Loading...
HomeMy WebLinkAboutPages from OutfallAnalysis_HYD_R5759.pdfDRAINAGE OUTFALL ANALYSIS #7 Location: Channel located 32' downstream of STIR. 1352 at proposed right of way. -L- 139+91 (o/s - 153' RT) Project: R-5759 County: Wilkes Pre -Construction Drainage Area Hydraulic Method: Total Drainage Area = Total Drainage Area within Proposed NCDOT ROW Project Limits = Weighted C- Value= Time of concentration = Rational (ac.) (so.) (unitless) (min.) 102.63 14.07 0.43 30 Sub -Areas C-Value DA (acres) Impervious within NCDOT ROW 0.9 4.19 Grass within NCDOT ROW 0.3 9.89 Woodland outside NCDOT ROW 0.1 Business outside NCDOT ROM 0.6 36.23 Residential outside NCDOT ROW 0.3 52.32 TOTAL 102.63 Rainfall Intensities 12= 2.35 in/hr Is= 2.88 in/hr Igo= 3.28 in/hr Peak Discharges Qz= 103.8 cfs QI- 127.2 cfs Q1, 144.91 cfs )ESIGN NOTES: Bigger drainage area in proposed condition due to more drainage area is being diverted to Str. 1330. assumption: Payment removal along Y30 will be seeded. Date: 12/10/2021 Post -Construction Drainage Area Hydraulic Method: Total Drainage Area = Total Drainage Area within Proposed NCDOT ROW Project Limits = Weighted C- Value= Time of concentration = Analysis by: Analysis checked by: Rational 103.39 (ac.) 14.71 (ac.) 0.45 (unitless) 30 (min.) MYC ATH Sub -Areas C-Value DA (acres) Impervious within NCDOT ROW 0.9 7.80 Grass within NCDOT ROW 0.3 6.91 Woodland outside NCDOT ROW 0.1 Business outside NCDOT ROW 0.6 36.23 Residential outside NCDOT ROW 0.3 52.44 TOTAL 103.39 Rainfall Intensities 1z= 2.35 in/hr Is= 2.88 in/hr Ilo= 3.28 in/hr Peak Discharges Qs Qs= = Qio= Discharge Comparison Table Q Difference (cfs) M 2-Year 5.63 5.43% 5-Year 6.901 5.43% 10-Year 7.861 5.43% Pre -Construction Drainage Outlet Channel Description Post -Construction Drainage Outlet Channel Description Base Width 9 (ft.) Base Width 9 (ft.) Sideslope (LT) 1 (H:V=1) Sideslope (LT) 1 (H:V=1) Sideslope (RT) 1 (H:V=1) Sideslope (RT) 1 (H:V=1) Channel Slope 0.029 (ft./ft.) Channel Slope 0.029 (ft./ft.) Manning's n-Value 0.045 (unitless) Manning's n-Value 0.045 (unitless) Pre -Construction Outlet Channel Hydraulics Post -Construction Outlet Channel Hydraulics Outlet Channel Hydraulics Comparison Table Depth Velocity Shear Stress (ft) (fps) (psf) 2-Year 1.54 9.06 2.79 5-Year 1.73 9.55 3.13 10-Year 1.87 9.87 3.38 SUMMARY AND RECOMMENDATIONS: No actions required Depth Velocity Shear Stress (ft) (fps) (psf) 2-Year 1.59 9.21 2.88 5-Year 1.79 9.70 3.24 10-Year 1.93 10.03 3.49 109.4 cfs 134.1 cfs 152.7 cfs Depth Depth Velocity Velocity Shear Stress Shear Stress (ft) (fps) (psf) 2-Year 0.05 3.25% 0.15 1.66% 0.09 3.25% 5-Year 0.06 3.47% 0.15 1.57% 0.11 3.47% 10-Year 0.06 3.21% 0.16 1.62% 0.11 3.21% y =� IN c Looking at downstream/of existing • 1 a5 i h I 1 c i