HomeMy WebLinkAboutNCG050447_NOV_20240308 ROY COOPER
Governor
j '
ELIZABETH S.BISERa;n �
Secretary
WILLIAM E.TOBY VINSON,JR. NORTH CAROL-INA
Interim Director Environmental Quality
March 8, 2024
CERTIFIED MAIL 7022 0410 00003 2707 0049
RETURN RECEIPT REQUESTED
Darnel Inc.
Attention: Mike Curry
1809 Airport Road
Monroe,North Carolina 28110
Subject: NOTICE OF VIOLATION (NOV-2024-PC-0149) and
NPDES Stormwater General Permit NCG050000
Darnel Inc.
Darnel Inc-Monroe, Certificate of Coverage NCG050447
Union County
Dear Mr. Curry:
On February 22, 2024, Lily Kay from the Mooresville Regional Office of the Division of Energy, Mineral
and Land Resources (DEMLR), conducted a site inspection for the Darnel Inc -Monroe facility located at
1809 Airport Road, Union County, North Carolina. A copy of the Compliance Inspection Report is
enclosed for your review. Mike Curry was also present during the inspection and his time and assistance is
greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES
Stormwater General Permit NCG050000 under Certificate of Coverage NCG050447. Permit coverage
authorizes the discharge of stormwater from the facility to receiving waters designated as Dry Fork, class
C waters in the Yadkin Pee-Dee River Basin.
As a result of the site inspection, the following permit condition violation(s) are noted:
1) Stormwater Pollution Prevention Plan (SWPPP)
The Stormwater Pollution Prevention Plan (SWPPP) was available at the time of inspection, but
documentation of annual certification, monthly and annual facility inspection reports, annual non-
stormwater discharge inspection report, and annual employee trainings were not available at the time of
inspection.
Other Observations
The facility only samples one outfall from the retention pond in the front of the facility but at least two
other outfalls were identified during the inspection. There was a significant amount of debris from the
North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources
Mooresville Regional Office 1610 East Center Avenue,Suite 3011 Mooresville,North Carolina 28115
704-235-2100
NOTICE OF VIOLATION
Darnel Inc.
March 8, 2024
Page 2 of 2
discarded rolls of unusable materials in the stormwater channels and around the pond. Further action is
needed to address this issue.
Requested Response
You are asked to respond to this office,in writing,within 20 calendar days from receipt of this notice.Your
written response should include a reasonable explanation as to why the aforementioned violation(s) have
occurred as well as a Plan of Action to prevent these violation(s) from recurring.
Action Items
• Immediately review and amend the facility's SWPPP as needed and incorporate documentation
pertaining to the annual update requirements of the permit. Submit a copy of the updated SWPPP,
including documentation of the inspections and trainings,by May 24, 2024.
• Conduct and record analytical and qualitative monitoring per the conditions of the permit for all
industrial stormwater outfalls and submit the Discharge Monitoring Reports on the eDMR website.
• Submit a Corrective Action Plan for the debris issues on the site with a timeline for the actions to be
completed by May 24, 2024.
Thank you for your attention to this matter. This Office is considering sending a recommendation for
enforcement to the Director of the Division of Energy, Mineral & Land Resources regarding these issues.
Your above-mentioned response to this correspondence will be considered in this process. This office
requires that the violations, as detailed above, be properly resolved. These violations and any future
violations are subject to a civil penalty assessment of up to$25,000 per day for each violation. Should
you have any questions regarding these matters, please contact Lily Kay or myself at(704) 235-2100.
Sincerely,
EDocuSigned by:
4A35D6602B02438...
Jerry W. Eplin, PE
Acting Regional Engineer
Land Quality Section
LK/JWE/cys
Enclosure: Compliance Inspection Report
c: Mike Lawyer, CPSWQ, Stormwater Program Supervisor—DEMLR
Brad Cole, PE, Chief of Regional Operations —DEMLR
DEMLR NPDES Stormwater Permit Laserfiche File
North Carolina Department of Environmental Quality I Division of Energy,Mineral,and Land Resources
E Q ie�p_z�
Mooresville Regional Office 1610 East Center Avenue,Suite 3011 Mooresville,North Carolina 28115
704-663-1699
Compliance Inspection Report
Permit:NCG050447 Effective: 06/06/23 Expiration: 05/31/28 Owner: Darnel Inc
SOC: Effective: Expiration: Facility: Darnel Inc- Monroe
County: Union 1809 Airport Rd
Region: Mooresville
Monroe NC 28110
Contact Person:Mike Curry Title: Phone: 704-800-5178
Directions to Facility:
Site is located approx. 0.4 miles southwest of the intersection of Airport Road and Old Charlotte Hwy(SR1009)Road in Monroe
Union Count NC.
System Classifications: SWNC,
Primary ORC: Certification: Phone:
Secondary ORC(s):
On-Site Representative(s):
Related Permits:
Inspection Date: 02/22/2024 Entry Time 12:30PM Exit Time: 01:50PM
Primary Inspector:Lily C Kay Phone: 704-663-1699
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Apparel/Printing/Paper/Leather/Rubber Stormwater Discharge COC
Facility Status: ❑ Compliant Not Compliant
Question Areas:
Storm Water
(See attachment summary)
Page 1 of 4
Permit: NCG050447 Owner-Facility:Darnel Inc
Inspection Date: 02/22/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The Stormwater Pollution Prevention Plan (SWPPP)was available at the time of inspection, but documentation of annual
certification, monthly and annual facility inspection reports, an annual non-stormwater discharge inspection report, and
annual employee trainings were not available at the time of inspection. An updated SWPPP with documentation of the
inspections and trainings, analytical and qualitative monitoring reports for all outfalls, and a plan of corrective action for the
debris with a timeline must be submitted to the Mooresville Regional office by May 24, 2024, or enforcement action including
penalties of up to $25,000 per day may be taken. If you have questions, contact me at Lily.Kay@ncdenr.gov or by phone at
(704)235-2137.
Page 2 of 4
Permit: NCG050447 Owner-Facility:Darnel Inc
Inspection Date: 02/22/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Stormwater Pollution Prevention Plan Yes No NA NE
Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑
#Does the Plan include a General Location (USGS) map? ❑ ❑ ❑
#Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑
#Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑
#Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑
#Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑
#Does the facility provide all necessary secondary containment? ❑ ❑ ❑
#Does the Plan include a BMP summary? ❑ ❑ ❑
#Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑
#Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑
#Does the facility provide and document Employee Training? ❑ 0 ❑ ❑
#Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑
# Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑
#Does the Plan include a Stormwater Facility Inspection Program? ❑ 0 ❑ ❑
Has the Stormwater Pollution Prevention Plan been implemented? ❑ 0 ❑ ❑
Comment: The Stormwater Pollution Prevention Plan (SWPPP)was available at the time of inspection, but
documentation of annual certification, monthly and annual facility inspection reports, an annual
non-stormwater discharge inspection report, and annual employee trainings were not available
at the time of inspection.
Qualitative Monitoring Yes No NA NE
Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑
Comment: Qualitative monitoring has been conducted semiannually. The permit reissued in June of 2023
requires quarterly sampling starting first quarter of 2024.
Analytical Monitoring Yes No NA NE
Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑
#Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 0 ❑ ❑
Comment: Analytical monitoring has been conducted semiannually. The permit reissued in June of 2023
requires quarterly sampling starting first quarter of 2024.
Permit and Outfalls Yes No NA NE
# Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑
#Were all outfalls observed during the inspection? ❑ ❑ ❑
# If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑
#Has the facility evaluated all illicit(non stormwater)discharges? ❑ ❑ ❑
Page 3 of 4
Permit: NCG050447 Owner-Facility:Darnel Inc
Inspection Date: 02/22/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine
Comment: The facility only samples one outfall from the retention pond in the front of the facility but at
least two other outfalls were identified at the inspection. There was a significant amount of
debris from the discarded rolls of unusable materials in the stormwater channels and around
the pond. Further action is needed to address this issue.
Page 4 of 4