HomeMy WebLinkAboutSW6211101_Annual Certificate of Completion (2024)_20240307 CERTIFICATE OF COMPLETION
Post-Construction Stormwater Annual Permit Certification
This certifies that Elvis Faircloth has completed the Annual Permit Certification for Post-Construction Stormwater Permit SW6211101, Mason Ridge
Subdivision, located in Spring Lake, Harnett County,on March 7,2024 in accordance with G.S. 143-214.7(b4). Please keep a copy of this certificate for
your records.The electronic record will be stored in the Department of Environmental Quality's digital repository permit file.
The Annual Permit Certification must be completed each year on or before the day of permit issuance, March 21. Failure to do so is a violation of your
permitting conditions and is subject to enforcement action per G.S. 143-215.6.
Jim Farkas
State Stormwater Engineer
Division of Energy, Mineral,and Land Resources