Loading...
HomeMy WebLinkAboutNCS000573_Letter_20201211 ROY COOPER I Governor ItZi'IvIICHAEL S.REGAN Secretary ��� BRIAN WRENN NORTH CAROLINA Director EtrotronmentalQuatt+P CERTIFIED MAIL#: 7017 1450 0001 6450 7350 RETURN RECEIPT REQUESTED December 11,2020 Duke Energy Carolinas,LLC Attn: Michael Lanning, General Manager III,Regulated Stations Belews Creek Steam Station 3195 Pine Hall Rd. Belews Creek,NC 27009 Subject: NPDES Stormwater Permit No.NCS000573 Response to NPDES Storm Water Discharge Monitoring Report for October 2020 Belews Creek Steam Station Stokes County Dear Mr. Lanning: The Division of Energy, Mineral and Land Resources (DEMLR) has reviewed your letter dated November 13, 2020 regarding the October 2020 NPDES Storm Water Discharge Monitoring Report for the subject facility. The letter states that SW006 is in Tier III status for Copper and Zinc and that corrective actions have been implemented to bring SW006 into compliance. The monitoring report provided shows"no qualifying flow for the month of October 2020"for SW006. Part II, Section B of the above referenced permit lists several actions that DEMLR may require of the permittee upon notification of Tier Three status. In order for DEMLR to evaluate if additional action will be required of the permittee,the following information is being requested at this time: 1. A summary of analytical data for SW006 since the date of the first exceedance for Copper and/or Zinc. 2. A summary of corrective actions which have been taken since the date of the first exceedance for Copper and/or Zinc at SW0006. 3. Any documentation that has been maintained in association with the tiered response for SW006 during this permit cycle. North carodna par�c of Ebvtra<mrm ca Aogii hi.4 tal 1n Dty I not Erw gy.r and Land Resources J ' oe nston-S dem Regional Office 1450 Hanes l�Road.Star Sao I Wtrmr srsalcm,North Canaria 27103 -.,.,.7 3 36 Wrre.saoa Response to NPDES Storm Water Discharge Monitoring Report for October 2020 Duke Energy Carolinas, LLC December 11,2020 Page 2 of 2 Please provide the requested information within 30 days of receipt of this letter or the last business day in January, whichever is later. If you have any questions or need further information,please contact Zac Lentz at(336) 776-9661. Sincerely, Tamers Epl' E Regional E gineer Land Quality Section Enclosures: Compliance Inspection Report c: WSRO—DEMLR, Stormwater Files U