Loading...
HomeMy WebLinkAboutNCG030697_DMR Upload Review_20240311 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 3/7/2024 1:51:38 PM(DMR Submittal) Submit by Brittany.Cook 3/11/2024 10:19:40 AM(DMR Submittal Review) • The task was assigned to DEMLR SW Admin for DMRs 3/7/2024 1:51:39 PM • Brittany.Cook assigned the task to Brittany.Cook 3/11/2024 10:13:49 AM [rftDQ DMR Submittal from 3/7/2024 Permit and Facility Information: .............................................................................................................................................. Permit Number* Enter COC or Individual Permit Number NCG030697 Must begin with NCS or NCG Facility Name:* Instrument Transformer Equipment Corp. Owner/Operator Instrument Transformer Equipment Corp Name:* County:* Union Note: Facility name and county are used to help the reviewer verify the permit number entered,and to display the Regional Office address on the submitter's form(not here).These metadata details will be pulled from current BIMS information after the DMR(s)are filed. If the submittal is accepted,simply note any errors in the reviewer's comments. Reason for not yet If applicable: reporting data Permittee was sent the forms to register for eDMR application in 2023, but it is not through eDMR for known whether permittee has submitted these forms and/or whether the application this permit: was processed. Monitoring Period Information: .............................................................................................................................................................................................................................................................................................................................................................................................. Monitoring Period What is the YEAR of the sample date(s)? Year:* 2023 DMR Upload* Click the upload button or drag and drop files here to attach document. ITEC 2023 Report-No Discharge.pdf 929.69KB Only PDFs are accepted. Comments: No discharge at the outfall in 2023 * By checking the box and signing box below, I certify that: o I have given true,accurate,and complete information on this form; d I agree that submission of this Discharge Monitoring Report(DMR)Upload form is a"transaction"subject to Chapter 66, Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); d I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act"); o I understand that an electronic signature on this upload form has the same legal effect and can be enforced in the same way as a written signature;AND o I intend to electronically sign and submit this DMR Upload form. Full Name:* Eric Eubanks Name of person submitting this form Email Address:* eme@geologicalresourcesinc.com Phone Number:* 7048454010 Signature: Ste.;--Ar .� Date:* 03/07/2024 Review Review Date: 03/11/2024 Confirm Permit No.* Correct the permit ID number if needed. NCG030697 Confirm DMR Year* 2023 Multiple DMRs will be automatically filed in a subfolder denoting the sampling year entered above. Can submittal be Yes accepted?* No(Explain why below) Do Central Office No staff need to be Yes alerted?* Do Regional Office No staff need to be Yes alerted? Type of Permit* General Ensures DMR(s)filed correctly.