No preview available
HomeMy WebLinkAbout20220140 Ver 3_USACE Permit_20240308Baker, Caroline D From: Thompson, Emily B CIV USARMY CESAS (USA) <Emily.B.Thompson@usace.army.mil> Sent: Friday, March 8, 2024 8:52 AM To: Landon Younce Cc: Leo Green III; Thomas, Zachary T Subject: RE: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) Attachments: 20240308_SAW-2023-02326 NWP 58.pdf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good morning/happy Friday! Please see the attached NWP 58 verification with special conditions for the proposed sewer improvement project in Wilson County, NC. I have also included NWP 58 with the General and Regional conditions. Please let me know if you have any questions. Respectfully, Emily Emily B. Thompson Team Lead / Charleston District Liaison SAD Technical Regional Execution Center (TREC) U.S. Army Corps of Engineers Mailing Address: 2407 W. 5th Street, Washington, NC 27889 Email: Emily. B.Thompsona-usace.army.mil From: Landon Younce <I.younce@greeneng.com> Sent: Wednesday, March 6, 2024 4:33 PM To: Thompson, Emily B CIV USARMY CESAS (USA) <Emily.B.Thompson@usace.army.miI> Cc: Leo Green III <elg3@greeneng.com> Subject: [Non-DoD Source] FW: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 2B / Wilson / Wilson County) Emily, Please find attached Data from Jeff, regarding the Upper Bloomery Swamp, Phases 2A and 2B... Za alo r W. Landon Younce, P.E. * -1 XII I Engineering PO Box 609 303 Goldsboro St E Wilson, NC 27893 Phone: (252) 237-5365 Fax: (252) 243-7489 I. younce@qreeneng.com www.greeneng.com From: Harbour, Jeff W <Jeff.Harbour@terracon.com> Sent: Wednesday, March 6, 2024 10:36 AM To: Landon Younce <I.younce@greeneng.com> Cc: Leo Green III <elg3@greeneng.com>; Jon Meade <i.meade@greeneng.com> Subject: RE: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) See attached. Jeff Harbour, PWS Senior Scientist I Natural Resources r con 2401 Brentwood Road, Suite 107 I Raleigh, NC 27604 D (919) 547-1080 I M (919) 805-4208 jeff.harbour@terracon.com I Terracon.com From: Landon Younce <I.younce@greeneng.com> Sent: Monday, March 4, 2024 7:30 AM To: Harbour, Jeff W <Jeff.Harbour@terracon.com> Cc: Leo Green III <elg3@greeneng.com>; Jon Meade <i.meade@greeneng.com> Subject: RE: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) Jeff, The Buffer and Wetlands Impacts drawings for Upper Bloomery Phase 2 are attached. I can get you CAD files if you need something electronic, but this is what was submitted to the Corps. Za alo.y r T11 En inn rir I.Vounce@qreeneng.com www.greeneng.com From: Harbour, Jeff W <Jeff.Harbour@terracon.com> Sent: Thursday, February 29, 2024 3:01 PM To: Landon Younce <I.younce@greeneng.com> Cc: Leo Green III <elg3@greeneng.com>; Jon Meade <i.meade@greeneng.com> Subject: RE: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) I removed Emily here, but if we can get a copy of the survey/plans/etc. that shows the size of the wetland areas that were within the LOD, then I can do the spreadsheet she mentions. I sent you the data forms I believe yesterday. Thanks! Jeff Harbour, PWS Senior Scientist I Natural Resources . wilerracon 2401 Brentwood Road, Suite 107 I Raleigh, NC 27604 D (919) 547-1080 I M (919) 805-4208 jeff.harbour@terracon.com I Terracon.com From: Thompson, Emily B CIV USARMY CESAS (USA) <Emily.B.Thompson@usace.army.mil> Sent: Thursday, February 29, 2024 2:54 PM To: Landon Younce <I.younce@greeneng.com>; Harbour, Jeff W <Jeff.Harbour@terracon.com> Cc: Leo Green III <elg3@greeneng.com>; Jon Meade <i.meade@greeneng.com> Subject: RE: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) Hi Landon, Yes, Shane Staples will be reviewing this project. I have provided him the information you submitted recently as well. Sincerely, Emily Emily B. Thompson Team Lead / Charleston District Liaison SAD Technical Regional Execution Center (TREC) U.S. Army Corps of Engineers Mailing Address: 2407 W. 5th Street, Washington, NC 27889 Email: Emily. B.Thompsona-usace.army.mil From: Landon Younce <I.younce@greeneng.com> Sent: Wednesday, February 28, 2024 7:48 AM To: Thompson, Emily B CIV USARMY CESAS (USA) <Emily.B.Thompson@usace.army.mil>; Harbour, Jeff W <Jeff.Harbour@terracon.com> Cc: Leo Green III <elg3@greeneng.com>; Jon Meade <i.meade@greeneng.com> Subject: [Non-DoD Source] RE: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) Importance: High Emily, Apologies for the confusion. We've had Jeff working on a number of various projects for us. I had requested assistance on filling out the tables (information) you requested and I must have inadvertently directed him towards the other project .... the Buckhorn Water Mains project (he is also working on for us). I have copied Jeff with this email to ensure he understands the additional information you are requesting is for the Upper Bloomery Swamp Sewer Improvements Phase 2 project. Your original request stated: "Did Terracon provide datasheets to support their delineation? I can contact them directly to streamline information needed if that would be helpful. It would be great if they could fill out the Aquatic Resources tab in the attached spreadsheet- this will make data entry a lot easier. " Jeff, Please provide this data for the Upper Bloomery Swamp Sewer Improvements project. You had initially provided it for the Wilson County Buckhorn Water project and I did not catch that in time... Also, Emily & Jeff, since we are on that subject, and as you may already be aware, the "Wilson County Southwest Water District - Buckhorn Pressure Zone - Water System Extensions... " project PCN now has been RE -submitted (as required by NCDEQ — Travis Zachary's crowd) in order to receive their proper oversight and approval. Emily, I believe your office has already acknowledged receipt and the reviewer is named Shane Staples? The project ID remains the same... SAW-2023-01861 W. Landon Younce, P.E. giEnglineedog PO Box 609 303 Goldsboro St E Wilson, NC 27893 Phone: (252) 237-5365 Fax: (252) 243-7489 I.younce@qreeneng.com www.greeneng.com WILSO PN: 23-074 From: Thompson, Emily B CIV USARMY CESAS (USA) <Emily.B.Thompson@usace.army.mil> Sent: Tuesday, February 27, 2024 8:22 AM To: Landon Younce <I.younce@greeneng.com> Cc: Leo Green III <elg3@greeneng.com>; Jon Meade <i.meade@greeneng.com> Subject: RE: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 2B / Wilson / Wilson County) Hi Landon, I'm looking over the information sent and realize that we're getting our wires crossed — this email chain/information request is for Upper Bloomery Swamp, while the information you sent is for Buckhorn. Please provide the requested for this project (see attached email). Sincerely, Emily Emily B. Thompson Team Lead / Charleston District Liaison SAD Technical Regional Execution Center (TREC) U.S. Army Corps of Engineers Mailing Address: 2407 W. 5th Street, Washington, NC 27889 Email: Emily. B.Thompsona-usace.army. miI From: Thompson, Emily B CIV USARMY CESAS (USA) Sent: Wednesday, February 14, 2024 3:53 PM To: Landon Younce <I.younce@greeneng.com> Cc: Leo Green III <elg3@greeneng.com>; Jon Meade <i.meade@greeneng.com> Subject: RE: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 2B / Wilson / Wilson County) Received, thank you! Emily B. Thompson Team Lead / Charleston District Liaison SAD Technical Regional Execution Center (TREC) U.S. Army Corps of Engineers Mailing Address: 2407 W. 5th Street, Washington, NC 27889 Email: Emily. B.Thompsona-usace.army. mil From: Landon Younce <Lyounce@greeneng.com> Sent: Wednesday, February 14, 2024 10:36 AM To: Thompson, Emily B CIV USARMY CESAS (USA) <Emily.B.Thompson@usace.army.mil> Cc: Leo Green III <elg3@greeneng.com>; Jon Meade <i.meade@greeneng.com> Subject: [Non-DoD Source] FW: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 2B / Wilson / Wilson County) Importance: High Emily, Please reference attached data from Jeff Harbour. La4w&r W. Landon Younce, P.E. Engineering PO Box 609 303 Goldsboro St E Wilson, NC 27893 Phone: (252) 237-5365 Fax: (252) 243-7489 I. younce@qreeneng.com www.greeneng.com From: Harbour, Jeff W <Jeff.Harbour@terracon.com> Sent: Wednesday, February 14, 2024 9:45 AM To: Landon Younce <I.younce@greeneng.com> Cc: Jon Meade <i.meade@greeneng.com> Subject: RE: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) Landon, Here is the data that can be sent to Emily for the water line crossings. Jeff Harbour, PWS Senior Scientist I Natural Resources wilerracon 2401 Brentwood Road, Suite 107 I Raleigh, NC 27604 D (919) 547-1080 I M (919) 805-4208 jeff.harbour@terracon.com I Terracon.com From: Thompson, Emily B CIV USARMY CESAS (USA) <Emily.B.Thompson@usace.army.mil> Sent: Thursday, February 1, 2024 5:37 PM To: Landon Younce <I.younce@greeneng.com> Subject: RE: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) Hi Landon, Did Terracon provide datasheets to support their delineation? I can contact them directly to streamline information needed if that would be helpful. It would be great if they could fill out the Aquatic Resources tab in the attached spreadsheet — this will make data entry a lot easier. Sincerely, Emily Emily B. Thompson Team Lead / Charleston District Liaison SAD Technical Regional Execution Center (TREC) U.S. Army Corps of Engineers Mailing Address: 2407 W. 5th Street, Washington, NC 27889 Email: Emily. B.Thompson(causace.army. mil From: Landon Younce <I.younce@greeneng.com> Sent: Thursday, February 1, 2024 2:23 PM To: Thompson, Emily B CIV USARMY CESAS (USA) <Emily.B.Thompson@usace.army.mil> Cc: Thomas, Zachary T <zachary.thomas@deg.nc.gov> Subject: [Non-DoD Source] RE: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 2B / Wilson / Wilson County) Importance: High Emily, Yes, please find attached information compiled for the project (through Terracon) A surface water determination was made, which I have also attached. Travis, if there is any additional information you need, please let me know (As in, do we need to resubmit or will you handle the review another way ?) Laedolr Engineering I. Vounce@qreeneng.com www.greeneng.com From: Thompson, Emily B CIV USARMY CESAS (USA) <Emily.B.Thompson@usace.army.mil> Sent: Monday, January 29, 2024 2:48 PM To: Landon Younce <I.younce@greeneng.com> Cc: Thomas, Zachary T <zachary.thomas@deg.nc.gov> Subject: RE: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 2B / Wilson / Wilson County) Hi Landon, Do you have the delineation information for these phases because SAW-2021-01969 was for phase 1 (referenced in the PCN)? We will need this information to review and be able to input the impacts into our ORM database. Thank you, Emily Emily B. Thompson Team Lead / Charleston District Liaison SAD Technical Regional Execution Center (TREC) U.S. Army Corps of Engineers Mailing Address: 2407 W. 5th Street, Washington, NC 27889 Email: Emily. B.Thompsona-usace.army. mil From: Landon Younce <I.younce@greeneng.com> Sent: Tuesday, January 23, 2024 2:41 PM To: Thomas, Zachary T <zachary.thomas@deg. nc.gov> Cc: Thompson, Emily B CIV USARMY CESAS (USA) <Emily.B.Thompson@usace.army.mil> Subject: [Non-DoD Source] RE: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) Thank you for getting back with me. Yes, our project will be crossing Neuse Buffers as the existing Sewer Main is being completely replaced in its original location, which crosses Bloomery Swamp in a few areas. So, in the future, I should be checking the box NO, to allow for review on the DWQ side... Do I need to resubmit, to get this in your hands for review? This is an emergency repair project by the City and time is of the essence, as some areas are infiltrating sewer below ground, as was the case on earlier project phases, downstream. Lavlo r Engineering I.younce@qreeneng.com www.greeneng.com From: Thomas, Zachary T <zachary.thomas@deg.nc.gov> Sent: Tuesday, January 23, 2024 2:30 PM To: Landon Younce <I.younce@greeneng.com> Cc: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Subject: RE: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) Hi Landon, It looks like your original submittal was filed as a courtesy copy because the "for the record only' radio button was checked: te. Is this notification safely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Carps Permit- Yes Na Does your project trigger any of the thresholds for GC4276 or require written authorization for buffer impacts? Thank you, Zach Thomas Environmental Program Consultant, Division of Water Resources North Carolina Department of Environmental Quality Office: (919) 791-4255 zachary.thomas@deg.nc.gov Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Landon Younce <I.younce@greeneng.com> Sent: Tuesday, January 16, 2024 12:24 PM To: Thomas, Zachary T <zachary.thomas@deg.nc.gov> Subject: [External] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) Importance: High CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. In checking back through my emails I find that there was some confusion during our original submittal. If this was due to an error on our end, I apologize. Also, I did not include the original PCN application I intended to in the first email. Please reference the Attached: "Pre -Construction Notification — PCN Form — PHASE 2A and 2B — 11-28- 23" as it was originally submitted. I'm not sure why your office could not review... This is new to me, I haven't had a situation before where the Form did not end up under review by both agencies. Thank you, La4wOr W. Landon Younce, P.E. REngineeft PO Box 609 303 Goldsboro St E Wilson, NC 27893 Phone: (252) 237-5365 Fox: (252) 243-7489 I.Younce@qreeneng.com www.greeneng.com From: Landon Younce Sent: Tuesday, January 16, 2024 9:13 AM To: Thomas, Zachary T <zachary.thomas@deg.nc.gov> Subject: FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 2B / Wilson / Wilson County) Importance: High Mr. Thomas, The City of Wilson has moved the Upper Bloomery Swamp Sewer project up on their list of Top Priority sewer replacement projects this year. As with the Lower Bloomery project, and Phase One of Upper Bloomery project completed last year ... these sewer replacements are desperately needed to prevent any further seepage of sewer downstream. Do you foresee a 401 Water Quality Certification being required in this case... Is one typically required for replacement projects ? Lavlo r W. Landon Younce, P.E. T I Engineering PO Box 609 303 Goldsboro St E Wilson, NC 27893 Phone: (252) 237-5365 Fox: (252) 243-7489 I.Younce@qreeneng.com www.greeneng.com WILSO PN: 23-074 From: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Sent: Thursday, January 4, 2024 2:28 PM To: Jon Meade <i.meade@greeneng.com> Cc: Leo Green III <eIg3@greeneng.com>; Landon Younce <I.younce@greeneng.com>; Thomas, Zachary T <zachary.thomas@deg.nc.gov> Subject: RE: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 2B / Wilson / Wilson County) Hi Jon, 10 I appreciate you providing the updated plans and background on this project. I have copied Zach to stay up to date on this one as well — the PCN and plans appear to have proposed buffer impacts, so I want to confirm whether this project would require a written buffer authorization. As stated in Zach's email (attached) from December 21st, if it does then an individual 401 WQC is required, and you'll need to follow their process for reviewing the application. Zach, I have enclosed the PCN and most recent plans. I hope to clear this up to avoid delays in the permitting process, but I cannot issue the permit verification until the individual 401 WQC is issued if one is required for the proposed project. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army.mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: httos://reaulatorv.00s.usace.armv.mil/customer-service-survev/ Thank you for taking the time to visit this site and complete the survey From: Jon Meade <j.meade@greeneng.com> Sent: Thursday, January 4, 2024 9:09 AM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Cc: Leo Green III <elg3@greeneng.com>; Landon Younce <I.younce@greeneng.com> Subject: [Non-DoD Source] FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) Hey Emily, Good morning. Please see below in red our responses to your December 27, 2023 comments and updated plans attached. Wanted to give you some extra background on the project. Due to the age of the existing 15" sanitary line (+40 years), the City of Wilson has experienced nine (9) sanitary sewer overflows (SSOs) within the past 24 months due to pipe deterioration and it has become increasingly necessary to replace the existing line. The initial replacement plan was to install a parallel line but to reduce potential additional wetland impacts through conversion of forested areas and the need for additional easements, it was determined to replace the existing line within the same footprint. Due to increased development upstream, it was also determined to increase the line size from 15-in to 24-in. Most of the new manholes will be placed at the same location as the existing manholes. In an effort to reduce cost, several existing manhole locations were completely eliminated. Due to the "emergency" situation of the need for replacement, construction is underway to bore under Hwy 42 then installing new 24-in pipe and manholes from SSMH #11 to SSMH #15 (identified as Phase 2A). There will be no areas within wetlands that will require conversion from wooded to cleared area. Work within wetlands areas will be within the existing maintained easement and manholes will be removed and replaced. This work has been permitted under Permit No. WQ0042692. Thanks Emily, please let us know if you require any further information/documentation or have any additional questions. We look forward to your response. 11 From: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Sent: Wednesday, December 27, 2023 10:35 AM To: Jon Meade <j.meade@greeneng.com> Cc: Landon Younce <I.younce@greeneng.com> Subject: RE: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 2B / Wilson / Wilson County) Good morning John, I hope you've enjoyed/are enjoying the holidays! I'm reviewing this project and have a few comments/questions: Will the replacement of the 15-in to 24-in gravity sewer pipes happen a distance beside the existing or within the existing alignment of the 15-in? The 24-in gravity line will be installed in the same alignment (trench) as the existing 15-in pipe. Two areas that are different alignment are Phase 2A SSMH#11 to SSMH#12 and Phase 2B SSMH#36 to SSMH#38 , both of which fall outside of any wetlands. Are these areas currently maintained or forested? These areas are currently cleared and maintained minus the two exceptions above. From the plans and looking at aerials, it appears it's within a maintained easement, but the plans don't show the forested areas once the project crosses over Airport Road. This is an oversite by us and the wooded areas have been added to the plans to help clarify. 2. For the described areas of new 15-in (45 LF) and 8-in pipes (290 LF), is this within an existing, maintained easement or would these areas require new permanent conversion impacts within wetlands? These areas are within an existing maintained easement. 3. 1 see manholes and "equality stations" proposed within the wetlands. These would be permanent impacts (loss of wetlands) because those areas would not be restored after the project is complete. If there are existing manholes that would be replaced within the exact footprint, then those impacts were likely accounted for in the original permit. a. It appears that some of these manholes could be moved slightly to be constructed out of the wetlands, which would show further minimization efforts. Proposed SSMH #16 (which falls at a new location) was shifted from Station 13+00 to Station 13+33.74 to avoid additional permanent wetland impacts. The remainder of the proposed manholes located within wetland areas will simply replace the existing manholes. 4. These easements have conversion impacts, not permanent fill/loss impacts as proposed, please ensure that the project will not result in above grade fills in wetlands. As we discussed before, if the applicant wants a road, then that is not what would be permitted by this project. The City has maintained and accessed this area for over 40 years as is so there would not be any need to place permanent fill placed in wetland areas. We plan to add the following statement to the construction plan sheets to emphasize to the contractor this requirement: "All locations that are identified as "Wetlands" within the construction corridor that are disturbed by any means during the installation of the proposed gravity sanitary sewer line shall be restored to preconstruction (existing) grade(s). The gravity sanitary sewer lines and/or manholes that are installed in areas identified as "Wetlands" shall not be approved for payment until either the City of Wilson or a Third Party providing observation services for the City of Wilson has verified in writing that the disturbed area has been restored to the preconstruction (existing) grade(s)." Please provide responses below each question — this helps with organizing our administrative record. Please update any impacts that are not addressed currently. If you have any questions, please let me know. Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 12 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily. B.Thompsona-usace.army. mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: https://regulatory.ops.usace.army.mil/customer-service-survey/ Thank you for taking the time to visit this site and complete the survey. From: Jon Meade <i.meade@greeneng.com> Sent: Wednesday, December 20, 2023 4:14 PM To: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Cc: Landon Younce <I.younce@greeneng.com> Subject: [Non-DoD Source] RE: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) Hey Emily, Landon jus forwarded me your request for Upper Bloomery KMZ file. Let me know if this works for you. Thanks! jon Jon Meade; PhD, PE Green Engineering, PLLC 303 Goldsboro Street E Wilson, North Carolina 27893 252-237-5365 (Phone) 252-243-7489 (Fax) j.meade(a-greeneng.com From: Landon Younce <I.younce@greeneng.com> Sent: Wednesday, December 20, 2023 3:15 PM To: Jon Meade <i.meade@greeneng.com> Subject: FW: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) Jon, Sorry, I believe I neglected to send this to you last week. Emily is asking for a kmz file for Upper Bloomery project.... Similar to what we have sent her in the past. So she can review on Google Earth I presume. Can you provide this to her ? Larclor From: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Sent: Thursday, December 14, 2023 4:32 PM To: Landon Younce <I.younce@greeneng.com> 13 Subject: RE: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) Hi Landon, Could you send me a kmz for Google Earth Pro of the proposed project? This would facilitate my review of this project Sincerely, Emily Emily B. Thompson Regulatory Specialist U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W. 5th Street Washington, NC 27889 (910) 251-4629 Emily.B.Thompsona-usace.army.mil We at the U.S. Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: httos://reaulatorv.00s.usace.armv.mil/customer-service-survev/ Thank you for taking the time to visit this site and complete the survey From: DAMERON, Nichola M (Nikki) CIV USARMY CESAW (USA) <Nichola.M.Dameron@usace.army.mil> Sent: Thursday, November 30, 2023 10:32 AM To: I.younce@greeneng.com Cc: Thompson, Emily B CIV USARMY CESAW (USA) <Emily.B.Thompson@usace.army.mil> Subject: SAW-2023-02326 (Upper Bloomery Swamp Sewer Improvements Phase 2A and 213 / Wilson / Wilson County) Good morning, Your project has been received and assigned to Emily Thompson with the subject ID number. Please use this number for any further correspondence. Thank you, Nichola "Nikki" Dameron Regulatory Program Technician Washington Regulatory Field Office US Army Corps of Engineers Wilmington District Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. Terracon provides environmental, facilities, geotechnical, and materials consulting engineering services delivered with responsiveness, resourcefulness, and reliability. Private and confidential as detailed here (www.terracon.com/disclaimer). If you cannot access the hyperlink, please e-mail sender. 14