HomeMy WebLinkAboutNCC240675_ESC Approval Submitted_20240308 From: Matthew nsboms
Tre Syyuwali-engsurv.eoo
Ce: RE:l000;mosey allied-enasnrcrgm;yy�ry NAOMI
u
Subject: [EHERNPLI Lyndon Steel Building Addition(previously approved AEN2300305,on 2/9/24)
Date: Thursday,March 07,202410:35:12 PM
Kay,
I have revised the approval email below to match the FRO form you attached.
Number of Recipients: 1
Sent: 02/09/2024 10:22:59 AM
Sent by: Matthew Osbome
To: wpallen.beta@gmail.com
Cc:
Bcc:
Subject: Review Completed-Metal Building for Lyndon Steel Company
Attachments:
cry of
I I WINSCONSALEM
NORTH caaowa4
Application Type:04.02)Grading/Erosion Control Permit
Workflow:04.02)Grading&Erosion Control
Project:Metal Building for Lyndon Steel Company
A/P S:EN2300305
Acreage to be Disturbed:1.39
https://wnston-salem geocivix.com/secure/projectPprojectid=1200713
Hello Lyndon Steel Company,LLC.,
Thank you for submitting your project to City of Winston-Salem.Review of the Erosion Control Plan for this
project has been completed.The design is adequate to meet the ordinance standards and the plan has been
approved.
Be aware that this plan shall expire three(3)years following the date of approval,if no land disturbing activity
has been undertaken,as is required by Title 15A NCAC 4B.0129.Also,acceptance and approval of this plan
is conditioned upon compliance with Federal and State water quality laws,regulations,and rules.
If you have not already done so,please provide an original signed and notarized Financial
Responsibility/Ownership(FRO)form as applicable.This document is required prior to the issuance of the
Grading/Erosion Control Permit.If this has already been provided,then please disregard this statement.
Reminder that a completed FRO form is not required in the instance where a project qualifies to use the HB
489 Sketch Erosion Control Plan document.
If this project will disturb more than 1 acre or is part of a larger common plan of development,the
Grading/Erosion Control Permit cannot be issued until documentation is provided that coverage under the
NCGOI Construction Stormwater Permit(NPDES)has been obtained.Please obtain coverage under the pemtit
at the following website(fittps://edocs.deq.nc.gov/Forms/NCG01-N01).Once coverage is obtained,please
upload a copy of the Certificate of Coverage(COC)to the project documents in the electronic plan review
system.The Grading/Erosion Control Permit will not be issued until proof of coverage under NCGO l is
provided.Please direct questions about the eNOI form to NCDEQ-DEMLR Stormwatrr Program staff in the
Raleigh central office.If the owner/operator of this project changes in the future,the new responsible party
must obtain a new COC.***This approval email serves as the"Approval Letter"that must be
uploaded when filing the e-NOI application to obtain the NCGOI Certificate of Coverage.."*
As outlined in the Unified Development Ordinances(UDO)of Winston-Salem/Forsyth County,Village of
Clemmons,Town of Lewisville,and Town of Walkertown,Erosion Control Division staff may periodically
inspect sites of land disturbing activity to determine compliance with the Erosion Control ordinances and the
approved Erosion Control Plan.No person shall willfully resist,delay,or obstruct an authorized
representative,employee,or agent of the Erosion Control Division while that person is inspecting or attempting
to inspect a land disturbing activity under the ordinance.
Should you have any questions as you move forward please contact Kent Wall at 336-462-
7481 or kentw@a citvofws.orn.
Matthew Osborne,CFM,CPESC
Stormwater Operations Analyst
City Of Winston-Salem
Field Operations Department
Stormwater Division
PO Box 2511(Mailing)
101 N.Main Street(Physical)
Winston-Salem,NC 27101(27102 for PO Box)
Office:336-747-6919
Mobile:336-462-7480