HomeMy WebLinkAboutNCC190280_NOT Closeout Documents_20240306 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094
(910)433-3300
County: Bladen Project: PNG-NC 41 Bladen Roundabout River basin: Lumber
Person financially responsible:Piedmont Natural Gas-Randy Webb,Operations Project#: BLADE-2019-005
Manager
Address: 185 Enterprise Drive,Rockingham,NC 28379
1. Project Location: NC 410,Bladenboro
Pictures: No
2. Weather and soil conditions: sunny/clear/hot Initial inspection: No
3. Is site currently under notice of violation? Yes
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: June 02,2022
9. Corrective action needed:
10. Comments: Project complete. All disturbed areas stabilized with adequate ground cover.
Project closed.
Reported by: Chris Baker Others present:
Date of inspection: June 01,2022 Time arriving on site: 10:00 AM Time leaving site: 10:30 AM
CC: