HomeMy WebLinkAboutNCC240664_ESC Approval Submitted_20240307 a ,.
ROY COOPER i _ -
Governor Vi i
ELIZABETH S.BISER ,7,..76 ,,
Secretary Fes`Q `"' .
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
Interim Director Environmental Quality
03-04-2024
LETTER OF APPROVAL
Cherry Solar, LLC
595 Summer Street
Stamford, CT 06901
RE: Project Name: Cherry Solar Phase C7
Project ID: NORTH-2024-0105
Acres Approved: 277.74
County: Northampton
City: Gaston
Address: Oak Grove Church Road
River Basin: Roanoke
Stream Classification: C: Aquatic Life, Secondary Contact Recreation, Fresh water
Submitted By: Jacob Dooley
Plan Type: New Plan
Dear Cherry Solar, LLC,
This office has reviewed the subject erosion and sedimentation control plan. We hereby issue this
Letter of Approval. Any modifications required for approval are listed in the body of the email that
accompanied this attached letter. The enclosed Certificate of Approval must be posted at the job
site. This plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities not explicitly exempt are required to complete
and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC)
under the NCG010000 Construction General Permit. After the form is reviewed and found to be
complete,you will receive a link with payment instructions for the annual permit fee. After the fee
is processed,you will receive the COC. As the Financially Responsible Party shown on the FRO form
submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01.
D_ vE Q Quality I Division ,512 NorthNorthCarolina SalisburyDepartment Street 11612of MailEnvironmental Service Center I Raleigh,Northof CarolinaEnergyMineral 27699and-1Lan612d Resources
NOii CAHCiI N.
Department or Environmental Quality 919.707.9200
Letter of Approval
Cherry Solar, LLC
03-04-2024
Page 2 of 2
Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central
office. If the owner/operator of this project changes in the future, the new responsible party must
obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection
of existing natural resources and adjoining properties. If, following the commencement of this
project, the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),
this office may require revisions to the plan and implementation of the revisions to ensure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land-disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form and on the plan, which you provided. You are requested to file an
amended form if there is any change in the information included on the form.
Your cooperation is appreciated.
Sincerely,
Land Quality Section