HomeMy WebLinkAboutSWA000100_Fast Track Form_20210618 NC Department
•
Environmental Qualofity
LaBetLa Received
JUN182021
Powered by partnership.
Winston-Salem
To: NCDEMLR Regional Office
State Stormwater Mgmt Program Date: 6/16/21 Project#: 2210366
WSRO Re: The lake at Spicewood- Phase 1
450 W Hanes Mill Rd. Ste 300 State ATC permit number SWA000ioo
Winston-Salem, NC 27105
Attn: Mr.Jim Farkas
We are sending you: ® Attached 0 Under Separate Cover
El Shop Drawings ❑ Prints ® Plans ❑ Samples ❑ Specifications
El Copy of Letter El Change Order ❑ Please Sign and Return El
Copies Date No. Description
6/15/21 Fast Track Commencement Form
•
These are transmitted
❑ For Approval El Reviewed ❑ Resubmit Copies for approval
❑ For Your Use El Furnish as corrected ❑ Submit Copies for distribution
❑ As Requested El Returned for corrections ❑ Return Corrected prints
El For Review and Comment ❑
El For Bids due
Comments
. This is a copy of the fast track commencement form. The initial grading and erosion control is just beginning on this project and the
erosion control plan approval was obtained by the City of Winston-Salem. It will most likely be around 5-6 months before the
construction of the permanent stormwater control measures begin.
Copy to:
(❑)w/enc.
Signed: Paul Stimpson
(❑)w/enc
• (❑)w/enc
939 Burke Street. Suite H Winston-Salem, NC 27101 p(704)560-8514
4rnvv�r labellapc.corn
•
•
•
•
•
•
•
•
< 1. _. _ .
- ' State Stormwater Management Systems
Permit No. SWA000100
Attachment A
Fast Track Construction Commencement Form
ATC Permit No. SWA000100
The Lake at Spicewood — Phase 1
Forsyth County
Complete and submit this form (NO SUBSTITUTES)to the Winston-Salem Regional Office
The undersigned hereby notifies the agency below that the construction of this project is expected to
commence on //sc/Zl (mm/dd/yyyy) and is expected to be completed by
IL/5 f 2Z (m /dddl/yyyy). I understand that this project shall not be considered complete until
title Division has received the tmat rast-i ram stormwater t'ermit Application corm and an
requirea supporting dcocamertratron.
_____If .. ,4,1_44ceer 5:47*e./
Signature of Per Holder Title (if a ) Date
Designer's Certification
I U A , S 7./N!i2Sa� , as a duly regist�e��eed Licensed Professional in the State of •
North Carolina, having been authorized to observe ( L—periodically, 0 weekly, 0 full time) the
construction of the subject project on behalf of the Permittee. I hereby state that, to the best of my
abilities, due care and diligence will be used such that the project and all stormwater control measures
(SCMs) shall be constructed to meet all applicable requirements of 15A NCAC 02H Section .1000-
.1062, including the Minimum Design Criteria (MDC).
`\\\ti,trrr7loi
\•‘ N CA R '
'•,"
North Carolina Licensed Professional Seal, signature, ••��� 's s. .
and date:
EAL
22052 •
•
/24, lle,i_ 45-COct4 G I NS •
a 31 13u�ke Srr;cfi 5� ,H ST V ,0\
• Su km N " z1r�1 /�r /,6/Z .. .y�1,
W 'vicpyt.
It is highly recommended that this notification be sent in a manner that provides proof of receipt by the
Division. The Division does not acknowledge receipt of Fast Track Construction Commencement Notification
Forms.
Submit this form to the following Office:
Division of Energy, Mineral and Land Resources c%Jim Farkas
State Stormwater Management Program
Winston-Salem Regional Office
450 W. Hanes Mill Rd., Ste 300
Winston-Salem, NC 27105