total stream and ditch impacts; 56 3j. Comments: Installation via open cut and includes bank stabilization. Thank you, Julia Tillery Regulatory Specialist, Raleigh Regulatory Field Office US Army Corps of Engineers CE-SAW-RG-R 3i. Total temporary stream impacts: lr 4 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: 919.440.1951 Email: Julia.A.Tillery@usace.army.mil From: Anna Reusche <areusche@transystems.com> Sent: Wednesday, February 14, 2024 1:50 PM To: Tillery, Julia A CIV USARMY CESAW (USA) <Julia.A.Tillery@usace.army.mil>; Thomas, Zachary T <zachary.thomas@deg. nc.gov> Cc: Michael Penny <MPenny@mckimcreed.com> Subject: FW: [Non-DoD Source] Morgan Creek Interceptor Replacement: 1-25-2024 Field Visit Meeting Minutes Good afternoon Julia and Zach, I am following up to be sure this information was received. Please don't hesitate to let me know if you have any further questions. Thank you, Anna Reusche From: Anna Reusche Sent: Thursday, February 8, 2024 11:21 AM To: Tillery, Julia A CIV USARMY CESAW (USA) <Julia.A.Tillery@usace.army.mil>; Thomas, Zachary T <zachary.thomas@deg. nc.gov> Cc: Michael Penny <MPenny@mckimcreed.com> Subject: RE: [Non-DoD Source] Morgan Creek Interceptor Replacement: 1-25-2024 Field Visit Meeting Minutes Good morning, Additional information, including changes to drawings forthe Morgan Creek Interceptor Replacement permit application are attached for your review. Thank you for your help on this! Anna Reusche From: Tillery, Julia A CIV USARMY CESAW (USA)<Julia.A.Tillery@usace.army.mil> Sent: Friday, January 26, 2024 11:08 AM To: Anna Reusche <areusche@transystems.com>; Thomas, Zachary T <zachary.thomas@deg. nc.gov> Cc: Michael Penny <MPenny@mckimcreed.com> Subject: RE: [Non-DoD Source] Morgan Creek Interceptor Replacement: 1-25-2024 Field Visit Meeting Minutes Received, thank you. Julia Tillery Regulatory Specialist, Raleigh Regulatory Field Office US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Mobile: 919.440.1951 Email: Julia.A.Tillery@usace.army.mil From: Anna Reusche <areusche@transystems.com> Sent: Friday, January 26, 2024 11:03 AM To: Tillery, Julia A CIV USARMY CESAW (USA) <Julia.A.Tillery@usace.army.mil>; Thomas, Zachary T <zachary.thomas@deg. nc.gov> Cc: Michael Penny <MPenny@mckimcreed.com> Subject: [Non-DoD Source] Morgan Creek Interceptor Replacement: 1-25-2024 Field Visit Meeting Minutes Good morning, Thank you for your time yesterday to review the project. It was great to meet folks in person. We've pulled together our meeting minutes from yesterday's meeting. The 2022 DEQ Stream Determination is also attached (DWR No. JBRRO #22-352). We are in the process of updating our drawings per the comments received yesterday and will get those submitted next week. Thank you all and have a great weekend! Anna Anna Reusche, Pws Sr. Environmental Project Manager c: 919-816-7745 TranSystems 1 Glenwood Ave Suite 600 1 Raleigh, NC 27603 www.transystems.com TRANSYSTEMS aoao Note: The information contained in this transmission as well as all documents transmitted herewith are privileged and confidential information. This information is intended only for the use of the individual or entity to whom it was sent, and the recipient is obliged to protect this information as appropriate. If the recipient of the e-mail, and/or the documents attached is not the intended recipient, you are hereby notified that any dissemination, distribution or reproduction, copy, or storage of this communication is strictly prohibited. Thank you. Disclaimer This e-mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this e-mail in error please notify the system manager. Please note that any views or opinions presented in this e-mail are solely those of the author and do not necessarily represent those of the company. Finally, the recipient should check this e-mail and any attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this e-mail. Disclaimer This e-mail and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this e-mail in error please notify the system manager. Please note that any views or opinions presented in this e-mail are solely those of the author and do not necessarily represent those of the company. Finally, the recipient should check this e-mail and any attachments for the presence of viruses. The company accepts no liability for any damage caused by any virus transmitted by this e-mail.