HomeMy WebLinkAboutNCS000483_MS4 Annual Report (2023)_20240306 (2) NCS000483_KERNERSVILLE 2023 ANNUAL SELF ASSESSMENT
Reporting
Line Year BMP Reporting
Measurable Goal Comments
No. (Jan 1- Ref. Metric
Dec 31)
Did Kernersville submit the Annual Self-Assessment to NCDEQ prior to
2 2 1 February 28? NO
Did Kernersville monitor PTRC activities annually to ensure partnership
12 2 4.B.2. commitments are met? YES
Did Kernersville review legal agreement to determine if target pollutants or
16 2 4.B.3. audiences should be revised? PARTIAL Still working on legal agreement
20 2 4.B.3. Did Kernersville revise target pollutants or audiences? YES
Did Kernersville select a local civic group or business group to target for
26 2 5.B.1. public education and outreach? YES
Did Kernersville develop or identify one presentation to cover target
31 2 5.B.2. pollutants for the selected target audience? YES
Did Kernersville present target pollutant stormwaterinformation to the
37 2 5.B.3. selected target audience? YES
Number of participants in the target audience group presentation? sediment,habitat protection,general
38 2 5.B.3. 70 stormwater(3/21,3/22, 10/10/2023)
Did Kernersville develop or identify one interactive activity to addresses a
48 2 6.B.1. target pollutant or pollutants? YES
Did Kernersville staff a booth at one event/festival to distribute
49 2 6.B.2. stormwater information and and perform an interactive activity? YES
sediment,habitat protection,general
Number of educational stormwater interactions at the event/festival stormwater with booths,tours,
booth? models(3/18,3/23,3/26,4/26,4/28,
50 2 6.B.2. 700 5/6,9/1, 10/15/2023)
62 2 7.B.2. Did Kernersville maintain the stormwater web pages? YES
Did Kernersville continue to publicize the stormwater infoline in materials
developed for the stormwater program and posting on stormwater web
70 2 8.B.3. page? YES
Did Kernersville continue to track the number and type of stormwater
76 2 8.B.4. infoline calls received? YES
77 2 8.B.4. Number of stormwater infoline calls received? 33
Did Kernersville develop or identify an annual volunteer activity that
87 2 12.B.1. addresses a target pollutant or pollutants? YES
Did Kernersville plan and implement an annual Town-sponsored volunteer
opportunity targeting residential,commercial,and school audiences with
special emphasis on civic groups, large employers,and large trade
88 2 12.B.2. associations? YES
Plant giveaways,Litter pick-ups,plant
installs(1/5,3/23-25,4/22,7/14,8/3,
89 2 12.B.2. Number of volunteers participating in annual town-sponsored event? 1,779 10/26,12/28/23)
103 2 13.B.2. Did Kernersville add new conveyances/outfalls to the MS4 map? YES
104 2 13.B.2. Total number of major outfalls mapped? 392
105 2 13.B.2. Number of new outfalls added to the MS4 map? 1
116 2 14.B.1. Did Kernersville maintain and enforce the IDDE ordinance? YES
122 2 15.B.2. Did Kernersville maintain and implement the IDDE Plan? YES
Did Kernersville train inspections staff to perform dry weather outfall
131 2 16.B.1. inspections and illicit discharge investigations? YES
Number of inspections staff trained to perform dry weather outfall
132 2 16.B.1. inspections and illicit discharge investigations? 1
Did Kernersville perform inspections of at least 20%of outfalls, as
133 2 16.B.2. described in the IDDE plan? NO
134 2 16.B.2. Number of outfall inspections performed? 36
Number of potential illicit discharges identified during outfall inspections?
135 2 16.B.2. 0
Did Kernersville hold an annual IDDE program evaluation meeting with
152 2 17.B.1. Stormwater Division staff? YES
Did Kernersville review IDDE reports and identify chronic violators, issues,
162 2 17.B.2. and/or"hot-spot" areas? YES
163 2 17.B.2. Number of potential illicit discharges identified? 26
164 2 17.B.2. Number of illicit discharges verified? 23
165 2 17.B.2. Number of illicit discharges resolved/removed? 11
166 2 17.B.2. number of IDDE enforcement actions issued? 18
167 2 17.B.2. Number of chronic violators/"hot spots" identified? 17
Did Kernersville train staff with Illicit Discharge&Detection
192 2 19.B.2. responsibilities? YES
Number of staff with Illicit Discharge& Detection responsibilities trained?
193 2 19.B.2. 1
Did Kernersville train staff with the potential to discover an illicit discharge
194 2 19.B.3. during routine work activities? YES
Number of staff with the potential to discover an illicit discharge during
195 2 19.B.3. routine work activities trained? 1
Did Kernersville train municipal staff on proper handling of construction
210 2 22.B.1. site runoff control and waste management complaints? YES
Number of municipal staff trained on proper handling of construction site
runoff control and waste management complaints?
211 2 22.B.1. 1
Number of construction site runoff control and waste management
219 2 22.B.2. violations identified? 9
Did Kernersville track the number of low-density and high-density plan
236 2 26 reviews performed? YES
Page 1 of 2
NCS000483_KERNERSVILLE 2023 ANNUAL SELF ASSESSMENT
237 2 26 If so, how many low density project reviews were performed? 14
238 2 26 If so, how many high density project reviews were performed? 16
239 2 26 If so, how many low density project reviews were approved? 14
240 2 26 If so, how many high density project reviews were approved? 16
Did Kernersville maintain a current inventory of low-density projects and
constructed SCMs, including SCM type or low-density acreage, location,
257 2 26 last inspection date and type of enforcement action (if any)? PARTIAL
How many high density non-municipally owned SCM inspections were
262 2 26 performed? 133
267 2 26 How many low-density inspections were performed? 3
272 2 26 How many post-construction enforcement actions were issued? 2i
Did Kernersville revise code to require inspection of low-density projects at We have to hire additional help for
276 2 27.B.1. least once during the permit term by a qualified professional? NO ordinance revisions
Did Kernersville revise code to add controls of fecal coliform from pet
277 2 28.B.1. waste? NO
Did Kernersville coordinate with the County to determine the number of
278 2 29.B.1. OSDWT sites in Kernersville? PARTIAL
279 2 29.B.1. Number of OSDWT sites in Kernersville? 4 still working on this
291 2 30.B.3. Did Kernersville maintain and implement the written municipal PPGH Plan? YES
Did Kernersville perform municipal facility inspections in accordance with
295 2 30.B.4. schedule adopted in PPGH Plan? PARTIAL
Number of municipal facility inspections performed in accordance with
296 2 30.B.4. schedule adopted in PPGH Plan? 5
297 2 30.B.4. Number of issues from municipal facility inspections remedied? 0
Did Kernersville maintain a facility inventory, including stormwater
308 2 30.B.5. pollution potential of facility? YES
Did Kernersville evaulate the PPGH Plan and ensure it incorporates all
312 2 30.B.6. required program O&M procedures? PARTIAL
Did Kernersville train public services employees on general stormwater
pollution prevention/spill response/fertilizer training/pavement
319 2 31.B.2. management and overview of the PPGH plan? YES
Number of public services employees trained on general stormwater
pollution prevention/spill response/fertilizer training/pavement
320 2 31.B.2. management and overview of the PPGH plan? 77
Did Kernersville perform MS4 inspections and maintenance in accordance
327 2 33.B.1. with the adopted PPGH Plan? YES
328 2 33.B.1. Number of MS4 inspections performed? 101
329 2 33.B.1. Number of MS4 inspection issues remedied? All
Did Kernersville maintain an inventory of municipal SCMs including device
340 2 34.B.3. type,as-built plans,O&M plans, inspections, maintenance,etc.? YES
348 2 34.B.4. Did Kernersville perform municipal SCM inspections? YES
349 2 34.B.4. Number of municipal SCM inpections performed? 7
350 2 34.B.4. Did Kernersville perform municipal SCM maintenance? YES
351 2 34.B.4. Number of municipal SCMs maintained? 4
Did Kernersville verify that staff maintained landscape chemical
366 2 35.B.1. certifications? YES
367 2 35.B.1. Number of staff with landscape chemical certifications? 10
Did Kernersville review Public Services facility annually to determine if no
375 2 37.B.1. exposure requirements are still met and obtain a NCG080000 pemit if not? YES
382 2 40.B.3. Tons of leaves collected 558 assume 1501b/cuyd; collected 7140cuyd
383 2 40.B.3. Tons of street sweepings collected 94 1
384 2 40.B.3. Miles of street swept 242 2 sweepers collect hours;assume 5 mi/hr
Page 2 of 2