Loading...
HomeMy WebLinkAbout20070996 Ver 1_Triage Check List_20071114Triage Check List Date: 11/14/2007 Project Name: Manuel DeJuan -Lots 7&8 DWQ #: 07-0996 County: Jackson Kevin Barnett, Asheville Regional Office To: 60-day Processing Time: 11/14/2007 to 1/13/08 From: Ian McMillan Telephone: (919) 715-4631 The file attached is being forwarded to you for your evaluation. Please call if you need assistance. Stream length impacted Stream determination Wetland determination and distance to blue-line surface waters on USFW topo maps Minimization/avoidance issues Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) Pond fill Mitigation Ratios Ditching Are the stream and or wetland mitigation sites available and viable? Check drawings for accuracy Is the application consistent with pre-application meetings? Cumulative impact concern See Attached Questions Comments: