HomeMy WebLinkAboutWQ0044935_Application (FTSE)_20240305NC Dept of Environmental Quality State of North Carolina
Feb 16 2024 Department of Environmental Quality
11WR
Raleigh Regional Office Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 10-23 & SUPPORTING DOCUMENTATION
Application Number:
(to be completed by DWR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Town of Pittsboro (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership
❑ Federal ❑ State/County ® Municipal
3. Signature authority's name: Kent Jackson. PE per 15A NCAC 02T .0106(b)
Title: Assistand Town Manager/Engineering Director
4. Applicant's mailing address: PO Box 759
City: Town of Pittsboro State: NC Zip: 27312-
5. Applicant's contact information:
Phone number: (919) 542-1519 Email Address: kiackson(c),pittsborone.eov
II. PROJECT INFORMATION:
❑ Privately -Owned Public Utility
❑ Other
1. Project name: Whispering Meadows Subdivision, Phase 1II
2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project
If a modification, provide the existing permit number: WQ0043121 and issued date: March 18, 2022.
For modifications, also attach a detailed narrative description as described in Item G of the checklist.
If new construction, but part of a master plan, provide the existing permit number: W00036103
3. County where project is located: Chatham
35.708952 D.Degree-79.18n541D.D
4. Approximate Coordinates (Decimal Degrees): Latitude Longitude:
5. Parcel ID (if applicable): 7712&7713 (or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Samir Bahho, PE License Number: 16941
Firm: Civil and Structural Engineering Services, License # P-0537
Mailing address: 4612 Kaplan Drive.
City: Raleigh State: NC Zip: 27606-
Phone number: (919) 851-1642 Email Address: ba.casespllc(d),gmail.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
1. Facility Name: Town of Pittsboro wastewater Treatment Facility Permit Number: NCO020354
Owner Name: Town of Pittsboro
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. Permit Number(s): WQ 0043121 (phase II , Whispering Meadows sewer permit
2. Downstream (Receiving) Sewer Information: 8" inch M Gravity ❑ Force Main
3. System Wide Collection System Permit Number(s) (if applicable): WQCS
Owner Name(s):
FORM: FTA 10-23 Page 1 of 5
VI. GENERAL REQUIREMENTS
I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes []No ®N/A
2. If the Applicant is a Developer of lots to be sold, has a Develooer's_Csiecanonal Agreement (FORM: DEVI been attached?
❑ Yes ❑ No ®N/A
3. If the Applicant is a Home/PropertyOwners' Association, has an HOA/POA Operational Agreement � ORM: HOAi and
supplementary documentation as required by 15A NCAC 02T.0115(c) been attached?
❑ Yes ❑ No ®N/A
4. Origin of wastewater: (check all that apply):
® Residential (Individually Owned) ❑ Retail (stores, centers, malls) ❑ Car Wash
❑ Residential (Leased) ❑ Retail with food preparation/service ❑ Hotel and/or Motels
❑ School / preschool I day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool/Clubhouse
❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment)
5. Nature of wastewater: 1 RO % Domestic % Commercial _ % Industrial (See 15A NCAC 02T .0103(20))
If Industrial, is there a Pretreatment Program in effect? ❑ Yes No
6. Hasa flow reduction been approved under,15A NCAC 02T ,0114(f)? ®Yes ❑ No
➢ If yes provide a copy of flow reduction approval letter with this application
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(o)
Daily Design Flow''"
No. of Units
Flow
Phase III
gal/
GPD
3 bedroom units
75 gal/day/room
6 units
135o GPD
4 bedroom units
75 gallday/room
4 units
1200 GPD
Total
gay
2250 GPD
gal/
GPD
gay
GPD
Total
2550 GPD
a See .15A NC-A.0 1Q2 I .()I 14(h'), �d ), (ej(1).and e 2 for caveats to wastewater design flow rates (i.e. proposed unknown
non-residential development uses; public access facilities located near high public use areas; and residential property
located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4).
b Per 15A NCAC 02T A114(c), design flow rates for establishments not identified {in table 15A NCAC-02'1'.0 1141 shall
be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 2550GPD (per 15A NCAC 02T. 0114 and G.S. 143-215.1)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, please indicate why:
❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
❑ Flow has already been allocated in Permit Number: Issuance Date:
❑ Rehabilitation or replacement of existing sewers with no new flow expected
® Other (Fxplain): PhAse I & Phme II of tha a me cihdivinion were nermi#ed - Perwit0 W00016101 and W-00043121
FORM: FTA 10-23 Page 2 of 5
VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - OZT.13415 & MDC (Gravity Sewersl:
1. Summarize gravity sewer to be permitted:
Size (inches) Length (feet) Material
8 250 D
Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
A Section III contains information related to minimum slopes for gravity sewer(s)
A Oversizing tines to meet minimum slope requirements is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — qn .Q305 & MDC fFumo Stu t!uP*!Voree Mains :
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: ° Longitude: - °
3. Total number of pumps at the pump station:
3. Design flow of the pump station: millions gallons per day (firm capacity)
A This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational pomt(s) per pump(s): gallons per minute (GPM) at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
Size (inches) Length (feet) Material
If any portion of the force main is less than 4-inches in diameter, please identify the method of solids reduction per
MDCPSFM Section 2.01 C.1.b. ❑ Grinder Pump ❑ Mechanical Bar Screen ❑ Other (please specify)
6. Power reliability in accordance with 15A_NC'AC02'1 .0305 fhX 11:
❑ Standby power source or ❑ Standby pump
Must have automatic activation and telemetry- ISA NCAC 02T 0305(h)(1)(B):
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C):
❑ Portable power source with manual activation, quick -connection receptacle and telemetry -
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry:
A Include documentation that the portable source is owned or contracted by the applicant and is compatible with the
station.
FORM: FTA 10-23 Page 3 of 5
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations'
storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be
provided as part of this permit application in the case of a multiple station power outage.
FORM: FTA 10-23 Page 4 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)):
1. Does the project comply with all separations/alternatives found in 1 SA NCAC 02T .0305 i) & 60-, ® Yes [-]No
I SA NCAC 02T.0305(fl contains minimum separations that shall be provided for sewer systems:
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below (vertical)
18 inches
2Water mains (vertical - water over sewer preferred, including in benched trenches)
18 inches
2Water mains (horizontal)
10 feet
Reclaimed water lines (vertical - reclaimed over sewer)
18 inches
Reclaimed water lines (horizontal - reclaimed over sewer)
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class Il impounded reservoirs used as a source of drinking water, and associated wetlands.
100 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water (or tide elevation) and wetlands associated with these waters (see item IX.2)
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches, as well as wetlands associated with these waters or classified as WL.
10 feet
Any building foundation (horizontal)
5 feet
Any basement (horizontal)
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
➢ If noncompliance with 02T,030_5tQ orAZ), see Section X.1 of this application
*15A NCAC 02T.0305 0 contains alternatives where separations in 02T.0305(fj cannot be achieved. Please check "yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
2. Does this project comply with the minimum separation requirements for water mains? ❑ Yes ❑ No 10 MA
➢ If no, please refer to 1 SA NCAC 18CA906(f) for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule.
Does the project comply with separation requirements for wetlands? ❑ Yes ❑ No ® N/A
➢ Please provide supplementary information identifying the areas of non-conformance.
➢ Seethe Division's draft separation requirements for situations where separation cannot be met.
➢ No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? ® Yes Basin nam&C a Fear ® No
If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No
➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ❑ Yes ® No
or 401 Water Quality Certifications?
➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 01T.0105tcii6) (additional permits/certifications)? ® Yes ❑ No
Per 15A NCAC .O?T.0105i c li 6), directly related environmental permits or certification applications must be being prepared,
have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion
and sedimentation control plans, stormwater management plans, etc.).
Does this project include any sewer collection lines that are deemed "high -priority?" ❑ Yes ® No
Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters,
siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interference/conflict boxes require a variance approval.
➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and
inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit.
FORM: FTA 10-23 Page 5 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump. Stations
and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
® Yes ❑ No
If no, for projects requiring a single variance, complete and submit the Variance/Altemative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Aonroval of the request will be issued
concurrently with the approval of the permit, and projects requiring a variance approval may be subject to longer
review times For projects requiring two or more variances or where the variance is determined by the Division to be
a significant portion of the project, the full technical review is required.
2. Professional Engineer's Certification:
1, Samlr Bahho, PE , attest that this application for Whisperinq Meadows Subd. Phase III
(Professional Engineer's name from Application Item [it. 1.) (Project Name from Application Item I1.1)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
Minimum Design Criteria for Gravity Sewers (latest _ vers�, and the Minimum Design Criteria for the Fast -Track
Permitting, of Pump .stations and Force Mains latest version). Although other professionals may have developed certain
portions of this submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this
material and have judged it to be consistent with the proposed design.
NOTE - In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the
application information, including failure to disclose any design non-compliance with the applicable Rules and design
criteria, may subject the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701)
North Carolina Professional Engineer's seal, signature, and date:
October 02, 2023
3. Applicant's Certification per ISA NCAC 02T .0106(b):
................... ._ ............
.0_:k R +6_
i
1, Kent Jackson, PE , attest that this application for Whispering Meadows Ph. III
,,Signature Authority Name from Application Item 1.3.) (Project Name from Application Item I1.1)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any
discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the
Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this
application package are not completed and that if all required supporting information and attachments are not included, this
application package will be returned to me as incomplete.
NOTE In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
S ignature:
Date: 11 /15/23
FORM: FTA 10-23 Page 6 of 5
NC Dept of Environmental Quality
Mar 5 2024
Raleigh Regional Office
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Dhrislon of Water Resources Flow Tracking for Sewer Extension Applications
(FTSE 10-23)
Entity Requesting Allocation
Town of Pittsboro
Project Name for which flow is being requested: Whispering Meadows Subdv. Phase III
More than one FTSE may he required for a single project if 'the owner of 'the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Town Of Pittsboro WWTP
b. WWTP Facility Permit #: NCO020354
All flows are in MGD
c. WWTP facility's permitted flow
0.75
d. Estimated obligated flow not yet tributary to the WWTP
.1974
e. WWTP facility's actual avg. flow
.4838
f Total flow for this specific request
.00255
g. Total actual and obligated flows to the facility
.68375
h. Percent of permitted flow used
91.16
11. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B)
(C) (D)=(B+C) (E)=(A-D)
Design
Obligated,
Pump Pump Average Approx.
Not Yet Total Current
Station Station Firm Daily Flow** Current
Tributary Flow Plus
(Name or Permit Capacity, * (Firm / p f), Avg. Daily
Daily Flow, Obligated Available
Number) No. MGD MGD Flow, MGD
MGD Flow Capacity***
* The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be
achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not
less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located between the
project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): Town of Pittsboro WWTP
Downstream Permit Number: NCO020354
Page 1 of 8
FTSE 10-23
III. Certification Statement:
I Kent Jackson, PE certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and 11 plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
W,
03/05/2024
Signing Official Signature Date
Assitant Town Manager/Engineering Director
Title of Signing Official
Page 2 of 8
FTSE 10-23
v
�
a
t�c�'•t iiti.
! A
d
,5
o eR
f
b
1/J
a ::
Y
•
11
rt �,1 t�5
_N
d
0
CD cu
N 0-
C d _N
d O
O 0-
a)
0-v w
n) uu
pa)a) ` C d
V m J CD
N
7
H O
• O
J U
_ C
~ O
tgo
Us
o
(DN
Cy
T T
U c c
Z
7 7
O
O O
u u
m
J E E
a)
m m
U L L
U ]UU
a
-Tit
w'—
Lght
h , •IL
•• ,rP
.190
01
fib' 715 \t '�N `.. :. Ho•�nr. ,`� �ti, �d
tdF J -378
Lrl
Co
�� t �T:S • *: rti
`• _ Substat�o� -
11M395
7-11
NG ,of . livirorimet.o{ It
a ,
..
Raleigh R , . Office
. f '
i5 J '
� j
U
z
y
4
ii 2
� tr
p i
c.
N`N
p
r �r
+� w
c
iU E
tl
I�
P
e:
x
m
c
�UU
m
M
v
z m is a
U1000
CIVIL AND STRUCTURAL ENGINEERING SERVICES, PLLC
SAMIR W. BAHHO, P.E.
Date: October 10, 2023
Revised February 08, 2024
and February 15, 2024
Whispering Meadow Phase 3
Fast Track Sewer Extension Application
Project Narrative Report
The request is for the approval to install 250 of 8" D) sewer line Providing sewer flow for
phase 3 of Whispering Meadows Subdivision to serve 10 lots of the subdivision. The subdivision
sewer capacity was requested in 3 phases. Phase 1 and phase 2 were already permitted. This
request is applying for permit to construct phase 3. The sewer demand was recalculated by
reducing capacity to 75 g/day/room t. The requested capacity for this phase (phase 3) is 2,550
GPD. See
Town of Pittsboro approved the subdivision for the sewer to be phased in 3 phases.
• Phase 1 of the subdivision sewer line was permitted, installed and accepted (Permit
Number WQ0036104.). Phase I is serving 12 lots. All lots in phase 1 have houses
completed and served with sewer.
• Phase 2 of the subdivision sewer line was permitted (Permit #WQ0043121 dated March
18, 2022. Construction of Sewer. Phase 11 comprises of 11 lots
• Phase I and Phase 11 permit request for amendment to deduct unutilized
allocation are being prepared to be submitted to DEQ
• This application is for phase 3.
• Construction of phase 3 is pending permit approval. Construction is expected to start
March 01, 2024 and completion of sewer line installation April 30, 2024.
Thank you. For any further questions, Please call or email. Telephone number is (919) 621-
0628. Email address is ba.casespllc@gmail.com
1
Samir W. Bahho, PE
Civil and Structural Engineering Services
Civil and Structural Engineering Services 14612 Kaplan Drive, Raleigh, NC 27606
Telephone Number (919) 851-1642. Email address: ba.casespllc@gmail.com
Town of Pittsboro, North Carolina
Cindy Perry, Mayor
Pamela Baldwin, Mayor pro tem
John Bonitz, Commissioner
John (Jay) Farretl, Commissioner
Kyle Shipp, Commissioner
James Vose. Commissioner
September 8, 2023
Mr. Rick Murray
Windstar Properties, LLC
PO Box 1508
Pittsboro, NC 27315
Re: Sewer Allocation Request Approval - Whispering Meadows, Phase 3
Dear Mr. Murray,
Jonathan Franklin, Town Manager
Paul Messick, Town Attorney
Carrie Bailey, Town Clerk
635 East Street I PO Box 759
Pittsboro, North Carolina, 27312
The Town of Pittsboro has approved sewer allocation in the amount of 285 gallons per day (GPD) for Phase 3, which
includes ten (10) single family lots. Pursuant to G.S. 143-215.1 (f3) the required allocation of 75 GPD/bedroom shall
apply to both Phase 2 and Phase 3, which reduces the allocation required for Phase 2 from 4,440 GPD to 2,775 GPD,
which has been permitted but not tributary. Additionally, the total allocation required for Phase 3 has been reduced
from 4,080 GPD to 2,550 GPD. Since 4,440 GPD was allocated to Phase 2 on September 3, 2021, with 600 GPD unutilized
allocation from Phase 1, the total allocation required to complete Phase 2 & 3 is (2,775 GPD + 2,550 GPD) - 4,440 GPD -
600 GPD = 285 GPD.
Please contact the Town of Pittsboro Engineering Department should you have questions.
Sincerely,
7--- �
Jonathan Franklin
Town Manager
(919) 542-4621 wvwv.pittsboronc.gov fb.com/pittsboronc.gov
NC Dept of Env=.ror-menuds Q,oal;ty
F B 1 3 "%[1,' 4
AND STRUCTURAL Raleigh Regional Office
CIVIL AND STRUCTURAL ENGINEERING SERVICES, PLLC
SAMIR W. BAHH4, P.E.
Date: February 10, 2024
Elaine Wild
Environmental Engineer
Division of Water Resources -Raleigh Regional Office
Reference: Revisions to request for permit per your letter of January 04, 2024
Attached are corrected documents with the comments per your letter of January 4, 2024 and as
follows:
1. The project coordinates were corrected and provided in Section 11.4 of the attached FTA
Lat: 37.708056 and Long:-79.181806
2. Section IXA of the FTA was updated to show: Cape Fear River Basin
3. a)The flow calculations were revised to show the reduced flow for phase III to be:2550
gallons/day.
b) The applicant will follow immediately to prepare permit amendment requests to amend Phase
I flow, permit (WQ0036103) and Phase 2 flow, permit (WQ0043121) to reflect the reduced
now.
4. 8.5x 11 color copy of USGS Topographic map, colored aerial map as well as County Tax
Map are attached.
5.Section VI.7 of the FTA was revised to show 10 units (6 3-bedroom and 4 4-bedroom units).
We hope the information presented will be satisfactory for consideration of requested capacity. Please
call me or email me for any additional questions or information. My telephone number is (919) 621.
0628. My email address is ba.casespllc@gmail.com
Sincerely,
Samir W. Bahho, PE
Business license (P-0537)
Civil and Structural Engineering Services 14612 Kaplan Drive, Raleigh, NC 27606
Telephone Number (919) 851-1642. Email address: ba.casesplic@gmail.com
CIVIL AND STRUCTURAL ENGINEERING SERVICES, PLLC
SAMIR W. BAHHO, P.E.
Date: October 10, 2023
Department of Environmental Quality
Division crWater Resources
Reference: Whispering Meadow Ph�ise 11I �t,�a��,�;�Ida(?-1
Fast Track Sewer Extension Application
Cover letter
The Fast Track Sewer Application package includes the following:
1. Check $480.00 application fees
2. 2 sets of Fast Track sewer extension application
3. 2 sets of sewer plans
4. Included is a letter of approval for phase 11 of the project for better tracking the project
5. USGS 8.5x11 sheet showing project location with Town of Pittsboro plan showing sewer
systems in the area
6. Attached is a letter issued by the Town of Pittsboro with approval of allocations.
7. Narrative Report
Thank you. For any further question, Please call me or email me. My telephone number is (919)
621-0628. My email address is ba.casespllc@gmail.com
Sincerely,
Samir W. Bahho, PE
Civil and Structural Engineering Services
Civil and Structural Engineering Services 14612 Kaplan Drive, Raleigh, NC 27606
Telephone Number (919) 851-1642. Email address: ba.casespllc@gmail.com
1
DocuSign Envelope ID. 507988A8-CF52-4CAF-AAEO-OB7BO770A626
ROY COOPER
Govcmor
ELIZABETH S. BISER
Secretary
RICHARD E. ROGERS, JR.
Dlrectar
Kent Jackson, Town Manager
Town of Pittsboro
P.O. Box 759
Pittsboro, NC 27312
Subject: Permit No. WQ0043121
Town of Pittsboro
NORTH CAROLINA
Environmental Quality
March 18, 2022
NC gent of cnviront .<<.rtal Quality
Raleilgh Rclelonal O;ficc
Whispering Meadows Subdivision, Phase II
Wastewater Collection System Extension Permit
Chatham County
Dear Permittee:
In accordance with your application received January 4, 2022, and additional information received on
March 18, 2022 we are forwarding herewith Permit No. WQ0043121 dated March 18, 2022, to the Town
of Pittsboro (Permittee) for the construction and operation upon certification of the subject wastewater
collection system extension. This permit shall be effective from the date of issuance until rescinded and
shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered
a part of this permit and is therefore incorporated therein by reference.
Please pay particular attention to the following conditions contained within this permit:
Condition 11.1: This permit shall not be automatically transferable; a request must be made and
approved.
Condition 11.4: Requires that the wastewater collection facilities be properly operated and maintained
in accordance with 15A NCAC 02T .0403 or any individual system -wide collection system
permit issued to the Permittee.
Condition 11.7: Upon completion of construction and prior tooperation of these permitted facilities, the
completed Engineering Certification form with checklist attached to this permit shall be
submitted with the required supporting documents to the address provided on the form.
Permit modifications are required for any changes resulting in non-compliance with
this permit, regulations, or the Minimum Design Criteria. [15A NCAC 02T.0116]
It shall be responsibility of the Permittee to ensure that the as -constructed project meets the appropriate
design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina
General Statute §143-215.6A through §143-215.6C, construction of additional or replacement
wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to
the licensing board.
DocuSign Envelope lU 5079WAS CF52-4CAF-AAEO-087130770A626
Town of Pittsboro
Permit No. WQ0043121
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within 30 days following receipt of this permit. This
request must be in the form of a written petition, conforming to Chapter 150B of North Carolina General
Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC
27699-6714. Unless such demands are made, this permit shall be final and binding.
If you need additional information concerning this matter, please contact Jason Robinson via e-mail at
lason.T.Robinson@ncdenr.gov.
Sincerely,
CD�oc'u`3t-gaeed W
sc at. W'A•941.
BCDA9D825NA46D
for Richard E. Rogers, Jr.
Director, Division of Water Resources
by Scott Vinson, Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office
Division of Water Resources, NCDEQ
cc: Samir Bahho, PE: ba.casesollc@email.com
rick0aacontracting.com
Raleigh Regional Office Files
DWR Laserfiche
Chatham County Health Department
Page 2 of 9
DocuSign Envelope ID: 507988A8-CF52-4CAF-AAEO-OB7BO770A626
NORTH CAROLINA
EnWronmenta! Quality
WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the
Town of Pittsboro
Chatham County
for the construction and operation of approximately 700 linear feet of 8-inch gravity sewer; to serve four
4-bedroom and seven 3-bedroom homes as part of the Whispering Meadows Subdivision, Phase II project,
and the discharge of 4,440 gallons per day of collected domestic wastewater into the Town of Pittsboro's
sewerage system, pursuant to the application received January 4, 2022, and additional information
received on March 18, 2022 and in conformity with 15A NCAC 02T; the Division's Gravity Sewer Minimum
Design Criteria adopted February 12, 1996 and updated in March 2008, as applicable; the Division's
Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1,
2000 as applicable; and other supporting data subsequently filed and approved by the Department of
Environmental Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the specified
conditions and limitations contained therein.
DxuSiyned by:
E
t Uk4w
BCDA9D8251)4A46D
for Richard E. Rogers, Jr
Director, Division of Water Resources
By Authority of The Environmental Management Commission
Permit Number: WQ0043121
Permit Issued: March 18, 2022
Page 3 of 9
From:
Samir Bahho
To:
Wild, Elaine
Cc:
Rick A. Murrav; Kent Jackson
Subject:
Re: FW: [External] Re: Meadows Subdivision, Phases II & Phase III - Fast Track Sewer Application
Date:
Tuesday, March 5, 2024 11:18:49 AM
Attachments:
image005.pnna
imaae001.ona
imaae002.ona
FTSE 10-23 O.odf
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the
Report Message button located on your Outlook menu bar on the Home tab.
Elaine,
Attached the FTSE 10/23 with the Town of Pittsboro as the Entity Requesting added to it.
Please let me know if you need more info. Thanks, Samir
Samir Bahho, PE
Civil and Structural Engineering Services,
4612 Kaplan Drive, Raleigh, NC 27606
Office Phone No.: 919-851-1642
Mobile Phone No.: 919-621-0628
On Tue, Mar 5, 2024 at 9:05 AM Samir Bahho <ba.cases l�lc(&)gmail.com> wrote:
Elain,
Thank you and Attached is the FTSE 10/23 form the owner of the Facility that you requested
hoping it satisfies your latest request concerning Whispering Meadows Subd. Sewer Phase
III. Thanks, Samir
Samir Bahho, PE
Civil and Structural Engineering Services,
4612 Kaplan Drive, Raleigh, NC 27606
Office Phone No.: 919-851-1642
Mobile Phone No.: 919-621-0628
On Mon, Feb 26, 2024 at 2:41 PM Wild, Elaine <elaine.wild(&,deq.nc.gov> wrote:
Hi Samir,
I understand the confusion. The form provided on 2/16/24 is the "Fast Track Sewer System
Extension Application" (FTA 10-23). The document that I need is the "Flow Tracking for Sewer
Extension Application" (FTSE 10-23). The latter is a signed document from the Pittsboro WWTP
indicating that they are allocating this specific project's proposed flow. I provided a link to the
document in my email earlier this morning.
DWR
Divh0on uF l4Awr Resources
State of North Carolina
Department of Environmental Quality
Division of WSIter Resources
1 t41 1 R1 < ('K SEWER SYSTEM EXTKNSION APPLICATION
F 7`R 10-23 ti4c SUPPORTING DOC'UMMTATION
Appl__,7; tvri Ncunbri
M1 items must be compkied fir IhEe npnlivH1ion Mil hL- rt!Mrn d
1. APPLICANT MORMADOM
I ApplicanO name• jgwn ofPstLbozn (company, municipality, MCA, utility, etc.)
State of north Carolina
Department of Environmental Quality
Division of Water Resources
„k „v„., .ti. ,� r� Flow Tracking for Sewer Extension Applications
(FTSE 10-23)
Entity Requesting Allocation:
Project Name for which flaw is being requested -
Ore than one FTSE may be required far a single project if the owner of the W"'IP is nor responsfhte for dUpump
stadans along the route of the proposed trasteHwater floli%
1_ Complete this section only if you are the owner of the waste -water treatment plant.
a. WG4'TP Facility Name:
Thank you,
Elaine Wild
Environmental Engineer
Division of Water Resources — NPDES Industrial Permitting Unit
North Carolina Department of Environmental Quality
elaine.wild(@deq.nc.gov
Email correspondence to and from this address is subject to the Norlh
Carolina Public Records Law and may be disclosed to third parties.
Water Quality Permitting I NC DEQ
Permitting Process I NC DEQ
From: Samir Bahho <ba.casespllc(@gmail.com>
Sent: Monday, February 26, 2024 2:30 PM
To: Wild, Elaine <elaine.wild(@deq.nc.gov>
Cc: Rick A. Murray<rick(@agcontracting.com>; Kent Jackson <kiackson(@pittsboronc.gov>
Subject: Re: FW: [External] Re: Meadows Subdivision, Phases II & Phase III - Fast Track Sewer
Application
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with
the Report Message button located on your Outlook menu bar on the Home tab.
Elaine,
I see it as an attachment submitted as a part of the email chain on February 16 @ 8:37 AM.
I asked you if you need a copy mailed to you and I was waiting. Attached to this email is
the FTSE 10-23.
Please let me know if you need a copy mailed to you or better, I will mail you a copy of the
same by tomorrow, February 27. Thanks, Samir
Samir W Bahho, PE
Civil and Structural EnginPeering Services,
4612 Kaplan Drive, Raleigh, NC 27606
Office Tel No. (919) 851-1642
Cell No. (919) 621-0628
On Mon, Feb 26, 2024 at 1:46 PM Wild, Elaine <elaine.wild(&,deq.nc.gov> wrote:
Hello Samir,
According to the FTA Instructions, a FTSE 10-23 form was submitted, however, I do not see it
attached to any of the revised fast track applications that have been submitted through our
many correspondences. Please submit the FTSE 10-23 form with the wastewater flow
requested for this project by March 4, 2024.
Sewer Extension Permitting I NC DEQ
Flow Tracking for Sewer Extension Application (FTSE 10-23)
Thanks,
Elaine Wild
Environmental Engineer
Division of Water Resources— NPDES Industrial Permitting Unit
North Carolina Department of Environmental Quality
elaine.wild(@deq.nc.gov
Uopfrlmnitaffmitu�rtsnW p�a��i''l /�"
Email correspondence �WS address is subject to the North
Carolina Public Reccrcis 1.. and may be disclosed fa rr,;, : carties.
Water Quality Permitting lI NC DEQ
Permitting Process I NC DEQ
From: Samir Bahho <ba.casespllc(@gmail.com>
Sent: Friday, February 16, 2024 8:38 AM
To: Wild, Elaine <elaine.wild(cDdeq.nc.gov>
Cc: Rick A. Murray<rick(cDagcontracting.com>; Kent Jackson <kiackson(CDpittsboronc.gov>
Subject: Re: FW: [External] Re: Meadows Subdivision, Phases 11 & Phase III - Fast Track Sewer
Application
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails
with the Report Message button located on your Outlook menu bar on the Home tab.
Thank you Elaine,
Attached is an updated FTA with Section 11(4) filled with the coordinates you provided.
Thank you for your help working with me to complete the application.
Please let me know if you need a hard copy of FTA and Narrative mailed to you.
Thanks, Samir
Samir W Bahho, PE
Civil and Structural EnginPeering Services,
4612 Kaplan Drive, Raleigh, NC 27606
Office Tel No. (919) 851-1642
Cell No. (919) 621-0628
On Fri, Feb 16, 2024 at 7:35 AM Wild, Elaine <elaine.wild(&,deq.nc.gov> wrote:
Hello Samir,
Thank you for the quick response. I have provided additional responses below in blue,
again. The only remaining item is still the coordinates, please review my response and reply
accordingly.
Thank you,
Elaine Wild
Environmental Engineer
Division of Water Resources — NPDES Industrial Permitting Unit
North Carolina Department of Environmental Quality
elaine.wild(@deq.nc.gov
D_EQ
Email correspondence Yo and `� omr !r;is address is subjce ro ;+,e r',+a. +;
Carolina Public Records (.tYG. an;: +ra, I,e drsc)osed to third ;.! a, t,es
Water Quality Permitting lI NC DEQ
Permitting Process I NC DEQ
From: Samir Bahho <ba.casespllc(@gmail.com>
Sent: Thursday, February 15, 2024 3:35 PM
To: Wild, Elaine <elaine.wild(cDdeq.nc.gov>; Rick A. Murray<rick(cDagcontracting.com>; Kent
Jackson <kiackson(cDpittsboronc.gov>
Subject: Re: FW: [External] Re: Meadows Subdivision, Phases II & Phase III - Fast Track
Sewer Application
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails
with the Report Message button located on your Outlook menu bar on the Home tab.
Elaine,
I apologize for the errors. I reviewed your comments and hope I addressed all
correctly. Below is your email response copied. I have my response in Red to every
item as follows
1. The project coordinates were corrected and provided in Section 11.4 of the FTA
Lat: 37.708056 and Long:-79.181806 — These coordinates are near Willow, VA.
Please provide an updated Page 1 with the correct project
coordinates. Response: From North Carolina Latitude and longitude map the
coordinate for address (114 Whispering Meadows Lane, which is the last house
built in Whispering Meadows SubdivisionPhs 1) is Latitude: 35.708138 decimal
degree and Longitude :-79.181404 decimal degree. (the last 2 numbers were
added to the revised FTA ) Phase III starting point is approx. 400' to the north
west of 114 Whispering Meadows Lane. The coordinates 35.708952,
-79.180541, seems to be closer to the project area specified in the maps
submitted on 02/09/2024. Please verify and update the FTA accordingly.
a. Also, according to the TopographicChatham C. tax map pdf provided, it
appears as though Phase III connects to Phase 11. If this is the case, then
the downstream sewer is Whispering Meadows Phase 2 (WQ0043121).
The system wide collection system may be the Town of Pittsboro
collection system, please verify with the Town and enter the correct
WQCS permit number. Please update Section V.1-3 accordingly.
Response:Yes the receiving down stream is Whispering Meadow, Phase II
and the permit number was added to section V 1&2 of the revised FTA -
updated
2. Section IX.4 of the FTA was updated to show: Cape Fear River Basin - corrected .
Response: OK thanks,
3.
a)The flow calculation was revised to show the reduced flow for phase III to be: 2550
gallons/day. -corrected: Response: OK thanks,
b) The applicant will follow immediately to prepare permit amendments requests to
amend Phase 1 (WQ0036103) and Phase 2 flow (WQ0043121) to reflect the reduced
flow for permits. — noted that modification applications for Phase 1 (WQ0036103) and
Phase 2 (WQ0043121) to reduce flow will be submitted individually to the Raleigh
Regional Office. Response: Applications for sewer reduction will be submitted
separately as instructed
4. 8.5x11 color copy of USGS Topographic map and colored aerial map are attached
and County Tax Map . — aerial map submitted. Topographical map sufficient.
Response: OK thank you
S.Section VI.7 of the FTA was revised to show 10 units (6 3-bedroom and 4 4-bedroom
units). According to Section VI1.1. of the FTA submitted 2/9/24, the proposed GS is
of 8" DIP but the narrative states PVC (like the old FTA). Please update the
narrative, or FTA, accordingly and resubmit. Response: The narrative document was
revised to show DI. - updated
Attached a complete revised FTA and Narrative Documents. I hope all your provided
comments are addressed and completed. Please let me know if you would like to have
a copy mailed to your office.
Thanks Samir
Samir W Bahho, PE
Civil and Structural EnginPeering Services,
4612 Kaplan Drive, Raleigh, NC 27606
Office Tel No. (919) 851-1642
Cell No. (919) 621-0628
IN
rick0agcontracting.com
On Wed, Feb 14, 2024 at 11:02 AM rick(@agcontracting.com
<rick(@agcontracting.com> wrote:
Hi Samir,
I don't know what's going on with the latitude and longitude. I checked the one I
sent you 3 times and it always came up correctly. Now I'm getting different
coordinates.
This is what's coming up now but you better check it too. 35.708953,-79.181333
Thank You,
Rick A. Murray
AQ Contracting Inc.
PO Box 735
Mebane, NC 27302
0 — 919-307-1504
0 — 336-350-9291
M — 919-656-6900
Email rick(@agcontracting.com
From: Wild, Elaine <elaine.wild(@deq.nc.gov>
Sent: Wednesday, February 14, 2024 8:54 AM
To: Samir Bahho <ba.casespllc(@gmail.com>
Cc: rick(@agcontracting.com; kiackson@pittsboronc.gov
Subject: RE: [External] Re: Meadows Subdivision, Phases II & Phase III - Fast Track
Sewer Application
Hello Samir,
Please see my responses below in blue. Please note that the information requested
is due by February 22, 2023, and note that the requested information must be
submitted by this date, or the applicant will be required to submit a new application
and application fee in accordance with 15A NCAC 02T .0107.
Thank you,
Elaine Wild
Environmental Engineer
Division of Water Resources— NPDES Industrial Permitting Unit
North Carolina Department of Environmental Quality
elaine.wiId(@deq.nc.gov<mailto:andrew.ham monds(@deq.nc.gov>
[cid:image001.png@01DA5F1F.4D8E0000]
Water Quality Permitting I NC
DEQ<https://www.deq.nc.gov/about/divisions/water-resources/water-quality
permitting>
Permitting Process I NC DEQ<https://www.deg.nc.gov/about/divisions/water
resources/oermitti ng/nodes-wastewater/permitting-orocess>
From: Samir Bahho <ba.casespllc(@@mail.com<maiIto: ba.casespllc(@gmail.com>>
Sent: Friday, February 9, 2024 8:49 PM
To: Wild, Elaine <elaine.wild(@deq.nc.gov<mailto:elaine.wild(@deq.nc.gov>>
Cc: rick(@agcontracting.com<maiIto: rick(@agcontracting.com>; Wilson, Susan A
<susan.wilson(@deq.nc.gov<mailto:susan.wilson(@deq.nc.gov>>; Williams, Theresa K
<Theresa.Williams(@deq.nc.gov<mailto:Theresa.Williams(@deq.nc.gov>>;
kiackson(@pittsboronc.gov<maiIto: kiackson(@pittsboronc.gov>
Subject: Re: [External] Re: Meadows Subdivision, Phases II & Phase III - Fast Track
Sewer Application
CAUTION: External email. Do not click links or open attachments unless verified.
Report suspicious emails with the Report Message button located on your Outlook
menu bar on the Home tab.
Elaine,
Attached are corrected documents with the comments per your email on January 4,
2024.
1. The project coordinates were corrected and provided in Section 11.4 of the FTA
Lat: 37.708056 and Long:-79.181806 — These coordinates are near Willow, VA.
Please provide an updated Page 1 with the correct project coordinates.
* Also, according to the TopographicChatham C. tax map.pdf provided, it
appears as though Phase III connects to Phase 11. If this is the case, then the
downstream sewer is Whispering Meadows Phase 2 (WQ0043121). The system
wide collection system may be the Town of Pittsboro collection system, please
verify with the Town and enter the correct WQCS permit number. Please update
Section V.1-3 accordingly.
2. Section IX.4 of the FTA was updated to show: Cape Fear River Basin - corrected
3.
a)The flow calculation was revised to show the reduced flow for phase III to be:
2550 gallons/day. - corrected
b) The applicant will follow immediately to prepare permit amendments requests to
amend Phase 1 (WQ0036103) and Phase 2 flow (WQ0043121) to reflect the
reduced flow for permits. — noted that modification applications for Phase 1
(WQ0036103) and Phase 2 (WQ0043121) to reduce flow will be submitted
individually to the Raleigh Regional Office.
4. 8.5x11 color copy of USGS Topographic map and colored aerial map are attached
and County Tax Map . — aerial map submitted. Topographical map sufficient.
S.Section VI.7 of the FTA was revised to show 10 units (6 3-bedroom and 4 4-
bedroom units). According to Section V11.1. of the FTA submitted 2/9/24, the
proposed GS is 250 LF of 8" DIP but the narrative states PVC (like the old FTA).
Please update the narrative, or FTA, accordingly and resubmit.
I will be mailing the same documents Monday, February 12,2024.
Please let me know if you need more info. Thanks, Samir
Samir W Bahho, PE
Civil and Structural Engineering Services,
4612 Kaplan Drive, Raleigh, NC 27606
Office Tel No. (919) 851-1642
Cell No. (919) 621-0628
On Mon, Jan 22, 2024 at 4:46 PM Wild, Elaine
<elaine.wild(@deq.nc.gov<mailto:elaine.wild(@deq.nc.gov>>wrote:
Hi Rick,
Please see the attached additional information request that was sent to Kent and
Samir on January 4, 2024. Please note that the information requested is due by
February 3, 2023, and note that the requested information must be submitted
within 30 days of the original request, or the applicant will be required to submit a
new application and application fee in accordance with 15A NCAC 02T .0107.
15A NCAC 02T .0107 Staff Review and Permit Preparation states:
* "(2) (e) If an application is accepted and later found to be incomplete, the
applicant shall be advised how the application or accompanying supporting
information may be modified to make it complete. The staff shall advise the
applicant:
(2) if all required information is not submitted within 30 days, the project will be
returned as incomplete. Any resubmittal of a returned application shall be
accompanied with a new application fee."
Sincerely,
Elaine Wild
Environmental Engineer
Division of Water Resources - Raleigh Regional Office
North Carolina Department of Environmental Quality
919.791.4254 Office
elaine.wiId(@deq.nc.gov<mailto:andrew.ham monds(@deq.nc.gov>
[cid:image001.png@01DA5F1F.4D8ECCC0]
Sewer Extension Permitting I NC
DEQ<https://www.deq.nc.gov/about/divisions/water-
resources/permitting/municipal-npdes-pretreatment-and-collection-
system/collection-systems/sewer-extension-permitting>
subchapter t rules.pdf (state.nc.us)
<http://reports.oah.state.nc.us/ncac/title%2015a%20-
%20environmental%20q uality/chapter%2002%20-
%20environmental%20management/subchapter%20t/subchapter%20t%20rules.pdf>
From: rick(@agcontracting.com<maiIto: rick(@agcontracting.com>
<rick(@agcontracting.com<maiIto: rick(@agcontracting.com>>
Sent: Monday, January 15, 2024 9:09 AM
To: Wild, Elaine <elaine.wild(@deq.nc.gov<mailto:elaine.wild(@deq.nc.gov>>
Cc: Wilson, Susan A <susan.wilson(@deq.nc.gov<mailto:susan.wilson(@deq.nc.gov>>;
Williams, Theresa K
<Theresa.Williams(@deq.nc.gov<mailto:Theresa.Williams(@deq.nc.gov>>; 'Bahho
Samir (ba.casespllc(@gmail.com<maiIto: ba.casespllc(@gmail.com>)'
<ba.casespllc(@gmail.com<maiIto: ba.casespllc(@gmail.com>>
Subject: RE: [External] Re: Meadows Subdivision, Phases II & Phase III - Fast Track
Sewer Application
CAUTION: External email. Do not click links or open attachments unless verified.
Report suspicious emails with the Report Message button located on your Outlook
menu bar on the Home tab.
Hi Elaine,
Can you please call me back this morning for this? 919-656-6900. 1 left you a
message Friday also. Haven't heard anything since your last email and I am really
under the gun with the weather and possibly loosing our contractor if we can't let
him get started.
Thank You,
Rick A. Murray
AQ Contracting Inc.
PO Box 735
Mebane, NC 27302
0 — 336-350-9291
M — 919-656-6900
Email rick(@agcontracting.com<maiIto: rick(@agcontracting.com>
From: rick(@agcontracting.com<maiIto: rick(@agcontracting.com>
Sent: Wednesday, January 3, 2024 2:31 PM
To: Wild, Elaine <elaine.wild(@deq.nc.gov<mailto:elaine.wild(@deq.nc.gov>>
Cc: Wilson, Susan A <susan.wilson(@deq.nc.gov<mailto:susan.wilson(@deq.nc.gov>>;
Williams, Theresa K
<Theresa.WiIlia ms(@cleg.nc.gov<mailto:Theresa.WiIIiams(@deq.nc.gov>>
Subject: RE: [External] Re: Meadows Subdivision, Phases II & Phase III - Fast Track
Sewer Application
Hi Elaine,
Thank You!
Thank You,
Rick A. Murray
AQ Contracting Inc.
PO Box 735
Mebane, NC 27302
0 — 919-307-1504
0 — 336-350-9291
M — 919-656-6900
Email rick(@agcontracting.com<maiIto: rick(@agcontracting.com>
From: Wild, Elaine <elaine.wild(@deq.nc.gov<mailto:elaine.wild(@deq.nc.gov>>
Sent: Wednesday, January 3, 2024 1:43 PM
To: rick(@agcontracting.com<maiIto: rick(@agcontracting.com>
Cc: Wilson, Susan A <susan.wilson(@deq.nc.gov<mailto:susan.wilson(@deq.nc.gov>>;
Williams, Theresa K
<Theresa.Williams(@deq.nc.gov<mailto:Theresa.Williams(@deq.nc.gov>>
Subject: RE: [External] Re: Meadows Subdivision, Phases 11 & Phase III - Fast Track
Sewer Application
Hi Rick,
The application is still under review. I will send you an email within the week
requesting additional information.
Thank you,
Elaine Wild
Environmental Engineer
Division of Water Resources - Raleigh Regional Office
North Carolina Department of Environmental Quality
919.791.4254 Office
elaine.wiIdPdeq.nc.gov<mailto:andrew.ham monds(@deq.nc.gov>
[cid:image001.png@01DA5F1F.4D8ECCC0]
Sewer Extension Permitting I NC
DEQ<https://www.deq.nc.gov/about/divisions/water-
resources/permitting/municipal-npdes-pretreatment-and-collection-
s)zstem/collection-systems/sewer-extension-permitting>
subchapter t rules.pdf (state.nc.us)
<http://reports.oah.state.nc.us/ncac/title%2015a%20-
%20environmental%20q uality_/chapter%2002%20-
%20environmental%20management/subchapter%20t/subchapter%20t%20rules.pdf>
From: rick(@agcontracting.com<maiIto: rick(@agcontracting.com>
<rick(@agcontracting.com<maiIto: rick(@agcontracting.com>>
Sent: Wednesday, January 3, 2024 12:09 PM
To: Wild, Elaine <elaine.wild(@deq.nc.gov<mailto:elaine.wild(@deq.nc.gov>>
Subject: RE: [External] Re: Meadows Subdivision, Phases II & Phase III - Fast Track
Sewer Application
CAUTION: External email. Do not click links or open attachments unless verified.
Report suspicious emails with the Report Message button located on your Outlook
menu bar on the Home tab.
Hi Elaine,
Looking for an update for Whispering Meadows phases 2 & 3 in Pittsboro, NC
please? This was applied for as an expedited application but it has been quite some
time since hearing anything.
I have a contractor ready to go for this project and hate to lose their availability.
Thank You,
Rick A. Murray
AQ Contracting Inc.
PO Box 735
Mebane, NC 27302
0 — 919-307-1504
0 — 336-350-9291
M — 919-656-6900
Email rick(@agcontracting.com<maiIto: rick(@agcontracting.com>
From: Williams, Theresa K
<Theresa.Williams(@deq.nc.gov<mailto:Theresa.Williams(@deq.nc.gov>>
Sent: Wednesday, January 3, 2024 11:55 AM
To: rick(@agcontracting.com<maiIto: rick(@agcontracting.com>
Cc: Wilson, Susan A <susan.wilson(@deq.nc.gov<mailto:susan.wilson(@deq.nc.gov>>;
Wild, Elaine <elaine.wild(@deq.nc.gov<maiIto: elaine.wiId(@deq.nc.gov>>
Subject: RE: [External] Re: Meadows Subdivision, Phases II & Phase III - Fast Track
Sewer Application
Hi Rick,
I got that wrong Elaine Wild is working on that project.
You can contact her for updates.
Theresa Williams
P.S. Thank you Elaine.
From: rick(@agcontracting.com<maiIto: rick(@agcontracting.com>
<rick(@agcontracting.com<maiIto: rick(@agcontracting.com>>
Sent: Wednesday, January 3, 2024 11:14 AM
To: Williams, Theresa K
<Theresa.Williams(@deq.nc.gov<mailto:Theresa.Williams(@deq.nc.gov>>; Samir
Bahho <ba.casespllc(@gmail.com<maiIto: ba.casespllc(@gmail.com>>
Subject: RE: [External] Re: Whispering Meadows Subdivision, Phases II & Phase III -
Fast Track Sewer Application
CAUTION: External email. Do not click links or open attachments unless verified.
Report suspicious emails with the Report Message button located on your Outlook
menu bar on the Home tab.
Hi Theresa,
We haven't heard anything on our fast track application in quite a while and hoping
you give me an update please. I have a contractor ready to go for this project and
hate to lose their availability.
Thank You,
Rick A. Murray
AQ Contracting Inc.
PO Box 735
Mebane, NC 27302
0 — 919-307-1504
0 — 336-350-9291
M — 919-656-6900
Email rick(@agcontracting.com<maiIto: rick(@agcontracting.com>
From: Williams, Theresa K
<Theresa.Williams(@deq.nc.gov<mailto:Theresa.Williams(@deq.nc.gov>>
Sent: Wednesday, November 15, 2023 9:32 AM
To: Kent Jackson <kiacksonPpittsboronc.goy<maiIto: kiacksonPpittsboronc.gov»;
Samir Bahho <ba.casespllc(@gmail.com<maiIto: ba.casespllc(@gmail.com>>;
rick(@agcontracting.com<maiIto: rick(@agcontracting.com>
Subject: RE: [External] Re: Whispering Meadows Subdivision, Phases II & Phase III -
Fast Track Sewer Application
Good Morning,
Thank you for the copy of the latest version of the application and instructions
documents.
I still need the original of the application mailed so that I have "wet ink" signatures.
Theresa K. Williams
Administrative Specialist
Water Resources
Water Quality Regional Operations Section (WQROS)
North Carolina Department of Environmental Quality
Office: (919)791-4246
theresa.williams(@deq.nc.gov<mailto:theresa.williams(@ncdenr.gov>
"Your smile is your logo. Your personality is your business card. How you leave
others after an experience with you becomes your trademark." - Jay Danzie
Physical Address: 3800 Barrett Drive, Raleigh, NC 27609
Mailing Address: 1628 Mail Service Center, Raleigh, NC 27699-1628
[cid:image002.png@01DASFlF.4D8ECCCO]
From: Kent Jackson
<kiackson(a_pittsboronc.gov<maiIto: kiackson(a_pittsboronc.gov>>
Sent: Wednesday, November 15, 2023 9:16 AM
To: Samir Bahho <ba.casespllc(@gmail.com<maiIto: ba.casespllc(@gmail.com>>;
rick(@agcontracting.com<maiIto: rick(@agcontracting.com>
Cc: Williams, Theresa K
<Theresa.Williams(@deq.nc.gov<mailto:Theresa.Williams(@deq.nc.gov>>
Subject: RE: [External] Re: Whispering Meadows Subdivision, Phases II & Phase III -
Fast Track Sewer Application
CAUTION: External email. Do not click links or open attachments unless verified.
Report suspicious emails with the Report Message button located on your Outlook
menu bar on the Home tab.
Samir attached w/ applicant section complete. Thanks.
Kent Jackson I Assistant Town Manager/Engineering Director
Town of Pittsboro, North Carolina
Email: kiackson(@pittsboronc.goy<maiIto: kiackson(@pittsboronc.gov>
Phone: (919) 542-5480 ext. 1002
Web: www.pittsboronc.gov<http//www.pittsboronc.gov/>
287 East Street, Suite 221-A I PO Box 759 1 Pittsboro, NC 27312
Pursuant to NCGS §132 Public Records, emails (including replies and attachments)
may be released to others upon request for inspection and copying.
From: Samir Bahho <ba.casespllc(@gmail.com<mai Ito: ba.casespllc(@gmail.com>>
Sent: Thursday, November 2, 2023 4:14 PM
To: rick(@agcontracting.com<maiIto: rick(@agcontracting.com>; Kent Jackson
<kiackson(c_pittsboronc.gov<maiIto: kiackson(c_pittsboronc.gov>>
Subject: Re: [External] Re: Whispering Meadows Subdivision, Phases II & Phase III -
Fast Track Sewer Application
Rick and Kent,
Attached is a PDF copy of filled FTA (10-23) and completed with all information
includingTown of Pittsboro information copied from the previous FTA.
Kent,
Please review the information and sign and date the applicant certification clause. I
have already signed and sealed the Form.
and please email the signed form back. I will make 2 copies and mail it to Theresa
Williams.
Thanks, Samir
Samir W Bahho, PE
Civil and Structural EnginPeering Services,
4612 Kaplan Drive, Raleigh, NC 27606
Office Tel No. (919) 851-1642
Cell No. (919) 621-0628
On Thu, Nov 2, 2023 at 9:55 AM
rick(@ agcontracting.com<maiIto: rick(@agcontracting.com>
<rick(@agcontracting.com<mai Ito: rick(@agcontracting.com>> wrote:
Sorry for the extra work Kent and Samir.
It would have been nice if she would have let us know to begin with.
Thank You,
Rick A. Murray
AQ Contracting Inc.
PO Box 735
Mebane, NC 27302
0 — 919-307-1504
0 — 336-350-9291
M — 919-656-6900
Email rick(@agcontracting.com<mai Ito: rick(@agcontracting.com>
From: Samir Bahho <ba.casespllc(@gmail.com<mai Ito: ba.casespllc(@gmail.com>>
Sent: Thursday, November 2, 2023 9:48 AM
To: rick(@agcontractin.Q.com<maiIto: rick(@agcontractin.R.com>; Kent Jackson
<kiackson(c_pittsboronc.gov<maiIto: kiackson(c_pittsboronc.gov>>
Subject: Fwd: [External] Re: Whispering Meadows Subdivision, Phases II & Phase III -
Fast Track Sewer Application
Rick,
I am forwarding the email from Theresa Willians from DEQ. The FTA we submitted is
an old application and we have to submit it on an updated form.
I pulled the updated application from the web. I will fill it today and forwarded to
you and Kent for the town of Pittsboro to complete and sign.
I wonder why she did not tell us in the previous emails when she requested to
change the check amount. Thanks, Samir
Samir W Bahho, PE
Civil and Structural EnginPeering Services,
4612 Kaplan Drive, Raleigh, NC 27606
Office Tel No. (919) 851-1642
Cell No. (919) 621-0628
---------- Forwarded message ---------
From: Williams, Theresa K
<Theresa.Williams(@deq.nc.gov<mailto:Theresa.Williams(@deq.nc.gov>>
Date: Wed, Nov 1, 2023 at 9:28 AM
Subject: RE: [External] Re: Whispering Meadows Subdivision, Phases II & Phase III -
Fast Track Sewer Application
To: Samir Bahho <ba.casespllc(@gmail.com<maiIto: ba.casespllc(@gmail.com>>
Good Morning,
The application and instruction document you submitted were the older version (4-
16).
Please submit a signed and sealed copy of the most recent version of the
application and instructions document (6-21).
The most recent version can be found here:
https://www.deq.nc.gov/about/divisions/water-resources/water-quality
permitting/municipal-npdes-pretreatment-and-collection-system/collection-
systems/sewer-extension-permitting
Theresa K. Williams
Administrative Specialist
Water Resources
Water Quality Regional Operations Section (WQROS)
North Carolina Department of Environmental Quality
Office: (919)791-4246
theresa.williams(@deq.nc.gov<mailto:theresa.williams(@ncdenr.gov>
"Your smile is your logo. Your personality is your business card. How you leave
others after an experience with you becomes your trademark." - Jay Danzie
Physical Address: 3800 Barrett Drive, Raleigh, NC 27609
Mailing Address: 1628 Mail Service Center, Raleigh, NC 27699-1628
[cid:image002.png@01DASFlF.4D8ECCCO]
From: Samir Bahho <ba.casespllc(@@mail.com<maiIto: ba.casespllc(@gmail.com>>
Sent: Wednesday, October 25, 2023 9:45 AM
To: Williams, Theresa K
<Theresa.Williams(@deq.nc.gov<mailto:Theresa.Williams(@deq.nc.gov>>
Subject: Re: [External] Re: Whispering Meadows Subdivision, Phases II & Phase III
CAUTION: External email. Do not click links or open attachments unless verified.
Report suspicious emails with the Report Message button located on your Outlook
menu bar on the Home tab.
Theresa,
Yes, shred the $480 check. We will mail new check for $600 with 2 copies of the
instructions for the Form, Thanks, Samir
Samir W Bahho, PE
Civil and Structural EnginPeering Services,
4612 Kaplan Drive, Raleigh, NC 27606
Office Tel No. (919) 851-1642
Cell No. (919) 621-0628
On Mon, Oct 23, 2023 at 8:29 AM Williams, Theresa K
<Theresa.WiIlia ms(@deg.nc.gov<mailto:Theresa.WiIIiams(@deq.nc.gov>> wrote:
Good Morning,
I received a message that you called me on Friday.
In answer to your question, we will need a new check for the full amount of $600.
We cannot process two checks for the same project in our system.
Let me know if you want me to shred the $480 check through this email stating the
name of the project,
the amount of the check and the date of the check for reference.
Also, please send the Instructions checklist document to go along with the
application that we have.
This is required to process the application.
Thank you,
Theresa K. Williams
Administrative Specialist
Water Resources
Water Quality Regional Operations Section (WQROS)
North Carolina Department of Environmental Quality
Office: (919)791-4246
theresa.williams(@deq.nc.gov<mailto:theresa.williams(@ncdenr.gov>
"Your smile is your logo. Your personality is your business card. How you leave
others after an experience with you becomes your trademark." - Jay Danzie
Physical Address: 3800 Barrett Drive, Raleigh, NC 27609
Mailing Address: 1628 Mail Service Center, Raleigh, NC 27699-1628
[cid:image002.png@01DASFlF.4D8ECCCO]
From: Samir Bahho<ba.casespllc(@gmail.com<maiIto: ba.casespllc(@gmail.com>>
Sent: Friday, October 20, 2023 11:13 AM
To: Williams, Theresa K
<Theresa.Williams(@deq.nc.gov<mailto:Theresa.Williams(@deq.nc.gov>>
Subject: [External] Re: Whispering Meadows Subdivision, Phases II & Phase III
CAUTION: External email. Do not click links or open attachments unless verified.
Report suspicious emails with the Report Message button located on your Outlook
menu bar on the Home tab.
Theresa,
Subject: Whispering Meadows Sewer Phase 3
Please let me know if the check provided will be in the full amount of $600 or the
balance of $120.
Also,
1. per your request to supply the instructions document with the check, do you
mean a full package documentation of the plans that were mailed previously or just
reference to the project?.
2. The project Exact Iocation:The lots in phase 3 have not been assigned an address
yet. Below are Latitude and longitude and parcel number of the project hoping that
will satisfy your request.
Latitude 35.708247
Longitude-79.181784
Chatham County Parcel #7713, Pittsboro, NC
I placed a voicemail for you this morning. No need to call back if you respond to this
email. Thanks, Samir
Samir W Bahho, PE
Civil and Structural EnginPeering Services,
4612 Kaplan Drive, Raleigh, NC 27606
Office Tel No. (919) 851-1642
Cell No. (919) 621-0628
On Fri, Oct 20, 2023 at 5:52 AM
rick(@agcontracting.com<maiIto: rick(@agcontracting.com>
<rick(@agcontracting.com<maiIto: rick(@agcontracting.com>> wrote:
Good Morning,
Maybe ask Theresa what she will accept for the location?
There is no address for the vacant land. Maybe they want latitude and longitude?
Latitude 35.708247
Longitude-79.181784
Chatham Cty Parcel #7713
Does she want a new check for $600 or a check for the balance of $120?
Thank You,
Rick A. Murray
AQ Contracting Inc.
PO Box 735
Mebane, NC 27302
0 — 919-307-1504
0 — 336-350-9291
M — 919-656-6900
Email rick(@agcontractin.Q.com<mai Ito: rick(@agcontractin.Q.com>
From: Samir Bahho <ba.casespllc(@gmail.com<mai Ito: ba.casespllc(@gmail.com>>
Sent: Thursday, October 19, 2023 7:51 PM
To: rick(@agcontracting.com<maiIto: rick(@agcontracting.com>
Subject: Fwd: Whispering Meadows Subdivision, Phases II & Phase III
I am forwarding the email I received form DEQ. They have increased the fee amount
to $600. 1 will email her tomorrow/Call her to know how to get the additional
money to her and let you know.
Please send me the address of the property if you have it. Thanks, Samir
Samir W Bahho, PE
Civil and Structural EnginPeering Services,
4612 Kaplan Drive, Raleigh, NC 27606
Office Tel No. (919) 851-1642
Cell No. (919) 621-0628
Forwarded message
From: Williams, Theresa K
<Theresa.WiIlia ms(@deg.nc.gov<mailto:Theresa.WiIIiams(@deq.nc.gov>>
Date: Thu, Oct 19, 2023 at 2:56 PM
Subject: RE: Whispering Meadows Subdivision, Phases II & Phase III
To: Kent Jackson <kiackson(a_pittsboronc.gov<maiIto: kiackson(a_pittsboronc.gov>>
Cc: ba.casespllc(@@mail.comcom<maiIto: ba.casespllc(@gmail.com>
<ba.casespllc(@gmail.com<maiIto: ba.casespllc(@gmail.com>>
so
Please supply the instructions document when you send the new check.
I also need to know the exact location of the project.
Thank you,
Theresa K. Williams
Administrative Specialist
Water Resources
Water Quality Regional Operations Section (WQROS)
North Carolina Department of Environmental Quality
Office: (919)791-4246
theresa.williams(@deq.nc.gov<mailto:theresa.williams(@ncdenr.gov>
"Your smile is your logo. Your personality is your business card. How you leave
others after an experience with you becomes your trademark." - Jay Danzie
Physical Address: 3800 Barrett Drive, Raleigh, NC 27609
Mailing Address: 1628 Mail Service Center, Raleigh, NC 27699-1628
[cid:image002.png@01DASFlF.4D8ECCCO]
From: Williams, Theresa K
Sent: Thursday, October 19, 2023 2:51 PM
To: Kent Jackson <kiacksonPpittsboronc.goy<maiIto: kiacksonPpittsboronc.gov»
Cc: ba.casespllc(@@mail.com<maiIto: ba.casespllc(@gmail.com>
Subject: Whispering Meadows Subdivision, Phases II & Phase III
Good Afternoon,
I received your application for the above -named project.
The check in the amount of $480 is not acceptable, as there has been a fee
increase.
Please see the attached letter regarding the new amount that is required with
instructions on how to handle the check you sent.
Once we receive the correct amount, we can move forward with processing your
application.
Thank you,
Theresa K. Williams
Administrative Specialist
Water Resources
Water Quality Regional Operations Section (WQROS)
North Carolina Department of Environmental Quality
Office: (919)791-4246
theresa.williams(@deq.nc.gov<mailto:theresa.williams(@ncdenr.gov>
"Your smile is your logo. Your personality is your business card. How you leave
others after an experience with you becomes your trademark." - Jay Danzie
Physical Address: 3800 Barrett Drive, Raleigh, NC 27609
Mailing Address: 1628 Mail Service Center, Raleigh, NC 27699-1628
[cid:image002.png@01DASFlF.4D8ECCCO]
Email correspondence to and from this address may be subject to the North
Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
CAUTION: This message originated outside the Town of Pittsboro — Do not click links
or open attachments unless you recognize the sender and know the content is safe.