HomeMy WebLinkAbout20070666 Ver 2_401 Application_20071107C ENGINEERING November 9, 2007 PAID Ms. Cyndi Karoly, Supervisor NC Department of Environment and Natural Resources 401 Oversight/Express Review Permitting Unit 2321 Crabtree Boulevard, Suite 250 Raleigh, NC 27604 RE: Oak Forest Road Extension Ut to Perry Creek [030402, 27-25-(2), C, NSW] Dear Ms. Karoly: t77- o~4cn Y2 Nav zoo? ~ENR - INAT~R CdUA1.17Y Lv~rtarr~ ~ta~ sr;~.-~w~t~ s~wcw a ~~~ u ~~2007 ~~~~~ - WA7~~ CKIALITY tNE1 tltNik°~ ~~~ jT~!?!~ANAT~ ~ Enclosed is one (1) full-sized revised set of plans and seven (7) sets of the permit package for Broughton Properties Subdivision/Oak Forest Road Extension, for your review based on your review comments dated Apri127, 2007. The responses to your comments are as follows: Comment 1) Show all stream impacts including all fill slopes, dissipators, and bank stabilization on the site plan. Response: Plans have been revised to show all stream impacts due to the construction of Oak Forest Road Extension and the proposed subdivision. The wetlands delineation has been included on the plan as well as approximate locations of proposed BMPs. The wetland determination letter dated August 4, 2007 has been included in the package for your reference. Comment 2) Indicate all buffer impacts on the site plan. Response: All buffer impacts have been labeled as Zone 1 and Zone 2. Comment 3) Indicate proposed lot layout as overlays on the site plan. Response: Building envelopes have been provided on the plan to indicate areas of potential development (grading). Comment 4) Locate all isolated ornon-isolated wetlands, streams and other waters of the State as overlays on the site plan, and provide intermittent/perennial stream determinations by DWQ showing all streams on the property. Response: Wetlands based on the wetlands determination letter dated August 4, 2007 have been shown on the site plan as requested. Riparian Streams as concurred by DWQ have also been shown on plan along with buffer limits. ^ PO Box 30128, Raleigh, NC 27622 • TES 919.788.0224 Fax 919.788.0232 Comment 5) Provide cross section details showing the provisions for aquatic life passage. Response: Across section at the entrance to the culvert has been provided showing that the pipe will be buried approximately 20% (about 12") to provide for aquatic life passage. Comment 6) Locate any planned sewer lines on the site plan. Response: Proposed sanitary sewer locations have been located on the site plan. Comment 7)Provide the location of any proposed stormwater management practices as required by GC3631. Response: Approximate BMP locations have been shown on the site plan as requested. Comment 8) Please provide detail for the stormwater management practices as required by GC3631. Response: It was determined in meeting with Mr. John Dorney of your office on July 20, 2007 that the approximate location of the BMP would be the only requirement at this time. Please see attached memo dated September 17, 2007. Stormwater management plans will be submitted to City of Raleigh as a required component of site plan approval for each lot. Comment 9) Please specify the percent of project imperviousness area based on the estimated built-out conditions. Response: Please see memo mentioned above. Comment 10) Please indicate the diffuse flow provision measures on the site plan. Response: The diffuse flow will be handled during the site plan submittal process. Comment 11)Provide the US Army Corps of Engineers Nationwide permit No. Response: The US Army Corps of Engineers determined that there was no wetlands determination at the proposed Oak Forest Road Extension crossing, see attached Wetlands Determination Letter from the US Corps of Engineers dated August 4, 2007. All determined wetlands on this project fall within the limits of Zone 1 & Zone 2 stream buffers which are proposed to be left undisturbed. Should you have any questions or need any additional information, please do not hesitate to contact me or Mary Jo Lee at 788-0224. Sinc y, Tom He r, PE Cc: Ed Bailey Ma's • ? u 20U1r~~~ 30FPJ~ COf~4P~ERr 1. AL ASSOCI A?E No • 4013 ~ • ? Michael F. Easley, Governor ~~}~ ¢{,, Wigiam G. Ross dr., ^~ecretary U7 ~ North C.arnlina Department of Envirgnmcnt and Natural Resources ~ ~ p ..~ Alan W. Klict~ek, 1'.F,. ~ircctor Division of Water ~uelity April 27, 2Q07 T)WQ Project # 0~-0666 Wake County CERTIFIED MAIL: ItETU)'tN RECEIPT REQU~xEtl ~~ ~ ~ ~ '~~ , t ,• 9r's.i ;., ~ $roughton Properties ~` ~ .v_ P.O. Box~64 ~~~` Raleigh, NC 272602 -~; ., v ;} Z J U Sub~ect Pro a Dal4 Forest Rtrad Extension ~'` ' ~~~ tivHi ~r3 c~u,~un~ a p rty: ,~-ru~~03 :~~?D S7(N??A?^!.~ i ER 9RAh1ur~ tJt to Ferry Creek [03040, 27-25-(2}, C, NSW] RETiJRN O1F Adi')PLICATI+tiN Dear Sir or hRadann~ fJn April l 3, 20(16, tl>le Division of Water Quality (D'WQ} received your applicatiota dated April 5, 20fl7 to impact I45 tinear feet of stream and U.UO square feet of Zone ] Neuse River basin protected riparian buffer and O.OQ square feet of Zone 2 T~ieuse River basin protected riparian buffer to construct the proposed road through the site which is to be developed as a residential subdivision. Your application was unacceptable due to the following items: You dial not: ]. Show all stream impacts including all fill slopes, dissipaters, and bank stabilizatioA on the site plan. Z. Indicate all buffer impacts on the site plan. 3. Indicate proposed tot layout as overlays on the site plan. 4. Locate all isolated or non-isolated wetlands, streams and other waters of the State as overlays on the site plan, and provide interzz>ittent(perennial stream deterntinatit7zts by I~WQ showing all streams o~n tkte property. 5. Provide cross section details showing the provisions foz aquatic life passage. 6. Locate any planned sewer lines on the site plan. 7. Provide the Location of any proposed stormwater management practices as required by GC3631. 8. Please provide detail for the stormwater tz>,anagement practices as required isy GC3fi~ I. q. Please specify the percent of project imperviousness area based an the estimated built-out conditions. 10. Please indicate the diffuse flow provision measures on the site plan. c. l 1. I~zovide the U.S. Army Corps of Etagineezs Nationwide permit Na. ~ i~ ]2. Complete Sectioxas VII, X, and XTV. Pox these reasons your permit application is hereby considered wlth,dzawn. Should you choose to reapply, we strongly encourage you to arrange apre-application with DWQ staff so we rxAay assist you and help you to submit a An Equal Opporlvnl#y/A~r[rtativc Action Employer- 50%Rccycled/i0S'° Post Consumer Paper #~~i• 1. 2007 1~30PM COMMERCIAL AOSOCI~TES h1~~4073 P• 3 13raughton Properties Rage 2 of 2 April 27, 2047 cu~plete application.. Additionally, once you .Dave redesigned y4ux project to address the probleams and inadequacies with your applieatio~. as it was subrn,itted, you will need to reapply for DWQ approval. This includes submitting a complete application package with the appropriate. Please be aware that you have no autlzozization under Section 401 of the Clear Water Act for this activity ar~d any work doge within waters of the state would be a violaticxt cf North Carolina General tatutes and ,Adnninistrative Code. Please cal! Ms. Cyndl ICaroly or Mr. Ian 1VIaIvlillan at 9I9-733-1'186 if you a any questions or concerns. Sincerely, .~ Cyndi ICaroly, Supervisor 401 OversightlExpress Review Perrnitting Ut-it ce: Lauren, Cobb, pWQ Raleigh R,eglona! Office USACE Raleigh Regulatory k~leld office File Copy Central Files CH EngineeringjMaha Chaznbliss, P.C}. fox 3012$, Raleigh, ~1C 27622 1Felename: 07pG66(lakForest~oAdEse(VVakc}~.eturoed AppEieatioa ENGINEERING ~~ D `1 - o ~ e ~ v' 2 November 9, 2007 Ms. Cyndi Karoly, Supervisor NC Department of Environment and Natural Resources 401 Oversight/Express Review Permitting Unit ~ ~ . ~_ ~.~ ~ ~~~~ 2321 Crabtree Boulevard, Suite 250 ~ ~~ ~~ Raleigh, NC 27604 pi ~ ~ ~ Q Q 1 RE: Oak Forest Road Extension r~~~K - Y~~~ `=~ "~~~~T~` 1N~flAldl3 A~'~D 57~T2!yM!~li1:R BRANCH Ut to Perry Creek [030402, 27-25-(2), C, NSW] Dear Ms. Karoly: Enclosed is one (1) full-sized revised set of plans and seven (7) sets of the permit package for Broughton Properties Subdivision/Oak Forest Road Extension, for your review based on your review comments dated Apri127, 2007. The responses to your comments are as follows: Comment 1) Show all stream impacts including all fill slopes, dissipators, and bank stabilization on the site plan. Response: Plans have been revised to show all stream impacts due to the construction of Oak Forest Road Extension and the proposed subdivision. The wetlands delineation has been included on the plan as well as approximate locations of proposed BMPs. The wetland determination letter dated August 4, 2007 has been included in the package for your reference. Comment 2) Indicate all buffer impacts on the site plan. Response: All buffer impacts have been labeled as Zone 1 and Zone 2. Comment 3) Indicate proposed lot layout as overlays on the site plan. Response: Building envelopes have been provided on the plan to indicate areas of potential development (grading). Comment 4) Locate all isolated or non-isolated wetlands, streams and other waters of the State as overlays on the site plan, and provide intermittent/perennial stream determinations by DWQ showing all streams on the property. Response: Wetlands based on the wetlands determination letter dated August 4, 2007 have been shown on the site plan as requested. Riparian Streams as concurred by DWQ have also been shown on plan along with buffer limits. ^ PO Box 30128, Raleigh, NC 27622 • TES 919.788.0224 Fax 919.788.0232 ~~ Comment 5) Provide cross section details showing the provisions for aquatic life passage. Response: Across section at the entrance to the culvert has been provided showing that the pipe will be buried approximately 20°Io (about 12") to provide for aquatic life passage. Comment 6) Locate any planned sewer lines on the site plan. Response: Proposed sanitary sewer locations have been located on the site plan. Comment 7)Provide the location of any proposed stormwater management practices as required by GC3631. Response: Approximate BMP locations have been shown on the site plan as requested. Comment 8) Please provide detail for the stormwater management practices as required by GC3631. Response: It was determined in meeting with Mr. John Dorney of your office on July 20, 2007 that the approximate location of the BMP would be the only requirement at this time. Please see attached memo dated September 17, 2007. Stormwater management plans will be submitted to City of Raleigh as a required component of site plan approval for each lot. Comment 9) Please specify the percent of project imperviousness area based on the estimated built-out conditions. Response: Please see memo mentioned above. Comment 10) Please indicate the diffuse flow provision measures on the site plan. Response: The diffuse flow will be handled during the site plan submittal process. Comment 11)Provide the US Army Corps of Engineers Nationwide permit No. Response: The US Army Corps of Engineers determined that there was no wetlands determination at the proposed Oak Forest Road Extension crossing, see attached Wetlands Determination Letter from the US Corps of Engineers dated August 4, 2007. All determined wetlands on this project fall within the limits of Zone 1 & Zone 2 stream buffers which are proposed to be left undisturbed. Should you have any questions or need any additional information, please do not hesitate to contact me or Mary Jo Lee at 788-0224. Sinc y, Tom He r, PE Cc: Ed Bailey a~ f Office Use Only: Form Version March OS USACE Action ID No. DWQ No. ~ ~ ~ ~ ~ ~ Y 2 (If any particular item is not applicable to this project, please enter "loot applicable" or °i~iti .~ I. Processing 1. Check all of the approval(s) requested for this project: ^ Section 404 Permit ® Riparian or Watershed Buffer Rules ^ Section 10 Permit ^ Isolated Wetland Permit from DWQ 401 Water Quality Certification ^ Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: ~! a n(ts 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ^ 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ^ 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the. project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), checl~,e~ ~ rf'i II. Applicant Information ~!. JV ~ 2007 1. Owner/Applicant Information \\ ~~~~ , YVAT~tt ~upu~~ Name: T3 (ZotJ ~ ~'~N ~/Lo P En_T7 ~ S •. ~ -~ iB~ ~+'~a sTOR!iR°J~~t 9RANC~ Mailing Address: ~ 0 6~k ~ Co Telephone Number: `~ c Q - k l ~ 9 9 SU Fax Number: (9 - ~ l 3 - ~~ E-mail Address: b ~ ~ ~ e ~ C~ r e c.~ e ~< <e. - C o • C~wi 2. AgentlConsultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: C N- C n ~ n e c ~' ~'~ r1~4- C~ 8L~ S S Company Affiliation: Cd ~ s v ~~ ~.1T c (=,~ G ~ rJ EL ~i ~ ~ ~ Mailing Address: Pa Qa~C 3 b l ~~ ~ A- ~. r c G ~ , til c a-l c~ ~- a Telephone Number: q t ~ ~ ~ -~ ~ a- Fax Number: g/ ~t -~ fi'b' - d 2 3 ~= E-mail Address: m eh a ~, b (~ s a (~ C,h - e n ti r- , e o ~-r. Page 5 of 12 ,~ e III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing properly boundaries -and_ de-v-elopment_plans_in _relatian to_surrounding_prop~rties___-Borth-.the- vici-pity -map- and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: ~~~uG'-1-~t~l ~~d~L%nnt=~~d/~~c ~~t~~ `~~L, ~kT: 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): f ? a Co le ~ I ~ ~ I ~ (7 ~ ~ S ~S 3 S ~- 4. Location , ' / Colmty: IN J~- t~~ Nearest Town: ~A ~ ~ (G if Subdivision name (include phase/lot number): B e~~ G ~-rar~ P ~o P~xr t ~' Pi.~.f-s rz 1 Directions to site (include road numbers/names, landmarks, etc.): N~ erZa- o N Cg P ~TA~. Dc.~~ ~A-s~ ~n~ SJMa~re. l3C.,V7. r~~dl~a~r'y /s iA/ ~duTflwcJT Q V ~~ L.A-NT' U F S J ~h N ~-~ r, `V ?j >r ; 7Q I A-~1 C~ L ~ Tt1W ~1 B L. V D ~ N T~ 2.' S ~ cTZ~N r S i~2~/~tM C Ros s ~e~1c~ oc cuQ.S /}-~ PR-a Pds~ a,4 K Fo its ~ ~ E~' 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): -3 S~ SI ~ 3 ~ " °N ~ $'° ~ ~~ 30 ~~ °W 6. Property size (acres): c~ ~ • ~ l° 5 ~ ~- 7. Name of nearest receiving body of water: (~~ 2 K~J C2~ L 1L 8. River Basin: ~ ~ U z ~ ~ ~ V E ~- (Note -this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/adrnin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: ~i ~~~ ~.~ ?o ~+.~ -.~ c,~N~2 ~s H-~PP~ N~ n~1+L.~, -~ '. }.f'E l~.l i~ 2TN- C /4S ~ /W 1 ~..c.. Q R~~ ~ M t~ l~ C~ 5 ~ r--~1~ ~. W r TT'+ T i2f4cl~.. ~' c~ac.c- ~~ zLli 3 ~ TtfE S~J ,, l~ J ^i~ E~IZ~ P E~ W oa J `A--~J~s `lam Page 6 of 12 10. Describe the overall project in detail, including the type of equipment to be used: 5 ~ ~ ,a~rt1 C ~ • S s ~ ni V F~ ~ 0 ~4 K ~a 2~cZ i ~ d ~5 F ~ N 5 c y~J . ~~xPM~,~ ~v 6E~z~v : a~~ ~~ _. Rya 6/~i-~~r2s. ~svck~~ S P /L~"~~ t 2. ~ CJ ,n. rj f} ~7?1.,2J G ~~ ~ il-c.. ~L d /a-~ W ~-~--- ~ v E P M ~N'' 11. Explain. the_purpose of the. proposed work: _ Cs~ N ~ ~-~ ~T R~ ~> w air ~-,c ?~~s = a a -7n SLa~~ Mt1c~ t1s~ SJS~~ c~~s.o.a IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules./ a n/~ V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. n~anl~ VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: / n! s ~ ~- ~-- 7 Cp LF aF ~- << ~ ~ A M ~-~-t.2. en^ P w ~~ t-i-~-~+~ w ~-~~ S ~ 2 ? " T1~ ~ c!c C~Ass ~ QtQR/IP o~'r'zCT PR~"-~c-rc~~ tFs SHo,•J-~ ~a Page 7 of 12 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact --Site-Number (indicate on map) Type- of Impact Type of Wetland (egg:;-forested; r-Harsh, herbaceous, bog, etc.) Located within 100-year --_ ----- Floodplain ( es/no) Distance to Nearest ------ Stream (linear feet) Area of Impact ------- (acres) Total Wetland Impact (acres) 3. List the total acreage (estimated) of all existing wetlands on the property- ~ Z 2 S ~ F = O.1 ~ ~i~ 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage. multiply length X width- then divide by 43.560. Stream Impact Number (indicate on ma Stream Name Type of Impact Perennial or Intermittent? Average Stream Width Before Im act Impact Length (linear feet) Area of Impact (acres I ua NAMe~Ta<i c,,~.JFrc, ~ 2 2 ~~' 13 x.58 0,07 P~-YL~ CR . Total Stream Impact (by length and acreage) / 3 (e , $~ ~ O `~ 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill- excavation- dred~ine. flooding. drainage. bulkheads. etc. Open Water Impact Site Number (indicate on map) Name of Waterbody (if applicable). Type of Impact Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) Area of Impact (acres) Total Open Water Impact (acres) Page 8 of 12 6. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): , p 7 Wetland Impact (acres): Open Water Impact (acres): -T-otal-Impae~-to-W-aters-of the I~ S. (aeresj - - - D ~ Total Stream Impact (linear feet): / 3 ~. S'8 7. Isolated Waters Do any isolated waters exist on the property? [1~Yes ^ No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact .(acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts .should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ^ uplands ^ stream ^ wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): .Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Current land use in the vicinity of the pond: Size of watershed draining to pond: Expected pond,surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. (~ e c ~ ~. of ~ ~ ~« ~i., VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. Page 9 of 12 .~ USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic-r-esour-ce -w-ilf-be- consider-ed-in- determining-acceptabi.Iit-y_.o_f__appropriate- .and__practicahle_ mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for, processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as ,incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http: //h2o. enr.state.nc.us/ncwetlands/strmaide. html. Provide a brief description of the, proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more l1space is needed. 1 // / -~ 3 f Q n _r~ c ~ a ~t d.. a /- rr, cT~~ ~~Z~1-- ~ i 1 6~ ,r e ~~ rQ c~. L!Ll~A.e T.~i4~1'sOD.c Ti~Tld s/ F~lG ! T'? 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres):- Amount of Non-riparian wetland mitigation requested (acres Amount of Coastal wetland mitigation requested (acres):- Page 10 of 12 IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federaUstate/local) funds or the use of public (federaUstate) land? Yes ^ No 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ^ No (,~ 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA fmal approval letter. Yes ^ No ^ ~/~ X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman' Rules and Water Supply Buffer Requirements), or other (please identify tatlySE ~i • 1~+I~. t3oF.)? Yes ~ No ^ 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. * I Impact I I Required Zone ~~~..~~e c e.~ Multiplier 1 ~' ~{ $~e , p g 3 (2 for Catawba) a s S°o .a7 2 ~a97. ~a- l.s ~ ~F4~.1 3 Total 1 17 $' 3 . S~ a, ~ c7 ~,'{ ~ * Zone I extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additiona120 feet from the edge of Zone I. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration /Enhancement, or Payment into the Riparian Buffer Restoration Fund). .Please attach all .appropriate information as identified _ __ within 15A NCAC 2B .0242 or .0244, or .0260. ~/ ~ ~ ~,c r.+ v c. ~Tr uE ~ IM PA~c~S Page 11 of 12 XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss Stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface .exceeds 20%, -please provide..-calculations demonstrating total proposed impervious level. Ex. ~,~-L w e.r v ~ Sys z o a c re s . Pte. ~Q ~rype.r~-ecss = f, ~? ac T~~ l A~-rccac. = ~`~ 04 ~c °% - .oervc~~s c 5.3~-`~~ ~~,{l GtPCs.~- v''r 5 dv Y vw- v.l .~.31t,r 1^v n ~'~ ~ S ~ C S S ~ r. 1 O [ a `~-~e re ~vr C $ {-o r r.•. w a,'r~e,r' v h c.'F F CcSYydro(3 are r.o~" ~'pb.+~r'v1 , Eatl., (af owvier 15 respati.sc~~,c, ~ ,pro~cdl c~'y~ XII. Sewage Disposal (required by DWQ) ~ e ~-~+`-^- ~~ ~ M ~' de s~9 -+ . O Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ^ No Is this anafter-the-fact permit application? Yes ^ No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ^ No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: ALC- {7o^t'ENT~ ILL ~ ~1/~Lp P ~+ ~ NT /•~-c.v ~(4 T[f-G P RJ PJ T E1~ lecl p1) W ~a~/ ~ I~EF~C?-~~ ~ N il-~ ~ s P l-A n1 /1N~ 'fN' ~E ~A ~6 rJ o 141 c ~ i o nl Jat. ~ dw t~ s ~'7Z(.-~ M 1 ~-'~ f /~-'r 5 I~fJTI ~ ~ P f!'" ~'F~~~ . XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). =~~0 Appli~nt/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 _ __ ~®.~ :~ ENGlNEER{NG C~~Cl~L~~'fOt~ SF~~E~ CLIENT PR~~.,JECT Ne. SUBJECT l~P ~~ ~<~t Wit'-' ~~ ~~~E~ ~.`K~L~ /"dam .C,}(1Q0 Dt~L`~-~l}{~{~FnjG' ~'t?~~ ?Au Prepared By _ Bate he~~iewed By _ Bete ~' c €?~ ~~ C,a~r-~o.~ '~-.~r,a EGG .A722. ~: (~ ~ ~ k' .4 ~- ~zs- 1.3s x ~S = /v r. a~ c t,cdr,~G ~ZS ~./off, ~i e~~ use ~c~ ~~" CM P rev tN 4 ~ ~ a. g~ ~IVi/ 1k~t,T , ~7~~~5~ .~-., CL rw~t ~ ~ ~ . 9 R SLoP~ ~. 3~. ~f~ ,~j ~ (X too ~ ! 4 !, ~~ ~~5. ---~~ ~ ~a~too ~ /, S ~ , ', -F-fu1 ~ 7, ! ~ Lew ~otnfT ~~ ~nd4~ ~T S i A a?~ -~ f ~. Go -/C~L! - a~~'~r D 3`f~ f c~ `~~ ~-. fi r! °/ s ~ ~/ d f C1 , r. ~ r lS 0 W t L C N t7ve~~~ -- r ~~ s~ . ~ ~: s,.. ~ ~~ x- ~ ---- ~ -~ ~,~~ z .;-...t. as.+~.,. r {, a - Q,, 3 ,y`~~ x L ~~ j1 ~+~ ~°GC J tm Y 70-,'~ ~ Y ~: {' 7 J ,~ i '~5~ ~, 7~5~~, % ~yt - P : n ~ ~ ~ ~~~ ~ r~ ~~ Sir `i ~- - - ~ t ~1 , ~ ~ t 1 ~~~ p~., f ~ ~ h~ i :~ ~~ a iF~~.;j ~ ~~.~~'` ~l~i !!{ ~ r7'1 ?t ~. 1 ~t ~~~ f by ~ Pr t ~t { +~ tt ,~ b,~- ~ `; 1 ~ i }~ 1~ I ~ ~I I~ F C °~~ E~ i~~ r' ~ i -_" ~ i~ ~, ~~~ 4 ~ d ~ ~ ~ __ PPP ~} i ~! ~, ,~~ z ~,, ~ ~• ~ f ,~ t~ } ~~I > { C {{~ ; ~ , _~...+~~_ r _ rrr~, ~. a ~ ~ ~~ 1" ~ 1 -~. t 'Y ~ `~ f ~~ K~~ ~~ A r I~~~1 ~ ~ ~~- h APPENDIX C SHEET 3 OF 8 t XFil~'I PL ~ - - 100 s GIVEN ~YDRDLC~GIC CONTOUR. 5. D --2~ oo~ DRRINAGF AREA 35 Ac SMALL HRFR FULL BUSINE55 rt ~ooo ~ boo ANS 1~SiER Q ~o= 39 x ~-4 - 54. ~ cFS ~6°o aoo ~ ~~oo ~ ~ ~ ~ --~ 200 8 _L20o t + °v ~ 7 ~ goo goo o -'~-=`~~ ~ ~o ~ 3 - ~o ~5a ~ ~~ ~ 20 ~ 3a 15 ~ z ~o °~ 20 g i o _ ~. ~ ~ ~ ~~~ 005 -i-- - - ¢ ~ ~ ~ ~ o ~ ~~ ~0 ~~ Q W~ - S G7' R FOR Y D~ ~LR O~~~'1~NT . FigGTORS FOF~ FREQUENCIES j Q 5 : 75. CURYE YRLUE X ~ 0 ~ 35 I Q 2~ G~50 n rt . tt X tt X ~`8~ G2100 ~- tt X w ~o ~' ~) ~i 5 ~ ~PUNDFF FRO/Y1 lJR BRN AREAS - - n1oR~f cRROLI JR~Nsr~~ NIGx~~rRY come la 3IoN CHART C 200.3 c CHART 5 ~ leo ,- lo,ooo E ~ I68 ~ 8,000 I EXAMPLE ~ ~ 56 ~ 6,000 D=36 inches (3.0 feet) !" ~ 6 2~ ' ~ h r-- 5,000 D=66 cfe . ~3) - 14 4 i 000 F 4 6 , Hw' rlw 5. ' 132 ~ 000 o ifeet) ~ 3 ~ 6 , 5. . 120 ° ~ (I) I.e s.a r- ~ 000 (2) 2. r 6.3 ~ 2 5. 108 y _ , ~ (3) 2.2 6.6 4. .~ `D .n feet I 3. ~ 4. - i 96 ~ ~ 1,000 ~ 3. i ~- soo r 3. 84 N 600 2 500 . 72 400 ~ ~ ~ 1 s9 2. ~ 2. w p 300 . ~~ / v (n ~ ~ 6 f. ~- I I.5 Z 60 t v d = 200 ° ~~ Z _ ~*P~ ~ I.5 ~ 1.5 ~ ~- _ °- w // w as ~ g / as=/~/. ~S o ~ J Q 8O i /~ J~ ~ U _ ~ U / 60 ? 1 0 ~ cn 42 / p 50 = H . I.0 ~ ~ / 40 w I.0 ~ ~6 o 30 HW ENTRANCE ~ SCA ~ p LE TYPE w 9 a a 33 20 a (I) Headrall ~ .8 .8 . ~ 30 (2) Mitered to conform W U to slope = .8 v 27 10 l3) Prajeclinq 0 8 .7 .7 Z a 24 7 r V) 6 . 21 5 Ta uu stole (Z) or (3) project 4 horizontally to scale (I), then 6 - us• straight inclined line through •6 3 D and 0 sc olaa, or reverse as 6 _ I8 illu atrated. 2 IS .5 1.0 .5 - 12 HEADWATE R DE PTH F OR C. M. PIP E CU LVER TS WITH INL ET C ONTR OL BUREAU OF PUBLIC ROAOS JAN. 1963 WR-2.7 Broughton Properties -Dissipator Design for 54" RCP NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Mannings roughness number is constant over the entire length of the pipe. flow Q in cfs : 75 Flow depth (ft) = 1.81 slope S in % :4.31 Outlet velocity (fps) = 12.571 pipe diameter D in in.: 54 Manning number n :0.024 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe diameter (ft) 4.50 Outlet velocity (fps) 12.57 Apron length (ft) 45.00 AVG DIAM STONE THICKNESS (inches) CLASS (inches) 3 A 9 6 B 22 13 Borl 22 » 23 2 27 « 0+00 1 +00 2 +00 30 CeB2 (loins sheet 21) wy ApC2 APB2 WAKE COUNTY, NORf ~ ~ . t-r~- CeC T ~ ~ CeC2 ~, s- G`Z ( ~~B _ P B' N HeC2 ~ \ CeCWyI / -CeC/,~~y~~"EnC S ~~ ~ CeB2 ~0tt `~ ~~~e6 <toC -APC ApB2 AP6~ ~6u' J~ I ~. (~ ~ '~f ~~ I ~ ~ ~~ WwF ~~~ ~ p - ~ oG ~ r{p>~ ~A 62'~ ~ ~ ~ fV ~ A9~ WmE \ -ApB2 ~1_ A 62 HeC2 ~„ ° P ~'r ~ ~~ov CeB2 ~_ / ~~~~ CeC- ,` `' / ~ N jj I i r ~L EnD2 ~~ HeB2 1 ~~ D~2 =Q f a ~~ APB. CeC' Y ~ CeD ~ ~~ `~ ~ ¢• - :~ 1 i ~ CeC / i~ ~~ ApB2 ~ ~ APC m ~ ~ it / CeC2. ~~~ ~ ~CeP `~.. ~ ~~ ,A,,~7 Me~~ ~ WY ~ /^ - ~. i ~ CeC2 ~~ - ~ ~ o`\' ~" ~ ~ - AP82 C ~~- o ~ ~ v CeBF WWF ~ ` ~~~ ~ HeC2. v i a ~ ~ VaF2 ~ _ l+ ~ E~~~q,' A ~ ~ i EnB2 Gu` ~A WY ~ O ~ ~ . ~~ ~, e °o i~Pp2' GeD - AfA ~~- ~ ~ ~ ~ ~' \ ~PC'", ~, `~ CeB2 ~ti/ C Cn ~~ 0 1 CeCL ~ EnC2 A C2 ~,'.P ~ CeB2 ~ R ~ '~ ~F ~lc~L-~ -- I i C ~ ~,- i ~W ,~ ~ ~ Cm ~ _ HeC _ ~:; ~' ~ APBZ ~~ ~, ~ ~ - ` ApB2 - C, i -~ ~ % ~ C m ~ CeD ~_; j LoD ~Ir LoD ~~ __ : ~ ~~ ' ~ ~ ~ ~ ~ ~,~m ApC2 a _ CeD ~ ~ i pg Cy 4- c>~' ~o~,, ~ ^ APC~ ll( ~ ~ ' / v ~j - I ~ / afA ~ ~ APC2 APB - ~ ~ ~ f ~ A_pC2 ~ ~ ~ "~ O Ce82 ~~'~ 1 _ ~~ AC i '~" ~~_ ~ ~ '~ ~pB2 _ WmEC~ /i.,'> _~o._ ~ Ap~ CeC2-. ~O ~ ilApB HOC . ~ B ~~'~ :~ i ~. ~ / cct~ CeF ~~~ ~~'~ V 7~ CeC ~ ^Q u V LoC \ it PQ6 NpC2?~ ~ EnC2 ~' ~ ~ j/ ~ 4 ~¢ y/ ApCZ ~~i '~ ~ a ~~ ~ ~~~~ CeC2 CeC2 _ ~ ~~ ~~ ~ LoB i ~ e~ ~ ~ PP~'~ ~ AP~ ,~ 1 ~- ~ ~ ~ '/Ce82 - APB2 e En B? ai~c "`=' / Gu Q~ `~-...APB2 ~ ~ h ~ CeC2 r / `~~ . ~~ ~ _ ~ ~A ~L___~ C~ ^tJ~ van _ _ __ _r _ _-- " - ~ Q,~ ` ` ~- APC2-' ~ ~- 0 ~~ ~ ~ Di ~~Cd _ Eo~ ~o. APBZ ~;,'% Cif, ~'y ~L ~? c? \ j J' APC ~ - 3 ~~~\ ~,, t ~~ ~~ ~~ APC2~~~ +.~ ApB2 - 1 o Me ~ , n CeB2. L ~ ~F~C~ ~~ ~~~ e ~ ~ APC ~~ ~~~ m' W Wo~ N ~ RpY ~ ~~ ~~~ M N ^' HeC2 CeB2 APC ~ _ ApD ~ ~ N NiTt. QuA " ~ _EnB2` = ~ HeD -_ ~ ~_. m ~R'P ~~-~-.. % wry _ APD WkE ~_ ~ kE _ ~s Ma ~f~. EPC - ~~ ~En62 ReC o A C ~~ p iu , CeB2 ~ C~`-- ~~~ C ~ P - ~' ~ .~ - ) _' Gu a HeB2 HeC2 APe2 ~ ~~.. ~ ~ ~ G,u~~ ~~ HeB~ `~ ~ `~ - 1 ~,~ .~ ~ o~-' Gu ~, Lalre Gresham ~~~" ~~ Gu s yti ~i j .~ ~~ ~ 1 ~ ° ~ HeC2 aF -o ~~ DuB ~~i u ~~ / ~ ~ ~ T ~ WkE ~ WmC / ~ A^/kE ~ oC LoD I I I ; ~ AC2 - 'lea: ~ ~! ~~ I <00` _ <vi p i ~ "~ i -~/ 'ApC2! ~ n F Cm 0 = ~ ~ ' / ~ " ~~~ ~ Wl;CG o ., i r ~ Wo ~. _ ^ ~ \ ~ ~CeC2 ~ ~ ~ ° ~~ Wo i -_ .0 ~ v- Q v s ,' Wy ~~ i ~~ / - LoD ~ /F :. a ~ ..APB2 ~ `~ iWkE O~ APD ~Q' APB2 `L -' APC. '. -.~ ,.~-~~-; o P o ~ Ma t APC2 - P ~ ~A ..APB ~ ~ o ~ ~-- ~- _~ LoD ~Me~' o ~ ~ ~. cu LoC toB f ~ ~ ~ Cti ~ ~ a ~ I WmC .~ ~ C2 I WmC2~, ~~i ~~-. ~~?~ J ,Q / - CeC2- (~ ~ Cn~ ~,1 iC~t ~( i _ CeB2 WkE 1 ~c;°- /~~ CeC2 ~.~„C~~ o, ,, ~ /- ~ ~ APC ~ ~ - ApB2 ~ ,~ LoE / ~~,F Y... ~ ~- e J / _-CeC2 °o ~ e ` v~" .CeC2` CeB2 ~_/~~ (Cn L APB2 ~ ~~~ \ ~ LoC ~ ~ ' ~ , O Y ~ ~ ~.~ ~~ Qom,. ~n ..APC^\ //~.r.,~ ~ PC ~ ~\J ~~1\_~., / ///~ \~ WkE ~ ~~ ~ J~~A~ % ,. ~ ~ r \~(', / ~! ~ N ~ ~ \~^~UD~AVC2---/// /\1'HCi.\ __ ~\\~ ~ ~~ ~hmBj~ ;"JinB~P~ dE2 r-Gu ~ ~~CeC~/I HeC2 ~~ ~~ ma / ~ ~~N ~,~J% /~ A ~~~/// LAC `~ ~C2 \ oo° ~ ~~/ ~ A~ ~ ¢ApC2 ~ '~ tivFj~,~ ~ / \NkC LoD `` ,` ~ ~ ~~j CP ~ I~ ~~JIT'f Can I WmB2 i `r CeC2 ~ / F'~ ` f \ ~-Gcn~:f~'D ~ ~ APCZ~ ~ i /! W~ o/„Y S ~. AP62 ~ i ~ LoB ~ LoC ~ ~ CeB2 ~,~:/ APB ~ ~~ ) APC C \ ~ WmC2 ~ ~,.. ~C?. r1 '~ ' i"' `\ APC2 ~~~ l VJkE ~ LoB ~'~ ~'A'mB2 ~ ~~ °o ApC2 ~- o PPCZ 1 U P4 ~ WkE APC2 ~ LoD ~- ,r, Maid x LoC LoC gpeMe LoB ~ / Wr ,, CeB2 ~, ~~ WkE ~. 2 ~~ LoC / ~ ~I ~/ ~<v ~-~ Wm62/i ~' mC2 ~ o ~ ,. APC2 ~i~` / WkE ~ y\ Lo WkE o \ LoC y LoD WmB2 LoC ~ v ApB2 ~° °'^ LoC (~. ~ G Gu ~,° I ~,°~ mB aC2 ~ -- ---~_.-_ / ~ _ ~ . i IP (loins sheet 40) WkE LoC ~NkE di ~C'oNi`w~ 0 b ~86; Q; ?}f" M Bri N ;- v ~~ ~ !~t ~ N 'C C 0 ;~ ... ,, ,- j C~ , O v 0 °o 0 LoC - _ et 30) . Joins she __ ~ ApB2 b,~ ApC2 Wo Y ~~~ ~ Wo 1 Ufa /~F LoC ` ~V ;~ s` ApB2 ~ ° ~ ~ , ~ _ 1 wi )~ 1~~ ~ « ;'s ~ CoC Wo Lob WAKE t PC2 Lo6~_ _ ~o~~~L ~=WmBZ.--. ~~WmB2 F o LoC Lo(' I W ~ Gu `~ APC , `i~ ApC~ 4Ymt3Z ~,~ Lo Lo C ~o~ ~ ; b,.: '., ~ , m ~~~~ ~, ~ ~ [ t W kC r ~ ~ ss ~ r Mwr lid-="'-r A (';' ~ I - ,~ . ~ . c.L .~~ * Pp~ L6C !~ \ ~ 9q '.yid ~~~,~"d ~,,~,~kE P ~~ ~,~ , g~ ~Wo~ ~ Q Lo B CeC2 !- ,w r ~ -'- /s . s ' Ap62 v ~~ ~ ~~ " ~C LoC~ ' ~- k'A~iy r"~CeB2 ~~ ~ tiMmeW ' ~ C PL 2 HOC ~ '~ ' ~~' ~ ~~~ I ~ . `~' '~ _ _ ~ L- ~ /~n/ O ; Wc~~ CeB2 \ ~ ~ ~; -- c`~' t : pG`L' ,~° _~ a ~-, ~~ '~ AP~~, ~~ ~) 1 ~ LoC~~~gp~,~~p~ E ~ ~ ~ l.v~, Me ~! ~. /` ~ ~,\;_ `IE33 ;: A7B2 / ~ '~ `., ., O ~ ~fi,~ .°~ ' - ~ LwC ~ v ~ ~ ~ { ~ W kC, ~ ~ P`~ z~ ~ - As B2 ~~ ~~ `~ ~ Apl'2 ~ ~ ~I~r, , ApF32 Ce['' - ~~~ +` ApB2 ~ ~ApG1 (` ~ ~~I~k ' V/~L, ~, ~ ~' t~. ~~~ Ce[32 ~ ~' ~ ' I p'~ !~ -~ ~~ ~. Wm62 --~ -; .~~` ~ I. ~ /"}~M2 ~ ,F ~~+a$NY;'~ n+'ti ~ 1 / .l;Wii ° ?. I,j~ I J~ i 'aQ~ /i _ ~ -,I `~ Li~(.,~ r,~l ~ _ f waT f12W5~ ~~, l ~ EnB2 ~~ ~ 1 ~ ~~ ,+ t` ~ ~~ I I ~ I ` ~y . / \•' 1 ,;~ I ~I~wC2 Wm62 _~ C rch ,~ @.,'~ ~ L~~r ~, '`~ ~ _ .. LoC 2j ~ ~~ ~\ ~~ Apr ! ~ ~: ~ ' ~' -~ ~ ~ -l1 Wo QG ~,~ ~ ~~- Ai~~r ~ ,~I, r' ~'~ ~ ~;~~~-~/ ~ ~ may--- --~ ~ ~~~~1~ ~. /~ WmE ~' ~~~nir.2 ~ { wC2 ApC~ ~ ~ ~ ~,~ ~""~~,.r , 1 ~ / J p (. ~ ~ K E ~ ~ ~ "... M ApUI 1~~> ~ ( ~ f,r_~ ~~ ~ ~ Mt3 - ik``h~~,,'j,.,~~>_~'~J"k ~ -l`~~b1 / ~~ ~ y ~ ~ ~~ ~ ' - DuE3 ~ %~ - ~ ,--- ~ . t '^ i_nC2 ,~ ~` ~ ~,~,ApCZ, ~ ,.~; , ~ --' Uri -- ~ ~ ,l ~ ~ "~ ~,,.T~ t ~~ ~ ~ / ~~, ~ C~ urc qpB~ APB ~ G~ r ~' ~ o ~ ~/A~ ~~~~~, , ~ ~ : , "~NkC APB? ~ ~`,/~ !i~li,~< ~N1a ~ ~ ~ -~ ~ ~~ LoD `' ~ ~" ~: ~s~~' p Ma 40l rC•, k nG -~ ~ { uc ~ ~ -/~~ ;. - Ce8 - cec } M i?~ ~~ v o #~ Lay ~ N ;~L 40 (loins sheet 30) LoC LoB LoB WAKE COUNTY, NO ApB2 ; r -; ~ Wo ( ~ PC oC WmB2 WmB2 N ~ Pp~2 Wo ~~I'~kE wke LoC ~ '. kF' ~o L'oC _ a Low Wr Wm82~ t _ (~~ ` ~~ ~~Ap°2_ - ~ ~ ~ ~ ~-WkE ~ ~ I `_ - - ~' ~~ ~ i ~~~ LoC_ ~ N,o r ..W APC ~ ApC2 Gu ~ ~ 1hmB2 - LoD ~ !, ~ L ~~ I' /Q~ i ~ ~O ~ ~~ _ ~ A _ ~~ ~ ~ . LoC goy ' I m ~C2~ ~ ~ ~~ ' N1mC~ CeB ~i ~~'~ P~ ~ ~~: P t": -- - E ~I ~~~ 'I ~\ ~ '~ WkC ~ ,.yVkF ,, . i ,. i A i i~ J ~ - ~ AsC2 ~ 2 F-~ _ APC2 ~I ~ ~ ~.~ LoC ~ ~Ap ~G ~ LoB ' ~C~i'~~/'~ ~ - \ ,.F LoB e _ W o CeC2 i~ ` ~~ ,w ~~ ~ j I a~,: I\ s' Ap62 ~ ~ li ~ ~i~ LoC ~ v y .. .. I .. j ~ v~ ~~ ~ ~e ~ ~-~~ j WkCI LoC /~ ~ - ~ ~ ,~~~2 / Q ~ ~ ~I~ u o ~~~on ~ ~~ , i,. ~~ WmB2 ~/ Ce62 ~ 1 -~~ ~~ CeC. / ~ n,,, M2~ ~I~~ ~~~ ~ WJ -~ ~~ ,~ Me,, _ - -~LwB- - __ Me ' ~ . v0 Wo ~ APC2 I,I CeB2 LoC Ap~2 4p~ `~ ~Q / P c`~'I / ~' Lw~ ~~ II CIB3 ~ j ~ Ap82 % - "~ ~' ,' WmC2 . - -C oU I~; ~~~ ~ - . lam. ~~ WhC F ~ P`` ~\ '~~~~ AsB_ I _ APC2 - i -i I ~ i °.ApB2 P~- I~ q _ ~ h% A~~C2 CeB2" III - I, W ApB2 ~ ~` ApC2 ~~~ ~ l~F,_ ~ II hC ~~ L~ r WmB2 ~~ ~I I ~ ApB2 III i ~ i ~.- ~~ , ~ ~ ~ ~ _3 - -' -/= ~I~ _ ~ ~ -~ - I, ,•Z s2 I ,: ~ ~~ - % ~ ~ ~'~ L<< ~ C 1 - ~ t~ a hews ~ ~ 1~ ;~~ EnB'< I 1~~ ` /' ~ ~,~ ' ~I ~.~ WmB ~~ "C rch ~ ( . WkE'" i~ GL ~ `' ~~ ~ _ ' LwC2 WIC ~I>_ ,I" i~ 'I' ~ ~ x _ o~.~ n , phi ~.~ Wm62 ,i I ~~ r ~ ,~_ - i I - ~ ., ii2 '`Lw `WkE C2 ApC2 ~~ ~ ~I ~~ I I ~ ~,i~V-c' ~ ; L ~ , F L `~I _ . ~~ ~ J ~ APB2 ~. =i~ =, ~ Wt "'~ t_J .- ! ~ I ~ ~~ I I ch -APB? , ..~ - - Me~ ~ `1`IY`~ Wo ~. .WkE" LoD C^ ~ t ~ ApCc ~ i ApC2 ~~ ~ - LoC _- `~ ~ [~9/-' s ~` i -' ~ I o :~. ~ ~ ~ ~ A C2 ~ ~oG~ ~:qpB - .~ WmC2 '^ EnC2 ~ ~ ApB2 ,I \ - ,Gu O .c ~ -~~~-~ y"[y -~ ~ A ~ N Erpe--~ - ~ JI ~~~• ~ ~ ! ~' ~ I _ ~ ~!~~, ~ ~ C~urc 'APB2 'APC2 ~e ~ Gu ~ / ~ / ,-r // ~.r U /LoD ` ~ ii ~'~ ~ ~ - '.. L 0 0 .. // ~ °' 4~' ii ,, ~ r. p _ ~ ~ •9L ApD _ WkC ApB2 p Jl ! ~ Ma ~ ~ ~ ~ ~~LoD ~ ~ m - ' LaC' ~ . WkE _ ~~ ~ ~ ~ ~~. I _ ~ o ~ ~ ~ _ ~ ~ LoC (n ~~~~' APC' ~ Ma ~~~ ~~O I_oC -~ i LpC' w ~oG I ApB2 ~~~~~ LoB o ~ i ~' vi CnB2 ~~ ~ - ApC2 ~~ 4PC2iLo8 ~ ~ ~ ApB2 _.,_ Ce[32 .W~~~i ~'- 'i ~ '~ ~.'~. .LoD -~: Lop ~h. d ~ ~ i_ GEu IoB n i °~~ ~ ~ ~ ". ~R,~. (~ ~ " 'LoD (- __ ~-~ ~~ ~~,'~' pGZ/~ ~ ~ "~ ~ ~c~ ~ o ~~~ APE2 .-- i/v~ ~~ ~ ApC2 ~ _ WkE - LwC2 ~.~ ~ . Il ~ ~ - - -_ ~I ~~~. ~ WkEv/ `v R, ~~ j / ,'~" 1 1 ~_ ~ Gu~ / ~ I ~ ! iw I w / ~ I _ ~ i~ l :~ ~i I1 j~ r o ~~. \kF ~ ~ APB- ~~ ~ \~ ~ LwC ~ ,/ "~ I W m E~~ ~ .~ - F - r ,l " 1~~2~ ~~~// \~~~~ / C2~' .CeB2 %~ ~ VJm67,,,: ~ I ApD, a `~ Pe- -. ~~ ~~ ~ ~~ ~~ f ~R, io ~ . ^\ o APC2',-` ~~r ~/~ ! ;,G1:2 f=~ ApB2 ~ .v ~o ~T P LwC2 =--- -~/ ~ ~~ -„ ~ !/;/. /. ~`L~~ / ~ LoQ~..,-// J~~`_._ ~_._ VVmCVJmti2l: / ~o ~ v~ i c ~~ Gum ~ ~ /~!! tvla1r _-`~_, i/~QG~~. P. _ ~~~ ~~~ Q, 4~~ o WkEi H ' . \ ~~1~.- ~ , ~ ~ ///~~ i~ -~ ~ APB2 ~ "~ ~ WkC ~~ U loC o° e~~ !/ A C21 ~ Q ! ~ WkE. DuC N /~ P ~ ~ ~ Im ~~~ ` / /! c { -~ APC li ~ LoB ~~ LoB X00 - . G // 4b1 U ~' GC HeC2= : cPC III APB2 ' APC2 App ~ I% P~- ~ LoC~ ~~ _ ~ ~/!r .e'~~ 7 WkE ~o . \ ~HeB `oC % Ma WkE i,- aPB2 _ -~ .. . ~ WkE WkC -_ t! ~ /_. WkE --- __ -';_ - - - -- --~---- WkC- r wk~E (Joins sheet 50) 3 rC !-J t_~ i`~ `=~~ C:\wake gis1t02_1726.dwg 03/20/2007 04:25:51 PM ~~~°v Q ~ ~ ~~ 0 do --~ c~ C -A o v O a a r ~ a o a~ ~ ~~ , pp a m J > A 4 ~ ~J_ ~~ w 3 ~_____c-J' ~ o W J C7 Z O it 0 ~. _,~ o.. ,_ _ SUMNER LVO -~-~~ ~ v 0 0 D ~ o ~ ~Q o ~ ~~.. .rte ~ uv v u ~ ~~ 0 D 0 a oa ~ ..a. o ~,a 6 O ~ ~ _~ ORE T RO U SPRIN " _ a 7 ~ ~ .,.. ~ n n„~ 1~' ~,; v/ „ i~..ux, s .-~ i ~ 5 j ` ' WK ~ AP 2 aee ~ ...,. APB C C2 e U Ij ,~ ~ , A e CEB2 "~ LOC U K APC2 _ , ,,.. .~~ .,: ~ ~ LOD WKE q" h ~ g e s~ LOC •°" -~ W ~ ' ~ Loc ~ OAP ~Jt,~ ~ , ~ J > i~ K~, ~ ° AP& p F ES DRIVE °• 'a; .. z n aaa _ LOC AP 2 WO ;~„ i \ w ° ,~., ~ ti ~ ~ ~ ~ i MA s ,,., [ .,.. ~ ~.: ,,., .,,. s L .,.~ L0~ ~ . ~ 't .., ° ; °„ ~~ ~ ,ew s' Ana °~ R ~., .,, .A' '{ a °~ - C `^ ~ , ., W~ ~ W APC o ,. _ E " i ~ ~ CEB2 ~ • W APC2 ~- CE 2 ~ ..,. ,., ° •• '° GErB2j i ae, i y Z N wcs A .s.. ss,e ,<:, i •~~ G FORES ROAD SPRIN ,. 1' ~~ 2 DB D ~~ n 0 z W LOC ' APC2 LOB LOC WKE APC ~I LOC LDB W °".' APC2 WKE WKE LOB I \ APC2 4 WKE •~ LOC a - r°a° APD `__ ~ ~Ft.: r.". C:... .,..._ ..._~ `~. ~, - ~-1_ _, ..~_ -_ ~- -. ~ ,. ~'_ '~~~:t . ~..~. ~C)4k direst ~ ~ ~ , ~.- ,,x` ~, k _. ... --- ~-- r s~.::f v ~. ~.. ,, L , _.. ,~r - - - - -- - -- -- -- ~c ,i t: -~ ~ - f .h ~ ~_~rr-site cleterrnlr.:ltac~rt kh:tli t~,:irc fitic :~i ~:L~t',s Ert~tti tftr t1.tt~ ra`tf~:s I~:~tlt•r. [„i r~klai~ti•lrer°~ c.r• ,~ff~cfei f~a; ~Eis E~:;t ~ic~rule a r}t?u~r;~inst ,~ n:a.`r },~ t;~ T3"~t'(1 ~~r I)K'Et°~'.,t~9 I~ac<rf ~tltfr:,r;t~ qiE:~: ~ ~ar,~.le~e n:;trr t ;i>t4 grid !' is ii ~t;i?gtet Ici ?}>e n~,~er n:te r•.auc re~lrz•st a :aeiirl:'r• ;,tsC!rt E~~ ttte I~are~ .'>r. :1 r ~ques' f~i;`;i ~3es~et•TniuM~tlt~tt l.~ tltt• ~irecttir airai tit' r~`erred t~ tfrc ~lirrcTr?rlr± z;:-iin^ c~a Ctnt~i Kart;?~ . t~it't~ 1'. ct!ancls'~i~l I r;it. ~_'I t_ratit;'c: fE:tf. I:;+iti~„f1, ~~ y,"ti~f~-?~E;ri. Ind.i€du::f3+t1t<tt drs~~;.tc :i t1L•tt<:tteln;!t art ~~'`, t}:E ~~~;~(~ 53r t)E~t1~:lit-C~ r.Cit:if \I1?)t'.tr7'l i}I `3T ""4".714:TIl~lti~' ~ ~'t1 ~.~Ce titi tCI' [rdarli i~l°: i tifiC'i f-31ft' I7 :3k e:tifti f(~r ~~ az3 ~ucitcatf-~r~~ k',~.arin~. '~~c~u i'<lu~r :I i 4 ,trri!'c 5fJ cd~~~'~ t~~ i~t~; ~.ite 'fist cvti r~~£f~u`e-this it•ttE-r. _-~pl~lic~ttts are ` ^r :.~a it si`i! .- :. _ r, ,: .: .~ ..-, ._ _ _ __ - 'r4 ._ __ __ ._ .. ... . _. - - r. _ .. -._ ,~ _`S-.. }itrrfiia ^:,titt~ cI tl-sr t's;C (~t ~.Lti~ ~t.~ttstrir z i ~t~il tirr3~ tit,ec rr~t c ..rr r_~iri7 :)7z` a}`~:tf~1 dart. it~iCL1t~~T7~ ~~ r,,_a•carT, :.rt' .. ti; a~s~FSt }<inu~rti tr;~ri nt>tifii'd ref tai deci;on. T9`,~"{k r-ticr?tn>ziantz~. il?at tlsa• ~}~t?Eic.atit I`irndts~ t t` s~ s. t)'i,~~:it;t>r. Lrs rrrd~r iri b~ cc _aTi fl=at thin} pat-t~, ~~;} _~;lti .:ri trac}c• iCT a iz13t-`c I*tc.:~ricl'. ,k.~ ail, ft~t i hezs ~::: t} _ s:~F, t7 itZrfstn~n. ~• } t~ i1 iat ;ufaLti icy Chap~~ ~>i+b i'-ttt~ ~ur-th Ca cri':r.~ (;int?ral *t.:t~tt~s tci .ht L)tY~i, c,f ~ !tn"s n><irati'~c iTt`arir.:>. o"td '~i.ti ~~t~:.c ~ c..7ter, t2alei~kt. ~.t. ? ssr'?-~,k~t. Tkla rje.c n :;_:=tir,n is =in_il a;.c? tjisidtt_~ Tarlc.: ~us~ : ~~ fr~r a hc~.rir~~ c.-t:?it i>+J c?a. The !n«~ner;i~ttsrcr r>ti~~rtc. ~'s 53tottld ItcFrif}~ Ctte lliti~iian ttif ~~ tttt /)tt~klit~ iiTtcluciin~ 3n',-oiher T_~cal. Stag, ~.~~ ~L'tlef:il ~r`k'TICIe'~l iri Illt - CI CCLS t)It Ctiit C2I I7175~ :i I]ti' hflLii'f' C~STr~~7{;Ii l1Ci94`C'> I'E."~;:3rcl TItn L1tC' tiL'~)~tift l~rt>~1[rt!' (st~atet~? a'tr~ta. f s7:~ ir~rjt~ct tt.a~ rrikuirc~ ~ ~ect:t~rl -0-t;'4tt1 Parr : ;v t;~e pre~oseti zct=tits. a.n+ ina::lrie shanld he tkirectccl tie the I)iti ifitin ct{ li atcr ()oaIi~ (Cerltrai (1.}irc at ~'~19}- 3;-1"`;6,:iTtri ;he L ~ :krtlt L t:fp cr£I~ F.~~in~cr. ltttlti_}s iF'.e~s:33?ttr~ FeliiCl~hce~ ai (a1~~-~"f:-S;?k. "`-~.-- ~.:,.... ~~-3 ..a_.2a JJ.}^T. ...~_ ~S .-`til, - -1 ~r.. .~'iL'P ~. ~, ;~1.,~ __ `, ~..... .;h. ~' 4~ _'r'tjtnr- _ ~ ~ '~~ ktr.~~a, P.~ ~r~ _ .~ , .::Ic , '' : ~ _ . ~, ~ rid`.:. ..,. ~. .. ~ J~ ~ _ .. . _. t, ... _ . , .. , ,. t _ ~. ~- .• ,.,~ U5~ ; fta9eigh East ~[dC) Qtaadra~tgie ~ ~~.; ~ _ r~r~jec~~~~ ~s ~ ~G3F12 1~ A~~ ~~trt ~ _. ~_` ~, r ~t'~° ' `~~.z~-~.~~.tc~~s~z~~ ~.~~~~_ ~Y~r~t. ~sr : r~ '~ E*€:'+.j _v "~~ I ~~=?-=~:~iz~=~ u _ ~, _. •~ ~. ~ ~ a) i~~.k l.r' ij ~.~Zf~. ~ Ti ~T i 7 t 'F r .G~,L'~:.f?~.~iS1 n any rrir;tt2~ ~~ -~1?i.iJ11;'~= ,`_b~~,_ _ ~~~}~-~e7~t=c~:tll3=~~?~~~.. ?,~„~5 7f~t~_ ~ ~~~~~ i w~ .. ~ :_.:. ._ 4_a __. Ica qi i, -_ r~~~ ~ __.. _._ ., I ~ ,u, i, __ _ _ CH Engineering 4601 Lake Boone Trail Ste 103 Raleigh, NC 27607 September 17, 2007 Memo To: John Dorney Ian McMillan NCDENR-DWQ Ph: 919-788-0224 fax: 919-788-0232 Subject: Broughton Properties Subdivision and Oak Forest Drive Extension Water Quality Certification for Stream Crossing. On July 20, 2007 the following met in the offices of DWQ on Crabtree Blvd. to discuss the subject project: John Dorney, DWQ Mary Jo Lee, CH Engineering Tom Hepler, CH Engineering Ed Bailey, Developer This meeting was afollow-up of a meeting held in DWQ office with Ian McMillan and Annette Lucas in which we were encouraged to coordinate with John Dorney. This project involves the extension of a City of Raleigh Street east across an un-named stream which flows from South to North into an in-line wet-pond which was designed as a mitigation measure for the implementation of the Triangle Towne Center. John Dorney was familiar with the Triangle Towne project and the purpose of the wet-pond. Apparently, the wet pond was a measure installed to compensate for wetlands which were destroyed with the shopping center's construction. It can be modified to be used for stormwater storage but credit cannot be taken for treatment of water quality. Water quality treatment should take place on-site. CH Engineering was directed to develop a schematic plan for stormwater treatment for quality for the entire subdivision. Description, general size and siting of potential BMP devices should be shown on a plan in order to treat and reduce the TSS and Nitrogen. It is understood that these individual devices would be reviewed by the City of Raleigh in accordance with DWQ along with measures opted to reduce runoff impact as a result of pre-post stormwater calculations. BMP worksheets would not be necessary at this stage but would be submitted at the site plan submission stage to the City of Raleigh. Page 2 CH Engineering indicated that field location of stream and wetlands were being performed by Eric Galamb. As soon as this is complete and has been confirmed by DENR and Corps of Engineers it should be mapped and incorporated onto the next plan submission to DWQ along with the BMP's proposed and the completed necessary forms. In the meeting in May, we were asked to investigate modifying the culvert such that its angle with the roadway falls between 75 degrees and 105 degrees, however it should be placed to follow the natural stream bottom. The length of stream impact cannot exceed 150 linear feet, otherwise a special permit must be pursued. If you have additional comments please indicate in the space below and return to CH Engineering office via mail or fax. If we do not hear from you, we plan to proceed with preparing the plans and documents per this memorandum for submission in pursuit of the Section 401 Water Quality Certification. Thanks for your time and input on this matter. Tom Hepler, PE, PLS Cc: Ed Bailey Additional Comments NCGS MON 'KMART' '~ , Da Y R VISION E=2123635A4' \ z A ~, ~ D INA0631 ~~g. ~A'9jp LoTS1,2tasxauBE Z \00srJ A~ssTOI~ONTOb~m SUMNERBOULEVARp m ~ --.___ ~__ SWNERBLVD 90'PUBLICRM1N ~ m ' B5 bb O ~ u ~ - a -~. - -__.___ 24'RCP -' _ C awm ~ '- e X ~ ~ ~ ATEA LINE ,a tr° W: ~ ^ Ckfi 2%5 ~'+....... ~ 0.5 SLEEVEAAND I u • ~ ~~ - L O p ~ ~ Y >r'" ti, J ~ I __E2 x:.06' ~ fir'\~.~ ~ `•. [ / .. '~ t~ 17~.v ~ L.' ~ .. ~ ~ ~,~ n ~ \\ / ~ ~ ~ BFP ~ V ~ > Z ~ i 1, 6"WATER UNE ~ ~\ O ~' , ~ c ~ ( ~ ~ • ~ •• ~~ ~ 243ACRE5 ° ~ i TovrEaH~atr=ss I ! ~ v~ ~ ~" ~ ,~~ 1 X ~ ° SKY e ~~~~ ~ POND ~ ~c 0~5~ Es ~ ~/_ . 1„a, ~~ OJ ADOPTED FSaM ~ ~ ~ ~ v) ~u A . ~ ~~ ~'' ~ ~ BOM 2802, PG.1318 ~ ~ I ~ ~' . ~ - = ~,; /r ~~ ~ ~ ~`~ ~`~ ~~ ~ ExrsnNG saruTaaY}~~ I ~ Q i , ~ ~PMASE 1 ~ ~ .~ ~ v ~. ~ ~ - ' rrj{ti3lia ~~ TT ~ i SEWER EASMENT i ~ - ~ti ~ ' ~ 3 ~\~~ ~ iO CITY OF RALEIGH -p'4fl - • ~. ~ SNP}' UR.i~ ---_ _ ~ 445+J ACRES N ~ j ~ ¢k SANITARX SQ1ETi EASEMENF.• `W4 4O CffY OF RALEIGH Q~~ SjQI)~' J.~ NOR_TH RAL~BI~ ~ ~ , ~, , w" . `~ ~: ;~ ~ , ~ snwrARY sEhER EasEMErrt a,Q+~~ iI ~~PIN ~172669BB59 IM I ~'3 ~~'~2 z°o ~ ~ ~+~~ --- C&G (TYP) I5'PEOESTRW! I / 08 670j;Y(,.D534 ~ ~ ~ z~ ;h~N a'^~ ~ ~~'~ ~ ,~ ~ ~ ACCESS ElSENENT ff 1 20NED - Tp _ ~ ~ ~~ ~ ""O ~ Wa ~ w \\ (VACANT( ~-~ ~ ~ ~' a~ 1,1..E ` : is / i ~ i~ o /~ ,o- '~` •., J.G. TRIANGLE PERIPHERAL SOUTH ~I ~w mmW 1 ~ ~:,~.'L. - _ _._~=. _ q PIN x1726596068 ~ _ ~ °"•°'' r "! NITARY . ~ -_- _ •, OB 10660. PG. 1578 ~ ~~ ~~~ ~~~'V I ~'~ \ ~' - - ~ _ ~ - ZaJEO - TO mw w~ r w (COMMEF~IAL) ~o ~~au ~~~ I ~ -. ~ - - ;~1~"` _ ~ ~ ~- IFO~ RD.IgC P N 72679 4 ~~ ~~ _ ' _.r- ~. T ~ . ~~Xr', r;_i ~'' __ ~'"; ~. - ' ~ , \_. ~. OB 943.5, PG. 853 I -~ ' - - ~ 5'~R"- IDNAL - `\ - -- ~ I ~ ~ r ` ~ ZONED -CUD SC ~~ ~ ''i; ~ ~, - ~ ~ ~ G. FUTURE CONSTRUCTION J~ .°~ '" ~ a $A ~ _~~ ~ o ~ (BY DTHERSI OFFE0. FOR LRObb ACY[56 AGRE9IENT f0 ~' ~ r t ~ t ,.~ AOCOMMOOATE ACCE5SSS5SSSnmIOEVewPwEN ;[~' ~'' BNP s J ~ 2°er ~` y ' • I OFABNCFM LOT •:4~~~~-uC~~ ~ ~ ~~\~[ h f lJd J~~ _ - ~ "^ - - ~ Z 11 ~ @^'' y7., ' , / J ~ ~ 1 1.~ , . 'r f t /.2PAR~ E~riER M i0f. ~FT ~,rf~e~ -'E ~" ~'N,-va. ~.. ~- _ = 8MP ( %: j I' BLBJ SSOC. ~ r " !~ ~ BMP :, ~ «~ m, I PIN x172583676 ,~ T66.1-ACRES f ~ i~' 1/(PHASE( - -~~,~ 08 343~,PG.113 ~' ~ r• t ~'' ~ ~ ~• ~ ~ -~~,~~ ZONE - TO ~ =~~-N, ~ / ~ ~ ~ 4 ~ ~"~ '..~~.. USE / . ~ ~wEE ~:. // ~ - ~' '~~' ....~ ~ . ~ ... 7. i "~, • . 3, F - ~ ~ TtwsuFr~a ~ ~f ~~F•adRFS~' ~ ~~ ; ~250«1vAC ~ ., .f4~~ ~. I ~ ~ ~ - xrs ~+^UT -Py~~ - ?.ONE1. ~ ~' uJ , ~ _ c_, n .. RES' ~' ,BMP i ~ z , , urv n I I BROUGHTON & ~LEV PIN x1726581 D6 4056, PG. X37 ZONED - Ty ICOMMERCIRU I ~'` ~-'--"~ I{ ~~ ~ / / ~ H.32H ACRES T~ (2. -PJfiASE 1=~-NEIfSE~- ~ ? ~ , _ '- ~I ~ RIVER ~ ' ~ ~ i ~+ ~~~ .~ - ~. -J2IPARIAN-~ `~ ~ ~-~ ~ ~ ~ . - -=~ BUFFER ~,/~ ` ~' _ (5405] ~,t~ ~, ,`` ZONE2~. k.~`I ~ ,1111~.,^9~$. 1, !~~ ~ i~,~ ' X ~-'--. ~ ~~~ ~ . ~~ nts )q `~=`~ ''~ ` '` ~._. ~ ~ ~ ~ I ~~ o X 142 ``.. - -~ ~ a ~ E,~~ '~ ~ I~RES; ` , ~~ ~ ~~~ ~ Ais _ ~A L-1 , . IB'ER MENTE ~. / '~' `~-',. ~`~ ~~~PNA _~~ -.\\~ u~rN,Li~r~ ,„ CROSS ACCES5~70 ACCOMIAOOATEACCES$ -' r' I f ~`~ _. YATH OEVELOPNENi OF PIANBFOR LOT672611 l.r^^" I A.P. SOUTHEAST PORTFOLIO PARTNERS PIN x1726573663 DB 5893, PG. 63 LEGEND ZO(~0 - IND-i I (COhWEACIALI II -----a- PROPOSED WATER UNE I ~ PROPOSED VALVE PROPOSED FgiE HYDRANT (MO PROPOSED BLOWOFf ASSEMBLY I ss- PRDPOSeosEWERUNE PROPOSED SB MN PRIMPRY TREE CONSERVATION AREA I SECONDARY TREE CONSERVATION PANELS ACCESS EASEMENT DESIGNATEDYJEIIANOS BURRING ENVELOPE ..~.0 POTENTIAL LOCRTIONFWi STROMWATERMGMT. DENCE ,; ) ; i~ ~ ---c ~~ z` t ~~ ~~ ' x ~ i ~ .'. B' , . .. a ~ S -. - w -Put t , ~ ,` P it i i i i o~-o~v~ ~z HAKE CO. BOARD OF EDUCATION P1N x1726578127 - OB-2128,PG.47- ZONED - R10 lsCHDOLI '^i r ' NOTES: 1. WITHM THE SIGHTTRIANGLES SHONM ON THIS MAN, NO OBBTRUCTION BETWEEN 2 FEET ANO B FEET IN NEIGHTABOVE THE CURB UNE ELEVATION SHP1L BE LOCATED IN WHOLE OR PART, OBSTRUCTIONS INCLUDE BUT ARE NOT UMRED TO ANY BERM, FOLIAGE, FENCE WAIL, SIGN, OR PARKED VEHICLE, 2 EACH L07 OWNER SHALL BE RESPONSIBLE FOR PROVIDING DETENTION AND BMP LOCATION ANO CALCUUTIONS RS EACH LOT IS DEVELOPED. IOCATI0N5 SHOWN ON MAN ARE TENTATNE ANO NOT S¢E0. 3. THIS SIZE E%ISTS ALONG CURRENT CAT ROUTE25C (TRIANGLE TOWM CENTEfO 4. AU. INSIDE TURNING RADII SHALL BE 2B MINRJUM THROUGHOUT. S. THE FINAL LOCATKINANO DESIGN OF THE ACCESS FASEMENTTHROUGH LOTG 1, 2, ANO 3 BETWEEN SIIMNER BOULEVARD AND TRIANGLE TONM BOULEVARD TO BE DETERMINED BASED UPON 7HE SITE PIAN SUBMITTALTO LOTS 1, 2. AND S. PROJECT N0: CY502 SHEET NO 0 40 GO 160 GATE: tDATEt /- /'~ DRANN: GMM ~ 2 CF~CKED: TRH ~/ SLATE: P= BO' SHEET OF I FUNRE WATERLME ~._ J~ ', ~ ' ~~ =LT ______ ~BY QTHEli~ ~•- NQN W tpNN NNOO 0 n XZmm O m~ m~mm Oww wawa !r H- w Z ~. W ,W^ V W J J VN W W a n. O fH V . m - W F~ Z NQ '„ J ~a Q ~ cZ ~ L..O J Q W J a PROGRESS ENERGY + '~~ PIN x1726776967 OB 2106, PG. 586 ZONED - RR ~~~~(~VACANT) 1 N 1 `, ~~' ;'T,ON a~D _. "" ~ ~~ v i=16652' --`` -,,_ ~, ~' ~\ ~ ~~~ ~t~ Z` ~_ _ "i ~ ~ ~ ~ ~d - T ==&4.48`- - `, ,~. \ ~ d BROUGHTON & BAI EY ~P ~ `~ - - R 400.0' `~~ '~ 1' °` ~~~ DB 4056, PG 93~ o ~, ~ r __ ~ . ~ , _ , = ~ ~ -- _ ~ ~ 1 ~fo ~2~ ~ v! ~~ ` ~ ~ Q,4P 6LTJ ~ N j ~ r _ ~ ~ ~ ~ ~. ,~~ ~ _ ~'" ~ y0 LecerrD ~ ~ ' ~ ~ - 9ROU HTON PROPERTIES ~ ~ ~? `~ ~ : ~ _- ~~~~ ~ ~ ~ NT 2i~i, SILT FExcE Z _.~~ ~~ ~~ - 3273 PG 235 ` ~ a' ~ T~ ' ~. ~ a ~~o< ~~~ ~~ ii PROPOSED WATER UNE / V'~ ~1 '.~ ~ \~ `~YY1 ^N~`, ~`~•~~ a a N NNp~ o0mm XZ~W mtgmW m OwWx a~w FLL V Z I.fi W W Z W v °5 Viz-.-_ '>, , z ~ R ~ ,DO' ~ J,1Zt~ ~ ~.. J' DC PROP08EDVAlVE ~ ~ ~-- ~ ~~ ~\ • ~+ '---~ `~ ~ ~.. ~ ~ ~~ ~` Brzmnaa • ~~ .,.. l .~if. / - p \ ~ aaae~.w~~ ca FUTURE VUVE yy.. / , ~ yt' ~l, - ~7~~ '^~ 2.' ~. ~ ~~ x ~ PROPOSeDFlREHYDwwr(FM ___. _ C7 ` ,QX~~ ~~~ ~m t~~ '~, j'_~~ ~ W PROPOSED BLOW OFF ASSEMBLY ~~ /~ /, J rt ~. --_ _ ` ~ y -$$ PROPOSED SEWERLNE ._ _ _ ~ \ ~ "^ /'~` ~ ~`~ '/ / ~ t ~ ` _ W ~.. .' _ PROPOSED SS MH ~- - J ~~~ ~ i i ~ y - ~ ~ w ~, t - Exlanxcss~.55' - `_ ,-- `- _.- - = 339. i I ~.~~ ~. ~ ~ ~ ~ N89°20'18'W - ., µ_l_ f ~ `' 33 3 N V ,: - ... ur"~"JL',_ vri/"vr~ai?"~,*rv+~uri:- ~ r.rrL- ~~' .v>-~t/' -v ~~. Q a,~l~•~, ~ _--E .. ~„ rU' _ t CROSS ACCESS,AGR ENT TOACCOMMODATE ACCESS ~ -' ~ PO r'~.E ,~ , ~~' ~ ~ ~._ ~ ~, ~ rE~aaurcv~~AV~,vn~a 2 W .~ WITH DEVELOPfuIENT OF ITE PLANS FOR LOTS 12 813. ~ r , ~ ~ ~ ~i ~ ~, ~ r , j , . ~ ~ ~ - ~` ~ '~ ~ ~ WAKE C~~OA~28 PG ~(IUGATION PRELf~IINARY PLANS - ~ W I A.P. SOUTHFO/~ST5B9Q~R~~ 83 PARTNERS ~ C ~r NOT FOR CONSTRUCTION ~ D ~ ~ ~ a _ _ __ __ _~ _ _ ______,___ ____.___ R,W R,x --, ~ - _ - ~ ® © fZ - _., . - -. ___ "-.. -._ _ _. __ _ .__ ~ _. .. __. -__. - --__. _- I/9'F1. ® CL O G I/4`FT. I 2`A 1AP - _ _ -_ _- SLOPE --~ I/1'/Fi. _ ® /1'/Fi z: x __ -. : BEGIN Q7A0'E_. ..... _ - _ - J"~ .~... ~ . ..., :Cf :V~' ~; ":',; r;a...6. sIOE1mLC ~~ T 2s~ ~...: - --.. STA SH2O0 - - - -. _.. , .. '. _. SEE NOtE 2 ~ BRIINV0115 Cd1GHETF /n . -. - :. _ _-_ __- :. _._ - ---. I v _ ._,._._ _ ~ _..... _ _ __. _._ _ -. -. - - - TYPICAL SECTION © AGGREGATE BASE cowsE -- _ ® couvaciEB suB cruBE ~ O -___ _ - RESIDENTIAL STREETS ~ ~ - E~ '. -. - R/N A B C D E C _ qq ~ Po - ~. 60' 41' 20.5 I8.0' 2 I/2' 12 8' ABC 9.5' ~ m Vd JS apt ~ lYYN7 ssMtf? 4'.qA Yd _•. J5 pas - _ _. __-. _ _ _.. 7 .__~-__.- ----- --- ._ -°.---._,._ _ sraT7,ga61 - _- - ,- ~ _ _ _,_..,M...Y... ~. ~ - __ . -- ~ .... - EX WYT fxQS STA K+7&P.T J~^ TOP~.9o5.53' .~ ..._ _ _. __ __ _ ~ _ __. _ INV 0117=3G7 ~' -. II /u-12SSy, STA 15+12&5 ~''~~ DEPTH 4.&' (+1LV552X -. -. •. I - I I _ . ayy9 ; _ I lr~snAe'ug~-v ~_ ~ p~ - v+7un I I I l l+s~so ~= r+wsszz - " - >nx - _ - EL - ze>i~ s it _ vc-ate I _ .~_ _ - - ___Ir vcP- __ __ _- __1za'P rr/~~_ -va ~JS ~ _- -- _ _ _.. 2a(F - 9tXP v~0.Ni0JY. - _.- _ _ ,quh ._._____~,-..._.~.__..._..3D - - - - _------ - _ ~__~. - _. ___ - ----- W W ____ IXISTING SSMHI ... 6'RCP -. - _ -_ _. fAF PIMNf.. - -. - - ~ 3 ExlsnNCSSMHI srAt5rora7 IN/ ~zYlx STA22~60 ' 3 ~ J STA i3~13 65 _ NP 306.09' - .. II 0 -. _ EL - !'9.TDJ~ ~ I ~ ~ TOG=70945 _ _- _ _- PFOPINVXJ=2997P __ __ _/ _~ I MVW.29835' __ _- INV OUT=299.57 _. --. -.-.. _ o ~~ a' Z _ _ _ _ _ _. ___ __ :- _. -- 2B _ _- - - - ~ , --- -- - - __ _ - - - - _ . _. 24 ACP SfA ZJ+7721 - u• U ~' .-~.~ I Y Q Q J _ ___. _ _ ._.. _ _ - _ ~~zD__' 0 a __ _ _. __ _ ____ _ __ PROJECT NO: CY502 SHEET _ DATE: SDATES r_; .' ;,-. - ; . _ _ . . _ _: ~. DRAWN: JrD PP-1 -- I _ -. ._.. -. CHECID:D: TRH _ _ . __. ___ ._.._.-__. _ _1_.____.._ . ._....... _ _ _ __ _ _ s I+00 14+DO 15+00 16+00 - 17+00 IB+DO 19+D0 ,-- ~ ~-20+00 - _ 21+00 - - - 22+DO 23+00 ~~ ~ _ - 24+00- scALE, 1'°+D' SHEET of // / / _ '~~ r PROJ. REFERENCE N0. _ ~ OAK FOREST DRIVE X-6 _ -- 75 7C 65 60 55 50 ~5 40 _ __ _ - 35 3~ 25 _ 10 15 1L _ _ - _ 5_ O y 10 15 20 25 30 _ _ 35 4C 45 SC 55 50 65 70 ;5 -- - _ _ - t _ - _ - ~ ~_ _- _ _- __. __ ___ _. _ _ _ _ _ __ . _ _ ~ _ ~ - _ . a_ ,~ o ~ S _ - _ -_ w° i & ssw ~ _ _ - - -- -- -° _ _ _ _ -- _. _ ~ - -- - - __ _ .~ ._~ n -~ .~q -----~ .__~. _- --. __.. _.. .. _.. ._ _-~_ -_ _ .__- - _ _._ __ ._. :._ --.__:- _. _ _- .. __ -. --- _ 28838. _. _ _ -. __-.--. _ - - - - - - _.__ _ _-_ __._.-__ __________ ____. _ -- ----- - - - - . _ _: ~ --- -- - 24+50.00 _ _ . - _ _ . _2 - ----___. ... _ ._ _ -__~m~-- ---_-- _--- - _.,~_ _.._ __~_ __ - - - - - - --._~_ _ __ _ _ _ - _ _ _ _ __ __ _ _.. _ - 3a: _ ~ _ __ _ - _ _ ~ _ v ~ $ ~ ~ - °; _ ~ _ _ ssw-.a _ _ _ _ _ 29. 8 - _ _ - - $ - z, -- _ __. _~ _. - - _- _. 29~ -- -1_ .~~ - __ _ - 5-- ~ _, ~ __ - _- ~ _ ~_ ~_~.:_ ----- ------ ---- - - 2B --- - -- --_._ ~ __ . _~ _~ .~ _ _ _ _ __ _~ - 283.39 24+00 00.. ~ _ _.__ -,_ _ ~_-- - ----__ __ __ - -- . _.._._.~ .-_-_ _ ___ -' - - . 30 - ---- _ _:_ _ . _ __ _ _._ '__. _30 _ ~ __ - - ~ ~ ~ o, - ---- - -.___T_ ~ .:_ _ ._ - ---- - ~_ _ - - - -- - - - ~ / _ -- - ~- - °m ° s sw, /~ - _ 8 ' & A z ~ ~~ -- - - - - -- _ _ 29 / a _ ___ __ -_ ~~ rn -_ - _ _ - - ~z~wn a ~ ~ x - . _ ~ _ . _ N x _~_ ~ ~ ' ,~ ~ a ~ _ - ~ ~ "~ n ~ _ ~ 3 -- 7_ - - - _- _-_ ~_~ - _- w ~ .-~ ._- - .: ~ ~ - - _ _ _ - 2b r °' ~ o ` __. . .__-_. _ -.. _- - _. _ _. _. _ .. .~~+50.00 --- - - . _ _ m M1 °° OAK- - Q .~ _ ~ 75 70 65 60 55 50 45 40 ~,~ 35 ,__ 30 25 __20 15 10 <i 0__ a 10 15 20 25 30 35 40 45 50 55 60 65 70 75