HomeMy WebLinkAboutNCC240646_NOI Application_20240307 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 3/1/2024 4:52:01 PM(NCG01 NOI Submission)
Approve by Kieu Tran 3/5/2024 7:41:01 AM(Review-NOI 185931 Four Oaks Phase B)
• The task was assigned to DEMLR NCG01 NOI Review Team.The due date is: March 6,2024 5:00 PM.
The priority is: High 3/1/2024 4:52:10 PM
• The task was assigned to Kieu Tran by round robin distribution 3/1/2024 4:52:10 PM
Submit by Tev.Holloman 3/7/2024 2:36:58 PM(Payment Verification for NCC240646)
•Joshua Lanaville
• The task was assigned to DEMLR NCG01 Payment Team.The due date is:April 16,2024 5:00 PM.The
priority is: High 3/5/2024 7:41:16 AM
• Tev.Holloman assigned the task to Tev.Holloman 3/7/2024 2:35:21 PM
applicationConstruction Stormwater: Notice of Intent (NOI)
National Pollutant Discharge Elimination System(NPDES)
General Permit 1 0000:STORMWATER DISCHARGES associated with construction activities
NORTH CAROUNA
Environmental Quality
A. Project Information
Part A.
Project Location and Waterbody Information
...................................................................................................................................................................................................................................................................................................................................................................................................
Are you submitting an NOI that was rejected before?
No
Yes
1a. Project Name*
Four Oaks Phase B
1b.Specific Lot Numbers
This field may be used to list specifc lot numbers.
1c.Parcel ID Number(s)(PIN)
List all PINs associated with this project.
NCDOT R/W, 168213-12-5713, 168213-13-1508, 168213-12-3834, 168213-12-2846, 168213-12-3880
2.County*
Johnston
3.Highway or Street Address*
US 301,Thunder Rd(SR 1183), Boyette Rd(SR 1182)
Street name only is acceptable if no address number assigned yet
4.City or Township*
Four Oaks
5.State* NC
6.Zip Code* 27524
7. Latitude* Enter the latitude in decimal degrees
35.4638
8. Longitude* Enter the longitude in decimal degrees(MUST be negative)
-78.3888
If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North
Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 03/04/2024
Estimated Construction Project Start Date
10.Date to End* 04/30/2024
Estimated Construction Project End Date
11.SIC(Primary)*
Other(9999)
Standard Industrial Classification for Development
12.Acres to be 4.30
disturbed* (including off-site borrow and waste areas)
13.Total site area 4.30
(acres)*
14. Post-construction 0.00
impervious area (Estimated)
(acres)*
Project Tracking ID NCC-JOHNS-2024-Four Oaks Phase B
Assigned automatically(not used)
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter
only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter
up to 3 waterbodies if needed.
15a.Receiving Waterbody*
Black Creek
Name of waterbody into which stormwater runoff will discharge
15b.Waterbody Index No.*
27-45-(12)
NC Waterbody Index Number
Stormwater discharges will flow to additional waters
No
Yes
16a.Is this project subject to the NC Sediment Pollution Control Act?*
Yes
No, not subject to NC SPCA
17. Is this project funded with ARPA(American Rescue Plan Act)grant funds?
No
Yes
This question was added to the eNOI on 1/26/2023 and will not be answered in applications submitted prior to that date.
B. Permittee Information
Part B.
Permittee Information-Legally Responsible Entity and Individual
......................................................................................................................................................................
Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form must be the same person as listed in THIS SECTION,or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity,such as
a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV,Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B,
Item(6)of that permit.
1. Permittee*
Legally Responsible Entity
Piedmont Natural Gas
If permittee is an individual,enter first and last name in this field.Otherwise,enter organization/business name.
Note: If the permittee is a business,the business must be registered with the INC Secretary of State.You can verify the
registration here. Permittee must be the same entity that is responsible for the land-disturbing activity as listed on the NC
SPCA Financial Responsibility/Ownership(FRO)Form.
2. First Name* Joshua
If Corporation,enter Registered Agent First Name
3. Last Name* Lanaville
If Corporation,enter Registered Agent Last Name
3b.Title Sr. Distribution Project Specialist
4. Permitee E-mail Address*
Joshua.LanaviIle@duke-energy.com
5. Permittee Telephone No.*
919-223-4279
6. Permittee Mailing Address*
Street Address
250 Five Points Rd.
Address Line 2
City State/Province/Region
Dudley INC
Postal/Zip Code Country
28333 Wayne
Check box if the street address the same as mailing address
Yes
7. Permittee Street Address*
Street Address
250 Five Points Rd.
Address Line 2
City State/Province/Region
Dudley NC
Postal/Zip Code Country
28333 Wayne
B.Type of Ownership*
Ownership is only individual if an individual is named in B.1.above.
Non-Government
C. Site Contact Information
Part C.
Project Site Contact Information
................................................................................................................................................................................................................................................................................................................................................................................................
1. Primary Site Contact-First Name*
Jesus(Chuy)
2. Primary Site Contact-Last Name*
Guerra
3.Title
Project Coordinator
4.Site Contact E-mail Address*
chuy.ventura@parkerstockstill.com
5.Site Contact Telephone No.*
2522994524
6.Organization Name
Parker-Stockstill Construction
7.Site Contact Mailing Address*
Street Address
PO Box 249
Address Line 2
6939 E Langley Rd
City State/Province/Region
Elm City NC
Postal/Zip Code Country
27822 United States
8.Consultant Name
(Optional)
Michael Young
First and Last name
9.Consultant E-mail
mayoung@trccompanies.com
This person will be copied on all correspondence.
10.Consultant Telephone No.
13463552016
11. Billing E-mail
(For Annual Fee correspondence)
Joshua.LanaviIle@duke-energy.com
Default is legally responsible person e-mail
12. Billing Telephone
(For Annual Fee correspondence)
919-223-4279
Default is legally responsible person telephone
D. E&SC Plan
Part D.
Erosion&Sediment Control(E&SC)Plan Approval Information
......................................................................................................................................................................
1. Date E&SC Plan 02/29/2024
Approved*
2. E&SC Plan Project JOHNS-2024-0110
Number/ID* Assigned by agency or local program
3. E&SC Plan State DEQ Office
Approved by* Local Program
4.State DEQ Office* Raleigh (RRO)
Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project(for linear projects,can
include the beginning point and end point coordinates in the"Notes"box below).
5. E&SC Plan Letter of Approval-Thursday, February 29,2024 222
Approval letter or PM.pdf 302.71 KB
Grading Permit
Must be PDF format
6.Signed FRO Financial Responsibility/Ownership Form
Application Report-Thursday, February 29,2024
113.26 KB
222 PM.pdf
Must be PDF format
7.Site Location Map Must be PDF format(limit 20 MB)
Four Oaks-Phase-B-Site Location.pdf 2.63MB
Please do not upload entire set of E&SC plans.
8. Notes(Optional) Provide any additional information that might help the reviewer better understand how uploaded documents
support the application.Include additional waterbodies if necessary.
9. NOI Certification Signed eNOI Cerification Form.pdf 43.57KB
Form Must be PDF format
This is an Express No
Review Project* Yes
E. Certification
North Carolina General Statute 143-215.613(1)provides that:
Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document
filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000).
Under penalty of law, I certify that:
* I am the person responsible for the construction activities of this project,for satisfying
the requirements of this permit,and for any civil or criminal penalties incurred due to
violations of this permit.
* The information submitted in this NOI is,to the best of my knowledge and belief,true,
accurate,and complete based on my inquiry of the person or persons who manage the
system,or those persons directly responsible for gathering the information.
* I will abide by all conditions of the NCG010000 General Permit and the approved
Erosion and Sediment Control Plan.
* I hereby request coverage under the NCG010000 General Permit and understand that
coverage under this permit will constitute the permit requirements for the discharge(s)
and is enforceable in the same manner as an individual permit.
Specify if you are:* The Legally Responsible Person named on this Notice of Intent
Authorized Responsible Person'(signing on behalf of Legally Responsible Person
named in Part B)
Important:The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible
person within the same organization as the Permittee.
'An authorized individual is a responsible corporate officer who owns or operates the construction activity,such as a
president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B,
Item(6)of that permit.
Signature
0;�iva le"41 111-
Type Name* Joshua Lanaville
Title Sr. Distribution Project Specialist
Organization Legally Responsible Entity
Piedmont Natural Gas
Date* 03/01/2024
F. Tracking and COC Info
NOI Tracking No. 185931
NC Reference No. NCG01-2024-0646
Indicates NCG01 or NCG25.Uses NOI number until approved,then uses NUMBER incremented by SIP(passed
from workflow if eNOI approved)
Certificate of NCC240646
Coverage(COC) No.* Uses NOI number until approved,then uses NUMBER incremented by SIP(formatted and passed from workflow if
eNOI approved)
Initial Invoice No. NCC240646-2024
Invoice Due Date 4/4/2024
Initial Fee $ 120.00
Fee increased to$120,effective October 3,2023
Invoice Status OPEN