Loading...
HomeMy WebLinkAboutSW6231103_O&M Agreement/Plan_20240306 Operation & Maintenance Agreement Project Name: Godwin Subdivision Project Location: McLean Street, Godwin, NC Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s)on this project include (check all that apply&corresponding O&M sheets will be added automatically) Infiltration Basin Quantity: Location(s): Infiltration Trench Quantity: Location(s): Bioretention Cell Quantity: Location(s): Wet Pond Quantity: 1 Location(s): NW Corner of Property i Stormwater Wetland Quantity: Location(s): Permeable Pavement Quantity: Location(s): Sand Filter Quantity: Location(s): Rainwater Harvesting Quantity: Location(s): Green Roof Quantity: Location(s): Level Spreader- Filter Strip Quantity: Location(s): Proprietary System Quantity: Location(s): Treatment Swale Quantity: Location(s): Dry Pond Quantity: Location(s): Disconnected Impervious Surface Present: No Location(s): User Defined SCM Present: No Location(s):I - - Low Density Present: No Type: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Susan Tart Property, LLC/Zach Angle Title&Organization: Manager Street address: 126 N. Ennis St. City, state, zip: Fuquay-Varina, NC 27526 Phone number(s): 909-602-2351 Email: zach.angle@gmail.com Signature: Date: /�/�� I, 1cIT'rF=, Ll; -Lo , a Notary Public for the State of /U C ril - County of k ht' , do hereby certify that --(L7cl i..L{ I-M J/-ff personally appeared before me this ,/ St day of ///)/l6�/ h •)();V J and acknowledge the due execution of the Operations and Maintenance Agreement Witness my hand and official seal, ly (4se l 1 ,�-- - - - - . MARIA WISDOM NOTARY PUBLIC HARNETT COUNTY,NC My Commission Expires March 14,2026 Seal My commission expires 7 )L( I-X-IZC STORM-EZ 2/29/2024 Version 1.5 O&M Agreement Page 1 of 1 Wet Pond Maintenance Requirements Important operation and maintenance proce Immediately after the wet detention basin is established, the plants on the - vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet pond should be fertilized after the initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet pond. If the pond must be drained for an emergency or to perform maintenance, the - flushing of sediment through the emergency drain will be minimized as much as At least once annually, a dam safety expert will inspect the embankment. Any - problems that are found will be repaired immediately. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into HILCI LIIC WCl pUIIU IS CJLdLJIIJIICU, IL Will LJC IIIJpCL,LCU 4UdILCIIy d11U W RUM L'+ IIVUIS dILCI CV ety storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon ra ril ICCt ion activities shall be performed as follows. Any problems that are found shall be repaired immel SCM element: Potential problem: How to remediate the problem: The entire wet pond IYdc^I�+CL,II�I� Remove the trash/debris. Areas of bare soil Regrade the soil if necessary to remove the gully, The perimeter of the and/or erosive gullies plant ground cover and water until it is established. wet pond have formed. Provide lime and a one-time fertilizer application. The inlet pipe is clogged (if Unclog the pipe. Dispose of the sediment off-site. I IIC IIIICL pipe Is cracked or otherwise The inlet device damaged (if Repair or replace the pipe. annlirahlil Erosion is occurring Regrade the swale if necessary and provide erosion in the swale (if control devices such as reinforced turf matting or applicable). riprap to avoid future problems with erosion. Sediment has Search for the source of the sediment and remedy accumulated to a the problem if possible. Remove the sediment and depth greater than dispose of it in a location where it will not cause the original design impacts to streams or the SCM. The forebay depth for sediment Provide additional erosion protection such as Erosion has occurred. reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If Weeds are present. pesticide is used, wipe it on the plants rather than Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Sediment has Search for the source of the sediment and remedy accumulated to a the problem if possible. Remove the sediment and depth greater than dispose of it in a location where it will not cause the original design impacts to streams or the SCM. The main treatment sediment storage area Algal growth covers Consult a professional to remove and control the over 50% of the algal growth. Cattails, phragmites or other invasive Remove the plants by wiping them with pesticide plants cover 50% of (do not spray). the basin surface. Best professional practices show that pruning is needed to Prune according to best professional practices. maintain optimal plant health. The vegetated shelf Determine the source of the problem: soils, Plants are dead, hydrology, disease, etc. Remedy the problem and diseased or dying. replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than Shrubs have started to grow on the Remove shrubs immediately. embankment. Evidence of muskrat Consult a professional to remove muskrats or or beaver activity is beavers and repair any holes or erosion. The embankment A tree has started to grow on the Consult a dam safety specialist to remove the tree. An annual inspection by an appropriate professional shows Make all needed repairs immediately. that the embankment needs repair. Clo in has Clean out the outlet device and dispose of any gg g sediment in a location where it will not cause occurred. The outlet device impacts to streams or the SCM. The outlet device is Repair or replace the outlet device. damaged. Weeds or volunteer Remove the weeds or trees. trees are growing on Floating wetland I II d111 FIUI UdLIC is island (if applicable) damaged, Restore the anchor cable to its design state. disconnected or miccinrr Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: CIU IVII UI UMW Siyilb of damage have Repair the damage and improve the flow occurred at the dissipation structure. r i'flat The receiving water Discharges from the wet pond are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receiving water. Wet Detention Pond Design Summary Net Pond Dian W ET POND ID FOREBAY MAIN POND 1 Permanent Pool El. 138 Permanent Pool El. 138 Temporary Pool El: 139.3 Temporary Pool El: 139.3 Pretreatment No Clean Out Depth: 4.5 Clean Out Depth: 5.5 other than Sediment Removal E 133.5 Sediment Removal E 132.5 Has Veg.Filter? No Bottom Elevation: 132.5 Bottom Elevation: 131.5 ATTACH ADDITIONAL SHEETS IF NECESSARY