HomeMy WebLinkAbout20070996 Ver 1_Triage Check List_20071114Triage Check List
Date: 11/14/2007 Project Name: Manuel DeJuan -Lots 7&8
DWQ #: 07-0996
County: Jackson
Kevin Barnett, Asheville Regional Office
To:
60-day Processing Time: 11/14/2007 to 1/13/08
From: Ian McMillan Telephone: (919) 715-4631
The file attached is being forwarded to you for your evaluation.
Please call if you need assistance.
Stream length impacted
Stream determination
Wetland determination and distance to blue-line surface waters on USFW topo maps
Minimization/avoidance issues
Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman)
Pond fill
Mitigation Ratios
Ditching
Are the stream and or wetland mitigation sites available and viable?
Check drawings for accuracy
Is the application consistent with pre-application meetings?
Cumulative impact concern
See Attached Questions
Comments: