Loading...
HomeMy WebLinkAbout20151163 Ver 1_401 Application_20151115BURTON ENGINEERING ASSOCIATES CIVIL ENGINEERS LAND PLANNERS 5050 Fairview Rd. • Suite 100 -Charlotte, NC 28210 (704) 553 -8881 . Fax (704) 553 -8860 Transmittal Attention: Sheri Montalvo Company: NCDENR Water Quality Permitting Address: 1617 Mail Service Center 14 Raleigh, NC 27699 Phone #: 919- 807 -6303 From: Eleanor Rochelle Project Name: IBP Lot 10 Spec Building Project Number: 619 -001 Date: Nov. 2, 2015 R 2@20WR NOV 0 5 2015 I - Burton Engineering Associates Re: IBP Lot 10 Spec Building Stream Crossing Via: DUPS ❑USPS ❑Courier ❑Hand Deliver ❑Pick Up Copies Date Pages Description 4 11/02/15 14 IBP Lot 10 Spec Building Civil Plans (11x17) 1 11/12/09 23 Stormwater Calcs for Existing Pond 4 10/26/15 10 NCDENR Pre - Construction Notification Form 1 1 USGS Location Map 1 10/27/15 Check for $240.00 to NC Division of Water Quality ❑ As Requested 0 For Approval ❑ For Your Use ❑ For Review and Comment If you have any questions concerning this information, please contact Burton Engineering Associates by calling (704) 553 -8881 or by emailing erochelle @burtonengineering.com Sincerely, Eleanor Rochelle Burton Engineering Associates PLEASE NOTIFY AT ONCE IF ALL ENCLOSURES ARE NOT INCLUDED 110 W A T�S9q olqi�-c Office Use Only. Corps a 'on I o. DWQ p ct Form V ion 1.4 Janua 009 Page 1 of 10 PCN Form — Version 1.4 January 2009 3 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing - 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑X Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑Yes ❑X No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: IBP Lot 10 Spec Building 2b. County: Cabarrus 2c. Nearest municipality / town: Concord 2d. Subdivision name: International Business Park 2e. NCDOT only, T.I.P. or state project no: N/A 3. Owner Information 3a. Name(s) on Recorded Deed: Bedford Village, SA dba Bedford Village SA, Inc. 3b. Deed Book and Page No. DB 2343 PG 92 3c. Responsible Parry (for LLC if applicable): 3d. Street address: 1499 West Palmetto Park Rd, Suite 204 3e. City, state, zip: Boca Raton, FL 33486 3f. Telephone no.: 561 - 338 -7480 3g. Fax no.: 3h. Email address: sandreoni @nolimgroup.com (Stephanie Andreoni) Page 1 of 10 PCN Form — Version 1.4 January 2009 3 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑X Other, specify: Developer 4b. Name: Sean McDonnell 4c. Business name (if applicable): Beacon Partners 4d. Street address: 610 East Morehead Street, Suite 250 4e. City, state, zip: Charlotte, NC 28202 4f. Telephone no.: 704 - 929 -1386 4g. Fax no.: 4h. Email address: sean @beacondevelopment.com S. Agent/Consultant Information (if applicable) 5a. Name: Greg Welsh, PE 5b. Business name (if applicable): Burton Engineering Associates 5c. Street address: 5950 Fairview Road, Suite 100 5d. City, state, zip: Charlotte, NC 28210 5e. Telephone no.: 704 - 553 -8881 5f. Fax no.: 5g. Email address: Greg @burtonengineering.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 5601 -52- 3460 -0000 1 b. Site coordinates (in decimal degrees): Latitude: 35.2517 Longitude: 80.3938 1 c. Property size: 4.6 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Unnamed tributary to Afton Run 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Yadkin Pee -Dee 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is currently undeveloped with good grass cover and a steady slope to the rear of the property. The property is located in an industrial development area. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 260 3d. Explain the purpose of the proposed project: Construct a 50K SF spec warehouse facility with 50 +/- employee parking spaces on the north side of the building (entrance off Enterprise Drive NW) and a truck court with dock doors on the south side of building (entrance off Business Drive NW) 3e. Describe the overall project in detail, including the type of equipment to be used: Install permanent 60" RCP culvert, submerged 12- inches below existing bottom of stream with no end treatment or rip -rap. Backfill with clean structural fill at 2.1 side slopes. Construct 30 -foot wide permanent truck entrance with concrete curb and gutter. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project includ ng all prior phases) in the past? ❑ Yes ❑ No ❑X Unknown Comments: Jurisdictional stream identified by Thompson Environ. 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Thompson Environmental Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. It is unknown if the state and /or Corps has reviewed the determination by Thompson Environmental. Burton Engineering is operating on the assumption that the stream is considered jurisdictional. Field review completed by Thompson Environmental on 11/7/2014. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? El Yes ❑ No E] Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands X❑ Streams —tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 Choose one Choose one Yes /No - W2 - Choose one Choose one Yes /No - W3 - Choose one Choose one Yes /No - W4 - Choose one Choose one Yes /No - W5 - Choose one Choose one Yes /No - W6 - Choose one Choose one Yes /No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert Unnamed Tributary INT Corps 2.5 85 S2 - Choose one _ S3 - Choose one _ S4 - Choose one _ S5 - Choose one _ S6 - Choose one _ 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? 6b. 6c. Buffer Impact Reason for impact number — Permanent (P) or Temporary ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6d. 6e. 6f. 6g. Stream name Buffer Zone 1 Zone 2 mitigation impact impact required? (square (square feet ) feet B1 Yes/No B2 Yes/No B3 Yes/No B4 Yes/No B5 Yes/No B6 Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Perpendicular driveway crossing to minimize disturbance. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. A second entrance is located on the other end of the site to minimize the use of the temporary stream crossing. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: N/A 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes X No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? ova 2b. Does this project require a Stormwater Management Plan? ❑X Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? City of Concord 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? City of Concord ❑ Phase II 3b. Which of the following locally- implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑X No attached? 4. DWQ Stormwater Pro ram Review C]Coastal counties ❑HQW 4a. Which of the following state - implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006 -246 ❑Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑X Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑X Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes ❑X No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after- the -fact permit application? ❑ Yes ❑ No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in Yes Q No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed rolIect, or available capacity of the subject facility. Water and Sewer Autgon'ty of Cabarrus County. Public sewer main will convey yo Rocky River Regional WWTP. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes Q No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Fish 8 Wildlife Service Critical Habitat Portal 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes Q No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA Habitat Conservation EFH Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? North Carolina State Historic Preservation Office GIS Service (http: / /gis.ncdcr.gov /hopwebn 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ❑X No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA Flood Map Service Center Lvalid Applicant/Agent's Printed Name Date pp ican gent's Signature (Agent's signatur is only if an authorization letter froof the applicant is provided.) Page 10 of 10 Open in The Natk l � t` mal Map Viewer _iervices December 27, 2010 City of Concord, Storm Water Services 850 Highway 601, South Concord, NC 28026 Attn: Doug Miller Re: IBP Phase I Lot 12 Required Storm Water Detention Dear Doug,-- a C C� C OdL� D NOV 0 5 2015 DENR - WATER RESOURCES 401 8 BUFFER PERMITTING This letter is to accompany the submittal of plans for Mass Grading and Erosion Control for International Business Park Phase I, Lot 12. Based on prior calculations presented and accepted for Lots 76t8 of Phase I for Existing Pond A, COC case No. 2278, the following site is grandfathered under the current stormwater ordinance and required to provide detention in accordance with the previous submittal for Pond A. The proposed site was calculated at a maximum of 90% impervious density and corresponding calculations for Pond A depict and anticipate that level of development. The current plans calls for mass grading with future development to add impervious area. At this time we wish to designate the connection of the prior case 2278 calculations in relation to lot 12. If you have additional questions or concerns please let me know. Y) CESI David F. Reese, PE ` d e, SSO N., IIV SEAL 18163 ��ee�oaeoer �Jw aw F. Nlhl'gJ 14�� i� 1�' NCSS • NSPS - ACSM • NSPE • PENC P,O, Box 268 • Concord, NC 28026 -0268 • 704 - 786 -5904 • Fax 704- 786 -7454 - 1- 800 -627 -1024 - www.cesiworld.com - m STORMWATER DETENTION CALCULATIONS FOR IBP SPECULATIVE BUILDING LOTS 7&8 CESI PROJECT 080515.010 DATE: OCTOBER 1, 200 REVISED: NOVEMBER 1 2, 2 PROJECT ENGINEER: ALEX RANKIN, PE PROJECT DESIGNER: MICHAEL GEE, El PO Box 268 CONCORD, NC 28026-0266 C A Ro A L 313 Hydraflowr Table of Contents Hydraflow Hydrographs by Intelisolve v9.22 080515.010 R8.gpw Thursday, Nov 12, 2009 10 -Year SummaryReport .................................................................................. ............................... 1 HydrographReports ............................................................................ ............................... 2 Hydrograph No. 1, SCS Runoff, Pre .................................................. ............................... 2 TR -55 Tc Worksheet ..................................................................... ............................... 3 Hydrograph No. 2, SCS Runoff, post ................................................ ............................... 4 TR -55 Tc Worksheet ..................................................................... ............................... 5 Hydrograph No. 3, Reservoir, Detention survey pond ....................... ............................... 6 PondReport - Surveyed Pond .................................................... ............................... 10 50 - Year SummaryReport ................................................................................ ............................... 12 HydrographReports .......................................................................... ............................... 13 Hydrograph No. 1, SCS Runoff, Pre ............................................... ............................... 13 Hydrograph No. 2, SCS Runoff, post .............................................. ............................... 14 Hydrograph No. 3, Reservoir, Detention survey pond ..................... ............................... 15 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cult) Hydrograph description 1 SCS Runoff 210.94 2 732 859,976 - -- — Pre 2 SCS Runoff 354.38 2 730 1,420,197 — — — post 3 Reservoir 206.37 2 746 1,420,193 2 648.51 450,275 Detention survey pond 080515.010 R8.gpw Return Period: 10 Year Thursday, Nov 12, 2009 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 1 Pre Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 2 min = 108.060 ac = 0.0% = TR55 = 5.10 in = 24 hrs * Composite (Area /CN) = [(3.350 x 98) + (51.110 x 70) + (53.600 x 71)] / 108.060 Hydrograph Discharge Table Time -- Outnow Time -- Outflow (min cfs) (min cfs) 704 22.63 776 32.73 706 27.91 778 31.57 708 35.01 780 30.51 710 44.55 782 29.55 712 57.14 784 28.68 714 73.47 786 27.88 716 93.19 788 27.16 718 114.68 790 26.50 720 136.11 792 25.89 722 156.33 794 25.33 724 174.88 796 24.80 726 190.82 798 24.30 728 203.03 800 23.82 730 210.23 802 23.36 732 210.94 << 804 22.92 734 205.34 806 22.50 736 195.58 808 22.09 738 184.06 810 21.70 740 172.07 812 21.32 742 159.70 744 147.04 ... End 746 134.19 748 121.26 750 108.38 752 95.70 754 83.43 756 71.93 758 61.66 760 53.12 762 46.89 764 42.93 766 40.47 768 38.63 770 36.95 772 35.41 774 34.01 2 Thursday, Nov 12, 2009 Peak discharge = 210.94 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of cons. (Tc) Distribution Shape factor 732 min 859,976 cuft 71* Oft 29.6 min Type II 484 ( Printed values >= 10.00% of Qp.) TR55 Tc Worksheet 3 Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 1 Pre Description A B C Totals Sheet Flow = 500.00 0.00 0.00 Manning's n -value = 0.150 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two -year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope ( %) = 2.00 0.00 0.00 Travel Time (min) = 22.56 + 0.00 + 0.00 = 22.56 Shallow Concentrated Flow Flow length (ft) = 500.00 0.00 0.00 Watercourse slope ( %) = 2.60 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 2.60 0.00 0.00 Travel Time (min) = 3.20 + 0.00 + 0.00 = 3.20 Channel Flow X sectional flow area (sqft) = 108.00 0.00 0.00 Wetted perimeter (ft) = 24.00 0.00 0.00 Channel slope ( %) = 2.07 0.00 0.00 Manning's n -value = 0.050 0.015 0.015 Velocity (ft/s) = 11.75 0.00 0.00 Flow length (ft) = 2709.0 0.0 0.0 Travel Time (min) = 3.84 + 0.00 + 0.00 = 3.84 TotalTravel Time, Tc ............................................... ............................... 29.60 min Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 2 post Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 2 min = 116.370 ac = 0.0% = TR55 = 5.10 in = 24 hrs Composite (Area/CN) = [(55.470 x 98) + (14.380 x 70) + (46.520 x 71)] / 116.370 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 698 37.00 770 52.53 700 41.70 772 50.26 702 47.99 774 48.19 704 56.23 776 46.31 706 66.83 778 44.60 708 80.68 780 43.05 710 98.61 782 41.64 712 121.30 784 40.35 714 149.47 786 39.19 716 182.21 788 38.13 718 216.80 790 37.16 720 250.41 792 36.27 722 281.30 794 35.44 724 308.72 726 331.18 ...End 728 347.00 730 354.38 << 732 351.40 734 338.76 736 319.96 738 298.66 740 276.78 742 254.52 744 232.08 746 209.65 748 187.44 750 165.68 752 144.62 754 124.57 756 106.12 758 89.94 760 76.76 762 67.33 764 61.42 766 57.76 768 55.02 4 Thursday, Nov 12, 2009 Peak discharge = 354.38 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 730 min 1,420,197 cuft 84* Oft 29.6 min Type II 484 ( Printed values >= 10.00% of Qp.) 5 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 2 post Description A B C Totals Sheet Flow Manning's n -value = 0.150 0.011 0.011 Flow length (ft) = 300.0 0.0 0.0 Two -year 24 -hr precip. (in) = 3.50 0.00 0.00 Land slope ( %) = 2.00 0.00 0.00 Travel Time (min) = 22.56 + 0.00 + 0.00 = 22.56 Shallow Concentrated Flow Flow length (ft) = 500.00 0.00 0.00 Watercourse slope ( %) = 2.60 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 2.60 0.00 0.00 Travel Time (min) = 3.20 + 0.00 + 0.00 = 3.20 Channel Flow X sectional flow area (sqft) = 108.00 0.00 0.00 Wetted perimeter (ft) = 24.00 0.00 0.00 Channel slope ( %) .= 2.07 0.00 0.00 Manning's n -value = 0.050 0.015 0.015 Velocity (ft/s) = 11.75 0.00 0.00 Flow length (ft) = 2709.0 0.0 0.0 Travel Time (min) = 3.84 + 0.00 + 0.00 = 3.84 TotalTravel Time, Tc ............................................... ............................... 29.60 min F Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 29.40 Thursday, Nov 12, 2009 Hyd. No. 3 -= --= 21.39 -- -- -- -- Detention survey pond 694 31.15 Hydrograph type = Reservoir Peak discharge = 206.37 cfs Storm frequency = 10 yrs Time to peak = 746 min Time interval = 2 min • Hyd. volume = 1,420,193 cuft Inflow hyd. No. = 2 - post Reservoir name = Surveyed Pond Max. Elevation = 648.51 ft Max. Storage = 450,275 cuft Storage Indication method used. - -- -- 24.67 - - -- -- -- - -- Hydrograph Discharge Table 700 cPdncedvaiues- 10.00 %ofQp.l Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C . Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 692 29.40 643.72 33.65 - -- -= --= 21.39 -- -- -- -- 21.39 694 31.15 643.75 33.65 - - -- -- -- 22.33 - -- -- - -- 22.32 696 33.59 643.77 33.65 - - -- -- - -- 23.38 - -- - -- - - -= - -- 23.38 698 37.00 643.80 33.65 - - -- - -- -- 24.67 - - -- -- -- - -- 24.67 700 41.70 643.84 33.65 - - -- -- - -- 26.31 ---- -- - - -- 26.31 702 47.99 643.89 33.65 - - -- - - -- - -- 28.38 -- - -_ -- - -- 28.38 ' 704 56.23 643.94 33.68 - - - -- -- -- 31.14 -- - -- = -- --- 31.14 706 66.83 644.02 33.93 - - -- -- - -- 33.93- - -- --- - - -- 33.93 708 80.68 644.09 34.93 - - -- -- -- 34.93 -- -- --- - - -- 34.93 710 98.61 644.19 35.84 - -- -- - - -- 35.84 - -- -- - - - -- 35.84 712 121.30 644.33 36.74 - -- -- -- 36.74 -- -- - - - -- 36.73 714 149.47 644.52 37.69 - -- - - - -- 37.69 - -- - -- - - - -- 37.69 716 182.21 644.76 38.69 = -- -- -- 38.69 - -- - - - -- 38.69 718 216.80 645.05 39.73 - - -- -- - -- 39.73 -- ----- - - - - -- 39.73 720 250.41 645.33 40.66 - -- -- -- 40.65 - - -- - - - -- 40.65 722 281.30 645.66 41.66 - -- - - -- - - -- 41.65 - =- -- - - -- ----- 41.65 724 308.72 646.03 42.72 -- - - -- - -- 42.70 -- - -- - -- - 42.70 726 331.18 646.39 43.70 - - -- - - -- -- 43.70 - --- --- - - - - -- - 43.70 728 347.00 646.75 44.66 - -- -- -- 44.62 - - - -- _ - - - - -- =- 44.62 730 354.38 « 647.10 45.55 - - -- =- - - -- 45.51 - - -- - - -- - - - -- - - -- 45.51 732 351.40 647.44 46.42 - -- -- - - -- 46.37 8.012 - - - -- - -- 54.38 734 338.76 647.75 47.19 - = -- -- - - -- 47.13 36.82 -- - - - -- - -- 83.95- 736 319.96 648.01 47.81 - -- -- - - -- - 47.76 71.68 -- - -- - - -- 119.44 738 298.66 648.21 48.28 - -- -- -- - -- ' 48.20 103.11 - -- - - -- - - - -- 151.31 740 276.78 648.35 48.62 -- - -- - -- 48.51 126.62 - - -- - - -- - - - -- 175.13 742 254.52 648.44 48.83 - -- - - -- ----- 48.73 144.19 - - - -- - - -- - - - -- 192.92 744 232.08 648.49 48.96 -- - =- = -- 48.85 153.97 - - - -- - -- - - - -- 202.82 746 209.65 648.51 << 49.00 - -- - = -- - - -- 48.90 157.47 - - -- - -- - - - -- 206.37 << 748 187.44 648.50 48.98 - - -- - -- - - - -- 48.88 155.95 - - -- - -- - -- 204.83 750 165.68 648.47' 48.91 - -- - -- - - -- 48.81 150.47 - -- - - - -- - - -- 199.28 752 144.62 648.43 48.81 - - =- -- - - -- 48.70 141.90 -- - - - -- - -- 190.61 754 124.57 648.37 48.67 - - -- - - - -- - - -- 48.57 131.04 - -- - - - -- - -- 179.60 756 106.12 648.31' 48.52 - -- - - - -- - -- 48.42 119.33 -- - - -- - -- 167.75 758 89.94 648.23 48.34 -- - - - -- - - -- 48.26 107.41 -- - - - -- - -- 155.67 760 76.76 648.16 48.17 - - - - -- - -- - 48.10 95.05 - -- - - - - -- -- 143.14- 762 67.33 648.09 47.99 - -- - - -- - - - - -- 47.94 82.89 - - - -- - - - -- 764 61.42 648.02. 47.82 - --- - - - -- 47.77 72.42 - - -- - - - -- - - -- 120.20 766 57.76 647.95 47.67 - - -- --- - - - -- 47.62 63.76 - - -- - - - -- - - - -- 111.38 768 55.02 647.90 47.53 - - -- - - - -- -- 47.48 55.90 - - - -- =-- - - -- 103.38 770 52.53 647.84 47.40 - -- - - -- -- 47.35 48.81 - - -- - - -- - - - -- 96.16 Continues on next page... 7 Detention survey pond Hydrograph Discharge Table Time Inflow Elevation CIv A Clv B Clv C PfRsr Wr A Wr B Wr C ' Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 772 50.26 647.80 47.29 - -- -- - -- 47.23 42.41 -- - -- - -- 89.65 774 48.19 647.75 47.19 -- - -- -- 47.13 36.85 83.97 776 46.31 647.71 47.09 - -- - -- 47.03 32.98 -- -- - - -- 80.01 778 44.60 647.68 47.00 - - - - -- - - -- 46.94 29.34 --- - -- - - -- 76.28 780 43.05 647.64 46.91 - - - -- - - -- 46.86 25.92 - -- - -- -- 72.78 782 41.64 647.61 46.83 -- , - - - -- - - - -- 46.78 22.71 - - -- - -- - - -- 69.50 784 40.35 647.58 46.76 - -- - - -- - - -- 46.71 19.71 - - -- - -- -- 66.42 786 39.19 647.55 46.69 - - -- - - -- - - -- 46.64 16.90 - - -- - - -- -- 63.54 788 38.13 647.52 46.62 - - -- - - -- - -- 46.57 14.28 - -- - -- -- 60.86 790 ' 37.16 647.50 46.56 - - -- - - -- - - -- 46.51 11.84 58.35 792 36.27 647.48 46.50 - -- - - -- - - -- 46.46 9.562 - -- -- - -- 56.02 794 35.44 647.45 46.45 - ------ - - - -- 46.40 8.407 - - -- -- -- 54.81 796 34.67 647.43 46.39 -- - - -- - - - -- 46.35 7.737 - -- - - -- 54.09 798 33.94 647.41 46.34 - -- - - -- - - -- 46.29 7.067 - -- - - -- 53.36 800 33.24 647.39 46.28 - -- - - - -- - - - -- 46.24 6.395 - -- - -- 52.63 802 32.57 647.37 46.23 - -- - - -- - - -- 46.18 5.727 - -- - - -- 51.91 804 31.93 647.35 46.17 -- - - -- - - -- 46.13 5.059 - -- - - -- 51.19 806 31.31 647.32 46.12 _ - -- - - - -- - - -- 46.07 4.394 - -- - - -- 50.47. 808 30.72 647.30 46.06 -- - - - -- - - - -- 46.02 3.735 --- - - -- 49.76. 810 30.15 647.28 46.01 - - -- - -- 45.97 3.080 - -- - -- - -- . 49.05 812 29.60 647.26 45.96 - -- =- -- 45.91 2.428 - -- - - - -- - -- 48.34 814 29.07 647.24 45.90 - - -- - -- 45.86 1.783 - -- - - -- - -- 47.64 816 28.55 647.22 45.85 - -- - -- 45.81 1.144 - -- - - - -- - -- 46.95 818 28.05 647.20 45.80 - - - -- - -- - - -- 45.76 0.511 - -- - - - -- - -- 46.27 820 27.57 647.18 45.75 - - - -- -- - - -- 45.70 -- - -- - - -- -- 45.70 . 822 27.10 647.16 45.69 - - - -- - -- - - -- . 45.65 - -- - - -, - - -- -- 45.65 824 26.65 647.13 45.64 - - - -- - -- 45.60 -,- - - -- - - -- - -- 45.60 826 26.21 647.11 45.59 - - - -- - -- - -- 45.54 -- - - - -- - - -- - 45.54 828 25.78 647.09 45.53 - - - -- - - -- - - -- -45.48 - -- - - - -- - -- -- 45.48 830 25.36 647.07 45.47 - - -- - - - -- - - -- 45.42' - - -- - - - -- 45.42 832 24.95 647.05 45.41 - -- - - -- - - - -- 45.37 - -- --- -- - - -- 45.37 834 24.55 647.02 45.35 -- - - - -- -- 45.31 - -- -- - -- - -- 45.31 836 24.16 647.00 45.29 -- - -- - - -- 45.24 - - -- --- - - -- - -- 45.24 838 23.77 646.97 45.23 - - -- -- - -- 45.18 - -- - -- - - -- - -- 45.18 840 23.40 646.95 45.17 - - - -- ----- - -- -45.12 - -- - - -- - - - -- - - -- 45.12 842 23.03 646.93 45.10 - - - -- - - -- -- 45.05 -- - - - -- - - - -- - - -- 45.05 844 22.67 646.90 45.04 - - - -- - - -- - -- 44.99 -- - - - -- - - - -- - - -- 44.99 846 22.32 646.87 44.97 - - - -- - - - -- - -- 44.93 - -- - - - -- - - - -- - - -- 44.93 848 21.98 646.85 44.91 - - -- - - -- - - -- 44.86 - -- - - -- - - - -- - - - -- 44.86 850 21.65 646.82 44.84 - -- -- - -- 44.80 - - -- -- - -- - - - -- 44.80 852 21.34 646.80 44.77 -- - -- -- 44.73 - - - -- - -- - - -- - - - -- 44.73 854 21.04 646.77 44.70 ` - -- - - - -- -- 44.66 -- 7- - - -- -- - - -- 44.66 856 20.76 646.74 44.63 - -- - - - -. -- 44.60 -- - - -- -- - -- 44.60 858 20.50 646.72 44.56 - - - -- - - -- - - -- 44.53 - -- - - - -- - -- - -- 44.53 860 20.25 646.69 44.49 - - - -- - - - - -- - - -- 44.46 - --- ----- - - -- - - -- 44.46 862 20.03 646.66 44.42 - - - -- - - -- - -- 44.39 - - -- - - - -- - - - -- - -- 44.39 864 19.82 646.63 44.34 -- -- - -- 44.32 - - - -- - - - -- - - - -- - - -- 44.32 866 19.62 646.61 44.27 - -- -= 44.25 - - - -- - - -- - - - -- - - -- 44.25 868 19.44 646.58 44.19 - -- - -- -- 44.16 - - -- - - -- - - - -- - - -- 44.16 870 19.27 646.54 44.10 - - - -- - - -- - - - -- 44.07 - - -- - - - -- - -- 44.07 872 19.11 646.51 44.02 - -- - - - -- - -- 43.98 - - - -- - - -- - -- - - -- 43.98 874 18.96 646.48. 43.93 - - - -- 43.90 - - - -- - -- - - - -- 43.90 876 18.82 646.45 - 43.84 - -- - -- 43.83 - - -- _ - - -- - - -- 43.83 878 18.68 646.41 43.76 - - -- - - -- 43.75 - -- - - -- _ - - -- 43.75 Continues on next page... 8 Detention survey pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 880 18.55 646.38 43.67 - - -- - -- - 43.66 - - -- - - -- ----- - - - -- 43.66 882 18.42 646.35 43.58 - - -- - -- -- 43.57 - - - -- - - -- - - - -- - - - -- 43.57 884 18.30 646.31 43.49 - - - -- - - -- -- 43.48 -- - - -- - - -- - -- 43.48 886 18.18 646.28 43.40 - - -- - -- - - - -- 43.39 -- - - -- - - -- - - -- 43.39 888 18.06 646.25 43.31 - - -- - - -- - - - -- 43.29 - - - - -- - - - -- - - -- 43.29 890 17.94 646.22 43.22 - -- - -- - - - -- 43.20 -- - - - -- - - -- - - -- 43.20 892 17.82 646.18 43.13 - -- - - - -- - - -- 43.12 -- - - - -- - - - -- - - - -- 43.12 894 17.70 646.15 43.04 - -- - -- - -- 43.02 - -- - - -- - - -- - - -- 43.02 896 17.58 646.12 42.95 - -- - - - -- - -- 42.92 - - -- - - - -- - - - -- - - - -- 42.92 898 17.46 646.08 42.86 -- - -- -- 42.83 -- - - -- - - -- - - -- 42.83 900 17.34 646.05 42.77 - -- - - - -- - - -- 42.74 - -- - - - -- - - -- - - - -- 42.74 902 17.22 646.02 42.67 -- - -- - - - -- 42.66 -- - - - -- - -- - -- 42.66 904 17.10 645.98 42.57 - -- - - -- - - - -- 42.56 -- - - - -- - -- - - -- 42.56 906 16.98 645.95 42.47 - -- - - -- - - -- 42.45 -- - - -- - -- - -- 42.45 908 16.85 645.91 42.36 - -- - -- - -- 42.34 - -- - - - -- -- -- 42.34 910 16.73 645.87 42.25 - -- - - - -- - - -- 42.24 - - -- - -- - -- -- 42.24 912 16.61 645.83 42.15 - -- - -- - -- 42.14 -- - - -- - - - -- 42.14 914 16.49 645.80 42.04 - - -- - - -- - - - -- 42.03 - - - -- - - -- - -- - -- 42.03 916 16.37 645.76 41.93 - -- - - -- - - -- 41.92 -- - - -- ----- -- 41.92 918 16.25 645.72 41.82 - - -- - -- - -- 41.81 - -- - -- - -- - 41.81 920 16.13 645.68 41.71 - - -- - -- - - -- 41.70 -- - -- -- -- 41.70 922 16.01 645.64 41.60 - - -- -- = 41.59 - - -- - - -- - -- -- 41.59 924 15.88 645.61 41.49 - - -- - -- 41.48 - -- - - -- - -- - - -- 41.48 926 15.76 645.57 41.38 - - -- - - 41.37 - - -- - -- - -- - - -- 41.37 928 15.64 645.53 41.26 - - -- - ---- 41.25 - - - -- -- -- - -- 41.25 930 15.52 645.49 41.15 - - -- -- -- 41.14 - - - -- -- - - -- - - -- 41.14 932 15.40 645.46 41.03 - - -- - - 41.02 - - -- -- - - -- - - -- 41.02 934 15.27 645.42 40.92 - - -- - - 40.91 - - -- -- - - -- - - -- 40.91 936 15.15 645.38 40.80 - - -- - -- -- 40.79 - - - -- - -- - - -- - - - -- 40.79 938 15.03 645.34 40.69 - - -- -- - 40.67 - - - -- - - -- - - -- - - - -- 40.67 940 14.91 645.30 40.57 - -- - -- - - - -- 40.56 -- - - -- - - -- - - - -- 40.56 942 14.78 645.27 40.45 - -- - - - -- - - - -- 40.44 -- - - -- - - - - -- 40.44 944 14.66 645.23 40.33 - - -- - - -- - - -- 40.32 -- - -- - - 40.32 946 14.54 645.19 40.21 - -- - -- - - -- 40.20 - -- - - -- - -- 40.20 948 14.42 645.15 40.08 - - -- -- -- 40.08 - -- - -- - - 40.08 950 14.29 645.12 39.96 - - - -- - -- 39.95 - - - -- - -- - -- -- 39.95 952 14.17 645.08 39.83 - - -- - - 39.83 - - - -- -- -- - 39.83 954 14.05 645.04 39.70 - -- - -- -- 39.70 - - - -- - - -- - -- - -- 39.70 956 13.92 645.00 39.58 - -- - -- - - -- 39.57 -- - - - -- - - -- - -- 39.57 958 13.80 644.95 39.41 - -- - - - -- - - - -- 39.41 -- - - - -- - - -- - - -- 39.41 960 13.68 644.91 39.24 - -- - - - -- - - - -- 39.24 -- - - -- - -- - - - -- 39.24 962 13.56 644.86 39.06 - -- - - - -- - - - -- 39.06 - -- - - - -- - -- - - - -- 39.06 964 13.43 644.81 38.89 - - - -- - - -- - - - -- 38.88 - - -- - - -- - -- - - - -- 38.88 966 13.31 644.76 38.70 - - -- -- - - -- 38.70 - - - -- -- - - - - -- 38.70 968 13.20 644.71 38.52 - - -- -- -- 38.51 - - -- -- -- - - -- 38.51 970 13.08 644.67 38.32 - -- -- - 38.32 -- - -- - - - - -- 38.32 972 12.97 644.62 38.13 - -- - - - -- - - -- 38.12 - -- - -- - -- - - -- 38.12 974 12.87 644.57 37.92 - -- - - - -- - - - -- 37.92 -- - -- - - -- 37.92 976 12.77 644.52 37.71 - -- - - - -- - - - -- 37.71 - - -- - - - -- -- - 37.71 978 12.67 644.48 37.49 - - -- - - -- - - -- 37.49 - - - -- - -- - -- - 37.49 980 12.59 644.43 37.26 - - -- - - -- 37.26 - -- - - -- - - - -- -- 37.26 982 12.51 644.38 37.02 - -- -- -- 37.02 -- - - -- - - -- - - -- 37.02 984 12.43 644.34 36.76 - -- - - - -- - - -- 36.76 -- - -- - -- - - -- 36.76 986 12.36 644.29 36.50 - -- - - - -- - -- 36.49 ----- - -- - - -- - - -- 36.49 Continues on next page... Detention survey pond Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs . cfs cfs cfs cfs cfs 988 12.29 644.25 36.20 - - - -- - - -- - - -- 36.20 - -- - - -- - -- - - -- 36.20 990 12.23 644.20 35.90 - - - -, - - -- - - - =- 35.90 - - -- - - -- - -= --- 35.90 992 12.18 644.16 35.53 - -- - - - -- - - - -- 35.53 - - -- - - -- - -- - -- 35.53 994 12.12 644.11 35.17 - -- - - -- - - -- 35.16 - - -- - -- . - -- - - - -- 35.16 996 12.07 644.07 34.64 - -- - -- - - -- 34.64 -- -- - - -- - -- 34.64 998 12.02 644.03 34.07 - - -- - -, - -- 34.07 -- -- - -- - - -- 34.07 1000 11.97 643.98 33.70 - -- -- - -- 32.79 -- - - -- - -- - - -- 32.79 1002 11.93 643.93 33.67 - -- - - -- - - - -- 30.35 - - - -- - - -- - -- - - -- 30.35 1004 11.89 643.88 33.65 - -- - - -- - - - -- 28.22 - - -- - - -- - -- - - -- 28.22 1006 11.84 643.84 33.65 - -- - - -- - - - -- 26.39 - - - -- - - -- - -- - - - -- 26.39. 1008 11.80 643.80 33.65 -- - -- - -- 24.76 - - -- - -- - -= - -- 24.76 1010 11.76 643.77 33.65 - - -- - - -- - - - -- 23.36 - - -- - - -- - -= - - -- 23.36 1012 11.71 643.74 33.65 - -- - -- -- 22.13 - - - -- - - -- - -- - -- 22.13 1014 11.67 643.72 33.65 - -- - -- -- 21.03 - - -- - ---- - -- - -- 21.03 End Pond Report 10 Hydraflow Hydrographs by Intelisolve v9.22 Thursday, Nov 12, 2009 Pond No. 2 - Surveyed Pond Pond Data Contours - User - defined contour areas. Conic method used for volume calculation. Begining Elevation = 642.95 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 642.95 38,700 0 0 1.05 644.00 51,693 47,287 47,287 2.05 645.00 76,004 63,453 110,740 3.05 646.00 86,916 81,391 192,131 3.65 646.60 97,597 55,315 247,446 6.55 649.50 115,000 307,893 555,338 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 Inactive Inactive Inactive Crest Len (ft) = 9.42 34.90 Inactive Inactive Span (in) = 24.00 0.00 0.00 0.00 Crest El. (ft) = 642.95 647.29 0.00 0.00 No. Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 637.00 0.00 0.00 0.00 Weir Type = Riser Ciplti - - Length (ft) = 90.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope ( %) = 1.10 0.00 0.00 n/a N -Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in /hr) = 0.000 (by Wet area) Multistage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orltice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (a). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfll User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 642.95 0.00 -- - -- 0.00 0.00 -- - -- - 0.000 0.10 4,729 643.06 33.65 is - - -- 1.07 0.00 -- - - - 1.067 0.21 9,457 643.16 33.65 is -- - - -- 3.02 0.00 -- - - - 3.018 0.31 14,186 643.27 33.65 is - - -- 5.54 0.00 - - - - 5.544 0.42 18,915 643.37 33.65 is -- - -- 8.54 0.00 - - - - 8.536 0.52 23,643 643.47 33.65 is -- - - 11.93 0.00 - - -- - 11.93 0.63 28,372 643.58 33.65 is -- - - 15.68 0.00 -- - - - 15.68 0.73 33,101 643.68 33.65 is - - -- 19.76 0.00 - - -- - - 19.76 0.84 37,829 643.79 33.65 is - - - 24.14 0.00 - -- - - 24.14 0.94 42,558 643.89 33.65 is - - - 28.81 0.00 - - - -- 28.81 1.05 47,287 644.00 33.72 is - - -- 33.72s 0.00 - - - - 33.72 1.15 53,632 644.10 35.07 is - - - 35.07s 0.00 - - - - 35.07 1.25 59,977 644.20 35.90 is - - -- 35.90s 0.00 - - - - 35.90 1.35 66,323 644.30 36.56 is - - - 36.56s 0.00 - - -- - 36.56 1.45 72,668 644.40 37.12 is - - -- 37.11 s 0.00 - - -- - 37.11 1.55 79,013 644.50 37.61 is - - - 37.61 s 0.00 - - - - 37.61 1.65 85,359 644.60 38.05 is -- - - 38.05s 0.00 - - - - 38.05 1.75 91,704 644.70 38.47 is -- - - 38.46s 0.00 -- - - - 38.46 1.85 98,049 644.80 38.85 is - -- - 38.85s 0.00 -- - - - 38.85 1.95 104,394 644.90 39.22ic - - -- - 39.22s 0.00 -- -- - - 39.22 2.05 110,740 645.00 39.57 is - - - 39.57s 0.00 - -- - - 39.57 2.15 118,879 645.10 39.91 is - - -- 39.90s 0.00 - -- - - -- 39.90 2.25 127,018 645.20 40.24 is - - -- 40.23s 0.00 - - -- - - -- 40.23 2.35 135,157 645.30 40.55 is - - - -- 40.54s 0.00 - -- - -- 40.54 2.45 143,296 645.40 40.87 is - - - -- 40.85s 0.00 - -- - -- 40.85 2.55 151,435 645.50 41.17 is - - - 41.16s 0.00 - - -- - -- 41.16 2.65 159,574 645.60 41.47 is - - - 41.46s 0.00 - - -- - - -- 41.46 2.75 167,713 645.70 41.76 is - - - 41.75s 0.00 - - - -- 41.75 2.85 175,852 645.80 42.05 is - -- - -- -- 42.05s 0.00 - - - - 42.05 2.95 183,992 645.90 42.34 is - -- - 42.31 s 0.00 - - -- - 42.31 3.05 192,131 646.00 42.62 is - - -- 42.61 s 0.00 - - - - 42.61 3.11 197,662 646.06 42.79 is - - -- 42.77s 0.00 - - - - 42.77 3.17 203,194 646.12 42.96 is - - - 42.93s 0.00 - - - - 42.93 3.23 208,725 646.18 43.12 is - - - 43.11 s 0.00 - -- - - 43.11 3.29 214,257 646.24 43.29 is - - - 43.26s 0.00 - - - - 43.26 3.35 219,788 646.30 43.45 is -- - 43.44s 0.00 - - -- - 43.44 Continues on next page... Surveyed Pond Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B ft cult ft cfs cfs 3.41 225,320 646.36 43.61 is - 3.47 230,851 646.42 43.78 is - 3.53 236,383 646.48 43.94 is - 3.59 241,914 646.54 44.10 is - 3.65 247,446 646.60 44.26 is - 3.94 278,235 646.89 45.01 is - 4.23 309,024 647.18 45.76 is - -- 4.52 339,814 647.47 46.49 is -- 4.81 370,603 647.76 47.20 is - 5.10 401,392 648.05 47.91 is - 5.39 432,181 648.34 48.60 is - 5.68 462,971 648.63 49.28 is - 5.97 493,760 648.92 49.95ic - 6.26 524,549 649.21 50.61 is -- 6.55 555,338 649.50 51.27 is -- ...End Clv C cfs PrfRsr Wr A Wr B Wr C cfs cfs cfs cfs - 43.61s 0.00 - - 43.77s 0.00 - - 43.90s 0.00 -- - 44.06s 0.00 -- - 44.24s 0.00 -- - 44.96s 0.00 - - 45.71 s 0.00 - - 46.44s 8.87 - -- 47.14s 37.44 - -- 47.86s 76.98 - - 48.49 s 125.02 - - 49.18 s 180.24 - - 49.81 s 241.81 - - 50.56 s 309.14 - - 51.20 s 381.83 - 11 Wr D ELI User Total cfs cfs cfs cfs -- - - 43.61 - -- - 43.77 -- - 43.90 - -- -- 44.06 - - -- -- 44.24 - 44.96 - -- -- 45.71 - - -- 55.31 -- -- 84.58 - - - 124.84 173.51 - - 229.42 - - - 291.62 - - - 359.70 -- - - 433.02 12 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 347.63 2 730 1,394,755 — -- Pre 2 SCS Runoff 516.63 2 730 2,091,061 — — post 3 Reservoir 389.99 2 740 2,091,056 2 649.34 537,267 Detention survey pond 080515.010 R8.gpw Return Period: 50 Year Thursday, Nov 12, 2009 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 1 Pre Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 50 yrs = 2 min = 108.060 ac = 0.0% = TR55 = 6.80 in = 24 hrs * Composite (Area/CN) = [(3.350 x 98) + (51.110 x 70) + (53.600 x 71)] / 108.060 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 702 38.35 774 51.85 704 45.66 776 49.87 706 55.17 778 48.07 708 67.80 780 46.43 710 84.44 782 44.94 712 105.96 784 43.58 714 133.29 786 42.35 716 165.70 788 41.23 718 200.50 790 40.21 720 234.79 792 39.26 722 266.76 794 38.39 724 295.66 796 37.57 726 319.98 798 36.80 728 337.96 800 36.06 730 347.63 << 802 35.35 732 346.86 734 336.09 ... End 736 318.84 738 298.91 740 278.29 742 257.17 744 235.71 746 214.09 748 192.51 750 171.17 752 150.34 754 130.33 756 111.75 758 95.29 760 81.74 762 71.94 764 65.75 766 61.91 768 59.04 770 56.42 772 54.03 13 Thursday, Nov 12, 2009 Peak discharge = 347.63 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 730 min 859,976 cuft 71* Oft 29.6 min Type II 484 ( Printed values >= 10.00% of Qp.) Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 2 post Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 50 yrs = 2 min = 116.370 ac = 0.0% = TR55 = 6.80 in = 24 hrs * Composite (Area/CN) _ [(55.470 x 98) + (14.380 x 70) + (46.520 x 71)] / 116.370 Hydrograph Discharge Table Time -- Outflow Time -- Outflow (min cfs) (min cfs) 696 53.79 768 77.27 698 59.02 770 73.74 700 66.19 772 70.53 702 75.78 774 67.60 704 88.27 776 64.94 706 104.25 778 62.53 708 125.03 780 60.33 710 151.73 782 58.34 712 185.23 784 56.53 714 226.44 786 54.88 716 273.94 788 53.38 718 323.78 790 52.01 720 371.91 722 415.85 ...End 724 454.55 726 485.87 728 507.39 730 516.63 << 732 510.99 734 491.57 736 463.44 738 431.80 740 399.39 742 366.51 744 333.46 746 300.55 748 268.07 750 236.36 752 205.78 754 176.77 756 150.18 758 126.97 760 108.14 762 94.72 764 86.33 766 81.15 14 Thursday, Nov 12, 2009 Peak discharge = 516.63 cfs Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor 730 min 1,420,197 cuft 84* Oft 29.6 min Type II 484 ( Printed values - 10.00% of Op.) 15 Hydrograph Report Hydraflow Hydrographs by Intelisolve v9.22 Hyd. No. 3 Detention survey pond Hydrograph type = Reservoir Storm frequency = 50 yrs Time interval = 2 min Inflow hyd. No. = 2 - post Max. Elevation = 649.34 ft Storage Indication method used. _ Hydrograph Discharge Table Peak discharge Time to peak Hyd. volume Reservoir name Max. Storage . Thursday, Nov 12, 2009 = 389.99 cfs = 740 min = 1,420,193 cuft = Surveyed Pond = 537,267 cuft ( Printed values >= 10.00% of Qp.) Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 712 185.23 645.03 39.67 -- - -- - 39.67 - - - -- - - -- - -- - 39.67 714 226.44 645.28 40.47 - -- - - -- - 40.46 - - - -- -- - -- - 40.46 716 273.94 645.58 41.42 - - - -- - - -- -- 41.41 -- - -- - -- - 41.41 718 323.78 645.96 42.52 - - - -- - - -- - -- 42.50 - -- -- - 42.50 720 371.91 646.36 43.62 - - - -- - - -- -- 43.62 - -- -- -- 43.62 722 415.85 646.79 44.75 - - - -- - - -- - -- 44.71 -- - -- - - -- - -- 44.71 724 454.55 647.23 45.88 - -- - -- - -- 45.84 1.525 - -- - -- - - -- 47.36 726 485.87 647.69 47.03 - - -- - - - -- - - - -- 46.98 30.61 - -- - - - -- - - -- 77.58 728 507.39 648.13 48.10 -- - - -- - -- 48.03 90.24 - -- - - -- - - -- 138.27 730 516.63 << 648.51 49.01 -- - -- - - -- 48.90 158.08 - - -- - -- - - -- 206.98 732 510.99 648.82 49.73 -- - - -- 49.60 221.48 - -- -- - - - -- 271.08 734 491.57 649.05 50.26 - - - - -- 50.16 273.13 -- - -- - - - -- 323.29 736 463.44 649.21 50.61 - -- - - -- 50.56 308.86 - -- -- - - - -- 359.42 738 431.80 649.30 50.81 - -- -- 50.75 330.71 - - - -- -- - - - -- 381.45 740 399.39 649.33 << 50.88 -- - -- -- 50.82 339.16 - - -- - -- - - - -- 389.99 << 742 366.51 649.32 50.87 -- -- -- 50.81 337.42 - - -- -- - - - -- 388.23 744 333.46 649.28 50.78 -- - -- - -- 50.73 327.94 - - -- -- - - - -- 378.67 746 300.55 649.22 50.65 ---- - - - -- 50.59 312.65 -- - -- - - -- 363.25 748 268.07 649.15 50.47 - -- - - -- - - -- 50.39 294.13 - - -- - -- - - -- 344.53 750 236.36 649.05 50.26 - - - - -- 50.15 272.75 - -- -- - - -- 322.91 752 205.78 648.95 50.02 -- -- - - -- 49.89 249.15 - -- - -- - - -- 299.05 754 176.77 648.84 49.77 -- -- - - -- 49.64 225.54 - - -- - -- - - -- 275.17 756 150.18 648.73 49.51 -- -- - - -- 49.40 201.62 - -- - -- - - -- 251.02 758 126.97 648.62 49.25 -- - - - -- 49.15 177.81 - - -- -- - - - -- 226.96 760 108.14 648.51 48.99 -- -- - -- 48.88 156.58 - - -- -- - - - -- 205.46 762 94.72 648.40 48.74 -- - - -- - - - -- 48.63 136.38 - - -- - -- - - -- 185.02 764 86.33 648.30 48.51 -- - -- - -- 48.41 118.88 - -- - -- - - -- 167.29 766 81.15 648.22 48.30 - - - -- - - -- - - -- 48.22 104.59 - -- - -- - - -- 152.81 768 77.27 648.14 48.12 - -- - - -- -- 48.06 92.00 - -- - -- - - - -- 140.06 770 73.74 648.07 47.96 - - -- - - - -- - -- 47.91 80.97 - -- - -- - - - -- 128.88 772 70.53 648.01 47.82 - - - -- - - -- - -- 47.77 72.21 - - -- - -- - - - -- 119.97 774 67.60 647.96 47.69 - - - -- - - - -- -- 47.64 64.92 - - -- -- - - - -- 112.57 776 64.94 647.91 47.57 - - - -- - - -- =- 47.52 58.31 - - -- - -- - - - -- 105.83 778 62.53 647.87 47.47 - - -- - - - -- - 47.41 52.29 - - -- -- - - - - -- 99.71 780 60.33 647.83 47.37 - - - -- - - - -- -- 47.31 46.82 - - -- - -- - - - -- 94.14 782 58.34 647.79 47.28 - - -- - - -- - -- 47.22 41.85 - - -- -- - - - -- 89.07 784 56.53 647.76 47.20 -- - -- - - - -- 47.14 37.36 - - -- - -- - - - -- 84.50 786 54.88 647.73 47.12 -- - -- - - - -- 47.07 34.32 - - -- - -- - - - -- 81.39 788 53.38 647.70 47.05 --- - -- - - - -- 47.00 31.45 - -- - -- - - -- 78.45 790 52.01 647.67 46.98 - -- - - - -- 46.93 28.74 - - -- - -- - - -- 75.67 Continues on next page... 16 Detention survey pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 792 50.76 647.65 46.92 - - - -- - -- - -- 46.87 26.18 - -- ----- - - -- 73.05 794 49.59 647.62 46.86 - - -- -- - - -- 46.81 23.78 -- " - - - - -- 70.58 796 48.50 647.60 46.80 - - - -- - -- - - - -- 46.75 21.50 - - -- -- - - - -- 68.26 798 47.47 647.58 46.75 -- - -- - - -- 46.70 19.37 - -- - -- - - -- 66.07 800 46.48 647.56 46.70 -- - -- - -- 46.65 17.36 - -- - -- - -- 64.01 802 45.54 647.54 46.65 - - -- - - - -- -- 46.60 15.46 - - -- - - - -- - - -- 62.07 804 44.63 647.52 46.61 - - - -- - -- -- 46.56 13.67 - - -- - - - -- -- 60.23 806 43.76 647.50 46.56 - - -- -- - - -- 46.52 11.98 - - -- - - -- - -- 58.50 808 42.93 647.49 46.52 - - - -- - -- - - -- 46.48 10.39 - -- - -- ----- 56.87 810 42.12 647.47 46.49 - -- -- - - - -- 46.44 8.876 -- - - -- -- 55.32 '1812 41.35 647.45 46.45 - -- -- - - - -- 46.40 8.411 -- -- - -- 54.82 814 40.60 647.44 46.41 - - - -- - -- - - - -- 46.37 7.942 - -- - -- - -- 54.31 816 39.87 647.42 46.37 -- - -- - - - -- 46.33 7.465 - -- - -- - -- 53.79 818 39.17 647.41 46.33 -- - -- - - - -- 46.29 6.979 - - -- - -- - -- 53.27 820 38.49 647.39 46.29 -- - - -- - -- 46.25 6.490 - - -- -- - - - -- 52.74 822 37.83 647.38 46.25 -- - - -- -- 46.21 5.996 - - -- - - - -- 52.20 824 37.19 647.36 46.21 - -- - - -- -- 46.17 5.497 - - -- - - - -- 51.66 826 36.57 647.34 46.17 - -- - - - -- - -- 46.12 4.995 - - -- -- - - - -- 51.12 828 35.96 647.33 46.13 -- - - - -' - 46.08 4.491 - -- - - - - -- 50.57 830 35.37 647.31 46.09 - - -- - - - -- -- 46.04 3.985 - -- - - - - -- 50.03 832 34.80 647.29 46.04 - - -- - =- -- 46.00 3.478 - - -- - - - - -- 49.48 834 34.24 647.28 46.00 - - -- - - -- - -- 45.96 2.970 - - -- ----- - - - -- 48.93 836 33.69 647.26 45.96 - - -- - - - -- -- 45.92 2.462 - = -- -- ----- 48.38 838 33.15 647.24 45.92 - -- - - - -- - -- 45.87 1.954 - -- -- - - - -- 47.83 840 32.62 647.23 45.88 - -- - - -- -- 45.83 1.447 - - -- - -- - - - -- 47.28 842 32.10 647.21 45.83 - - -- - - - -- - - -- 45.79 0.941 - - -- - - -- - - - -- 46.73 844 31.59 647.19 45.79 - -- - -- - - -- 45.75 0.435 - -- - - - -- - - -- 46.19 846 31.10 647.18 45.75 -- -- - - -- 45.71 - - - -- -- - - -- - - - -- 45.71 848 30.62 647.16 45.71 - - -- - -- - - - -- 45.67 - - - -- - - -- - - - -- - - - -- 45.67 850 30.17 647.14 45.66 -- - -- - -- 45.62 - - - -- - - -- - - -- - - - -- 45.62 852 29.73 647.13 45.62 - -- - - -- - -- 45.57 - - - -- - - -- -- - - - -- 45.57 854 29.31 647.11 45.57 - - - -- - - - -- -- 45.53 - -- - - -- - -- - - - -- 45.53 856 28.92 647.09 45.53 - - -- - - - -- - 45.48 -- - -- - - - - -- 45.48 858 28.55 647.07 45.48 - - -- - - - -- - 45.43 - - - -- -- - - - -- 45.43 860 28.21 647.05 45.43 - - -- - - -- -- 45.38 - - - -- -- - - - -- 45.38 862 27.89 647.03 45.38 -- - - -- -- 45.33 - - - -- -- - - - -- 45.33 864 27.59 647.01 45.33 - - -- - - -- -- 45.28 - - - -- - -- - - - -- 45.28 866 27.32 646.99 45.28 - - - -- - -- -- 45.23 -- - - -- - --- ----- 45.23 868 27.06 646.97 45.22 - -- - - -- -- 45.17 - - - -- -- - - - -- 45.17 870 26.82 646.95 45.17 - - -- - -- - - -- 45.12 - - - -- - - -- - - -- - - - -- 45.12 872 26.60 646.93 45.12 - -- - -- - - - -- 45.07 - - - -- - - -- - -- - - - -- 45.07 874 26.38 646.91 45.06 - - -- - -- - - -- 45.01 - - - -- - -- - -- - - - -- 45.01 876 26.18 646.89 45.01 - - -- - - -- - - - -- 44.96 - - - -- - - -- -- - - - -- 44.96 878 25.99 646.87 44.95 - -- - - -- - - - -- 44.91 - - - -- - -- - -- - - - -- 44.91 880 25.81 646.85 44.90 -- -- - - - -- 44.85 - - - -- - -- -- - - - -- 44.85 882 25.63 646.82 44.84 -- - - -- - - - -- 44.80 - - - -- - - -- -- - - - -- 44.80 884 25.46 646.80 44.78 -- - - -- - - -- 44.74 - -- - -- - -- - - - -- 44.74 886 25.29 646.78 44.73 - -- - -- - - -- 44.69 - -- - -- - -- - - - -- 44.69 888 25.12 646.76 44.67 - - - -- - - - -- - -- 44.63 - - - -- --- - ----- 44.63 890 24.95 646.74 44.61 - - - -- - - - -- -- 44.58 - -- -- -- - - - -- 44.58 892 24.78 646.71 44.55 - - -- - - -- ----- 44.52 - - - -- - - -- - -- - - -- 44.52 894 24.61 646.69 44.49 - - -- - -- - - - -- 44.47 - - - -- - - - -- -- - - -- 44.47 896 24.44 646.67 44.44 - - -- - -- - - -- 44.41 - - - -- - - - -- - - -- - - -- 44.41 898 24.28 646.65 44.38 - - -- - -- - - - -- 44.35 - - - -- - - - -- - -- - - - -- 44.35 Continues on next page... n 17 Detention survey pond Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 900 24.11 646.62 44.32 - - - -- -- - - -- 44.30 - -- - - -- - - - -- - -- 44.30 902 23.94 646.60 44.26 - - -- - - - -- 44.24 - - - - -- - - - -- - - -- 44.24 904 23.77 646.57 44.19 - - -- - -- - - -- 44.16 - -- - - -- - - -- - -- 44.16 906 23.60 646.55 44.12 -- - - - -- - - -- 44.08 - - -- - - -- - - -- - 44.08 908 23.43 646.52 44.04 -- - - - -- - - -- 44.01 - - - -- - -- -- -- 44.01 910 23.26 646.49 43.97 - -- - -- - -- 43.94 - - -- -- - -- 43.94 912 23.09 646.47 43.90 - -- - -- 43.87 - -- - -- - - - -- 43.87 914 22.92 646.44 43.83 - - -- - -- - -- 43.81 - - -- - - -- - -- - - - -- 43.81 916 22.75 646.41 43.75 - -- - - -- - -- 43.75 -- - - -- - - - -- - - - -- 43.75 918 22.57 646.39 43.68 - - - - -- - -- 43.68 -- - - -- - -- - - - -- 43.68 920 22.40 646.36 43.61 - - - - -- -- 43.60 - - -- - -- - - - -- - - - -- 43.60 922 22.23 646.33 43.53 -- - - - -- - -- 43.52 - - -- - - = -- - - - -- - - - -- 43.52 924 22.06 646.30 43.46 -- -- - -- 43.45 - - -- - - -- - - -- -- 43.45 926 21.89 646.27 43.38 - -- - - - -- - -- 43.36 - - - -- - - -- - - - -- - - -- 43.36 928 21.72 646.25 43.30 - -- -- -- 43.28 - - - -- - - -- - - - -- - - 43.28 930 21.55 646.22 43.23 - - -- -- -- 43.21 - - - -- -- - - - -- - 43.21 932 21.38. 646.19 43.15 - - -- - -- 43.13 - - - -- - -- - - -- - 43.13 934 21.21 646.16 43.07 -- - -- 43.05 - - - -- - -- - - -- - 43.05 936 21.04 646.13 42.99 - -- - - - -- 42.97 - - - -- - - -- - -- -- 42.97 938 20.87 646.10 42.91 -- - - - -- 42.89 - - - -- - - -- -- -- 42.89 940 20.69 646.08 42.83 -- -- - -- 42.81 - -- -- -- -- 42.81 942 20.52 646.05 42.75 - - -- - - -- - - -- 42.73 - --- - -- - -- - - -- 42.73 944 20.35 646.02 42.67 -- - - -- - - -- 42.65 - - -- - -- - -- - - -- 42.65 946 20.18 645.99 42.59 -- - - -- - - -- 42.57 - -- -- - -- 42.57 948 20.01 645.95 42.49 - -- - - - -- - - -- 42.47 -- - -- - - -- - - - -- 42.47 950 19.84 645.92 42.40 - -- - - - -- - - -- 42.38 -- - - -- - - - - -- 42.38 952 19.67 645.89 42.30 - - -- - - -- -- 42.28 -- - - -- -- - - - -- 42.28 954 19.49 645.85 42.21 - - - -- - - -- - -- 42.19 - -- - - - -- --- - - - -- 42.19 956 19.32 645.82 42.11 - - -- -- - -- 42.10 -- - - -- - - -- - - - -- 42.10 958 19.15 645.79 42.02 - - -- - - -- - - -- 42.01 - -- - -- - - - - -- 42.01 960 18.98 645.75 41.92 - - -- - - - -- - -- 41.91 - -- - -- -- - - - -- 41.91 962 18.81 645.72 41.82 -- - - - -- - - -- 41.81 -- - -- - -- - - -- 41.81 964 18.64 645.69 41.72 - -- - - - -- - - -- 41.71 - -- - -- - -- - - - -- 41.71 966 18.47 645.65 41.62 - -- - - - -- - -- 41.61 - -- - -- ----- - - - -- 41.61 968 18.31 645.62 41.52 -- - - - -- - - -- 41.51 - - -- -- - - - -- 41.51 970 18.15 645.58 41.42 -- - - -- - - -- 41.41 - -- - -- -- - - - -- 41.41 972 17.99 645.55 41.32 - -- ---- - - -- 41.31 -- - -- -- - - - -- 41.31 974 17.85 645.51 41.21 -- - - - -- - - -- 41.20 -- - -- -- - - - -- 41.20 976 17.71 645.48 41.11 - -- - - -- - - -- 41.10 -- - -- - -- - - - -- 41.10 978 17.58 645.45 41.00 - - - -- - - -- 40.99 -- - -- -- - - - -- 40.99 980 17.46 645.41 40.90 - -- - -- - -- 40.88 = -- - - -- - -- - - - -- 40.88 982 17.34 645.38 40.79 - -- - -- - - -- 40.78 - - -- - - - -- - -- - - - -- 40.78 984 17.24 645.34 40.68 - -- -- - - - -- 40.67 - - - -- - -- -- - - - -- 40.67 986 17.14 645.31 40.58 - - -- -- - - -- 40.56 - - - -- - - - -- -- - - - -- 40.56 988 17.05 645.27 40.47 - -- -- - -- 40.46 - - - -- - - -- - -- - - - -- 40.46 990 16.96 645.24 40.36 - -- - - -- 40.35 - - - -- - - -- - - - -- - - - -- 40.35 992 16.88 645.20 40.25 -- - - -- 40.24 - - - -- - - - -- - - - -- - - -- 40.24 994 16.80 645.17 40.13 -- - -- 40.13 - - - -- - - -- - - -- -- 40.13 996 16.73 645.14 40.02 - - -- -- -- 40.02 - - - -- - - - -- - - -- - -- 40.02 998 16.66 645.10 39.91 - - -- - - - -- - - -- 39.91 - - - -- - - -- - - - -- - - -- 39.91 1000 16.60 645.07 39.79 - - -- - - - -- - - -- 39.79 - - - -- - - -- - -- - - - -- 39.79 1002 16.53 645.03 39.68 - - -- - - - -- - - -- 39.68 - - -- - -- - -- - - - -- 39.68 1004 16.47 645.00 39.56 - - -- - - - -- - - -- 39.56 - - - -- - - -- - -- - - - -- 39.56 1006 16.41 644.95 39.41 - -- - - - -- - - -- 39.41 - - -- - - - -- - - -- - -- 39.41 Continues on next page... 18 Detention survey pond Hydrograph Discharge Table Time Inflow Elevation Civ A Civ B Civ C PfRsr Wr A Wr B Wr C Wr D Exfil Outflow (min) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 1008 16.35 644.91 39.26 - -- - -- - - - -- 39.25 - - - -- - - -- ---- - - -- 39.25 1010 16.29 644.87 39.10 - -- - - - -- - - - -- 39.10 - - -- ---- - -- - - - -- 39.10 ...End VICINITY MAP - 1 1000 Y' a Lq S s WO CUP RISER EXISTING EV647 50 TRASH RACK NOT SHOWN 50-YR WATER SURFACE EL-6 I0-YR WATEfl SURFACE II II RISER TO BE REDUCED 10 ELEVAMCN OF 64295 I I PERMANENT POOL EL 54295 POND BOTTOM EL 637 10' WIDE AT TOP Of DAM/BERM (T ) WEIR EL& 647 TOP OF DAY EL 648.50 SECTION THROUGH OUTLET STRUCTURE AND DAM N.T.S. r - WATER LEVEL zZ D n 0 C. �a INTERNATIONAL BUSINESS PARK COMMON AREA, MB 21, PG 88 DB 6377 PG. 214 5601 -41 -7725 EP ZONE 1 -2 / / / / - -_ -_ /ice - , ,' \, . •' - •A ,,,� • ,, , . " ',APPROXIMATE" AREA' MH55 �•Dg �' ,/ i i /, / , / / fG.l� i '•r"•'� �. , FOR POND, AT'RISER - \ \) / RIM 655 96' ' %i / / w� i� /� r' /a,„ /,;�; 'l r•._�fry, 1p `.ii %\ i BEING REDUCED"TO- AN \ \ INV /IN = - '\ \ / 6 896' aE VAn0 4298 INV OUT 648 7 6% O ' 4 �! ff tT'•�t"ta_;y r n. r �, _ s , 'l. - _ ,�r•;i7< _ >.�.. %�,.- �'''�u��_ //' ) ,� HATCHED ,AREA •' i / i rVrr - l / " . t..;r`- __> \ ;i . r ey .d `1/ - : ,� - +- � V. _. - REPRESENTS "�XISTJNG % ! / i �'/ •y•\s,- "i'j ?S`',r'a'i�,- - -''•; �_'1 a;i -; :'' • +', -CSJ ,n' / \,, , "POND LIMITS / l (�'J It ,r .c,J' =_ 1 ✓+ +� C.' / // / / 1 i- � �''i� _ E ;- 's',�sx ',�'- s- ��`l"s f' ,.IS - t•f.:C;r -,r. :Si,. �r,:�`X .�o ' " i, - / QI' f \ I / _;`7 „[� , II r I j ' i/J .L/ / C1 �, . •,r / ' , x/ls'' \ ' . :, .`,s .'u `t °'a` s 'a`3 a� ' :• • = :, : :y .F{_ " Yi , w� �j •}. Y, " \".` �,�,- r' fs' '%^` 3,.,i;.'ru";?;' t ,,a.:.3>: s, yy X-. N' = 3-'a ' ',-;';�%• %?.` jkfi=.�- t :: "� •y. r.x,4r ;'`-:' - _ h';�1 .te-t:r,;�,: ':/ r? 'i•" �"r.>.r 9 .��1t ",- .'' " F �y.= ,. ' " ,i' 'I 1 i i i ',i , � - ., i/ /' , t/ - , - ,, // ' %'/ , i / / / / / / / / / / / / / / / / / / J i .m/ Q r ' / � / i / // - / / / / / / / /• � / J / / / / ' / / / / , / l / / / / C/ p � T' _? R AAR / ?e, -1 1 ;l . , r .: r r'%ax- / / / rh/^af'•,' - > > „�. -::f• �.' ,wyTER; /,•� rrr, -.. r,'r „: �I - `\ `_\ � \ - \ \ \ \ I\ � \ •. ` 1 \ ` \ �i .� ;/\'. 1 ,"Y \ �/ / ; r'! i '' `. / •� !', /, � ,' , ' ”. ' +?r`g s n , t- tr- `yrr.. ;p„>`; ' ,"b .� �.J' 'x: ^�i,1;A- �}';r`i �,t7;>._b , � � , '3' ;..a.�rr•ldy� •;A:,`,,- tfi`K. x A>�rr t ,_f s-�:�" .: v�ms,r : s.t�.X7 r4-'. �.s �.y,f "," ;1.'� :� :; '��✓ ' lk•;�._ . >s fi•'f"'s ;-:� ';-h;; � l " �- : �°. .-:�W,�S.`, Y � ? i�,, w -r � f� �?r�,',_'r `� 3,;%�r" r .s ' w s " \,'1 1 1, : ' 'Li"EV'EL 2r I;� „r / ;y., \ \ \ \ \ ^ -'' .•� . �, +yr. . S •`tj Y is✓.n �! y +i: dl_s., �r \' ,i,' 4o / / J r /% i t ",; Y ; !',•.y -, .+F.:w t"�+` :!. „:'y�v'ti -'c -C'�c. �. i%. `'rr! 3' �y"r S. / d••.- , ,// / / / r” / / / / / J I , / / J �? `��\ \ \\ \\ \� %' �;r�s; '�u��*a'•1`y�'3,,*_ # >V;. "'-,s'rn <+; �.s'.,/--H'of -. �,t.u. ;f: "J /�/ / / / / J J r: ;� � / , / / J / J I ii�-s� - _ \ \ \ \\ \ \ ,�/ /\,/ , i \' rdr . °-` _i- /' -s5. '` • ' -ti,� i• {�. 'ir -;.,: , ,1 /J/ /• a •- ( / -/ , J J r \, \Y� \\ \ \ \� \/ .\�,. ;,.aG4,Y;,I„F+,- ';g,,..z, ✓x .•. yf.= . /..s;t" ✓. :-:.•,;•' 3i' sl -,:ysl �! •,l•'; / / /�J / / / // / _/ m J,'� J/ i .� /� / / 1 I 't- 'Y ` \\ \ \ � : ;' , i ; '>:F � -' 3,, /T,, °; •' .t'� '6,_- r•.3.'.•^ �... y/lY <'� r ySj....�,r' ,7,' . gi / J / J '�� � � / / / I / I `�t•.�, \ \ \ ' i /, j \, <y ^ -SlnaV ,,. ff =� so's•: Nti^ �/:-TI .Cll; a^ /. / / / / / / \`/ I ' \ \�•;;;/ ,\', ' /, vlv ': 'st•": ?iww..����, �•i'.,!.r:� /'� 1i'.�3>i':�'�,: T'` ` /: // / / J / / 1 I 1 ':24' �v v �.• •. : •�i '�i -`� F• %a.• f'''''t'' '�--- ,ff'�',`a C �'`vT , J ,',� �/ O / / / / (, V I A 1 : y Bew\ J. 0 \\ \ I \ \\ \ ,1 I \ GRAPHIC SCALE MH55 RIM = 65473' \ I \ \ \ ¢ INV IN - 647 68' / I I ', \ \ \ \ \ \ \ \ \ \ Ih FEET INV OUT = 647 58' ( ) 1 \- Inch = 30 IL m t 0 � n g - J Sw r OVA I 7Ac •, OB 2089 PG 302 *1.1111 IUPFPMOUS _T___ merp -, It - - J\ i."- RON _ MY d i .":jam« ON r ir Aiy . n \\ top 6 a =�, I/ r s l r � n ter. ir Aiy . n \\ top W \ Act'; ry- 6 a =�, s l � n W \ Act'; ry- PROJECTSUMMARY PROPERTY PROJECT NAME - IBP LOT 10 SPEC BUILDING OWNERIDEVELOPER BEACON PARTNERS PLANS PREPARED BY BURTON ENGINEERING ASSOCIATES PHONE ift ZONING I-2 PETITION NO. WA TAX PARCEL 5601 -52- 3460 -0000 JURISDICTION CITY OF CONCORD WATERSHED DISTRICT N/A FEMA PANEL No. 3710560100) FEMA DATE 11/05108 FLOOD ZONE X LOT SIZE 4 60 ACRES SETBACK REQUIREMENTS FRONT SETBACK 50 FT (BUILDING) FRONT SETBACK 25 FT (PARKING) INTERIOR SIDE YARD 25 FT REAR YARD 25 FT. REQUIRED BUFFERS FRONT NO/ ES WA FT REAR NO ES N/A FT SIDE(STREET) NO ES WAFT SIDE NO ES WAFT. BUILDING PROPOSED USE WAREHOUSE I DISTRIBUTION BUILDING HEIGHT 33 FEET, STORIES __L BUILDING COVERAGE 50y00 SO FT. GROSS FLOOR AREA. 50_4 00 SQ.FT. ALL SIGNAGE WILL BE APPROVED AND PERMITTED SEPARATELY. to Zp¢ SITE DEVELOPMENT PACKAGE FOR w w N V Z 0 z W w m =0ww_tnI- NjOO�F000 c!)'<t"¢¢¢Nz ow[go zo¢0O¢z00 ¢r ZZ wZO¢O ¢¢ Q- 0¢ w 0 0 OV 0 5 2015 Na wZ 070 wyZ Cc O z ¢ 0: _¢- ¢�m¢� 1-O- Z W dcacl 10 w IBP LOT WATER RESOURCES C7� BUFFER PERMITTING ? � � W Z °m zw< SPEC UILDING m� OTT I..LV/Zr��U z� q O'r-� Wh U o �ZvJ j2 0 x CCw< . m E 4535 ENTERPRISE DR �aLL Z o CONCORD. NORTH CAROLINA Sep anL SCALE 1" = 80' Ise�.rehrba car -wt PROJECT CONTACT INFORMATION STORMWATER ENGINEER ARCHITECT CONTRACTOR Burton Engineering Associates Merriman-Schmitt Architects, Inc TBD Greg Welsh Steve Schmitt, Creig Fleming Concord, NC 28027 5950 Felrview Road, Suite 10D 61D East Morehead Street, Suite 200 TRANSPORTATION Charlotte, NC 28210 Charlotte, NC 28202 City of Concord Engineering Phone 704-553-8881 • Fax 704 - 553-8860 Phone 704.377 -1177 • Fax 704 -377 -3060 850 Warren C Coleman Blvd DEVELOPER OWNER TOPOGRAPHIC SURVEY PROVIDED BY Beacon Partners Bedford Village, SA dtla Bedford Village SA, Inm CESI Land Development Services Contact Sean McDonnell 1499 West Palmetto Rd, Suite 204 David Hlayweod 610 East Morehead St. Suite 250 Baca Raton, FL 33486 PO Box 268 Charlotte. NC 28202 Phone 561- 338 -7480 Concord, NC 28026 Phone 704 -926 -1386 Phone 704 - 786 -5404 • Fax 704788 -7454 / 1 1 I DRAWING RECORD ISSUED FOR DATE ISSUED FOR DATE / 7 E CITY PLAN REVIEW 1028115 ( \ \ mY NCDENR STREAM CROSSING 11107JIS I / USACE STREAM CROSSING t1 /02/15 111 -- -- -- -� -1 --�- X11 I DRAWING ISSUANCE RECORD - * - SHEET DRAWINGTITLE GRID DATE LATEST REVIDATE �r + t C10 COVER SHEET Oct 2B, 2015 111/07/15 Cl1 GENERAL NOTES Olt 28. 2015 C2 0 EXISTING CONDITIONS PLAN Sept 22, 2015 rc I 1\ C2 t DEMOLITION PLAN Oct 20, 2018 � y N� C If If - } —' } PROaosEDe� LOI- n _� -I -� � \ \ \\ \\ \I \� � C3 slTEaumrnPLAN od.za,zals G O GRADING B DRAINAGE PLAN Oct 28 1075 1. 17102115 -- I C50 EROSION CONTROL PLAN-PHASE I Co. 282015 C51 EROSION CONTROL PLAN -PHASE II Od 2B, 2075 1 1 C8 0 LANDSCAPE PLAN Oct 28, 2015 I f r t C70 GENERAL DETAILS Oct 20, 2015 C71 GENERAL DETAILS Oct 28'20j5 C7 2 UTILITY DETAILS Oct 28, 2015 — _ _ — l l 111 (( C73 STORMWATER DETAILS Did 28,2015 1116' C74 EROSION CONTROL DETAILS Od 28,2015 I REVIEW /PERMIT STATUS ( (PERMITS BELOW FOR SITE ONLY / I AGENCYNERMIT SUBMITTED APPROVED PERMIT No rI I/ I I SOILS ENGINEERS Geosclenc , Group, Inc Daniel Mickney 500-K Clanton Road Charlotte, NC 28217 Phone 704 -941 -2243 • Fax 704 - 5252051 BOUNDARY /UTILITY SURVEY BY CESI Land Development Services David Haywcod PO Box 268 Concord, NC 28026 Phone 7047865404 • Fax 704786 -7454 REGULATORY - UTILITY - MUNICIPALITY CONTACTS STORMWATER FIRE MARSHAL City of Concord Engineering City of Conmrd Fire Prevention Doug Miller Amhle Coble 850 Warren C Coleman Blvd 100 Warren C Coleman Blvd Concord, NC 28025 Concord, NC 28027 Phone (704) 920-5378 Phone (704) 920 -5517 TRANSPORTATION UTILITIES R E ) City of Concord Engineering City of Concord Engineering Adam Dagenhart Sham Moore 850 Warren C Coleman Blvd 850 Warren C Coleman Blvd Concord, NC 28025 Concom, NC 28025 Phone (704) 920-5411 Phone (704) 920 -5415 EROSION CONTROL NCDENR - Mooresville Regional Ofnce Tamara Eplln 510 East Center Avenue, Suite 301 Mooresville, NC 28115 Phone (704) 683-5040 FIELD INSPECTOR NCDENR Samar Bou- Ghazole 610 East Center Avenue, Suite 301 Mooresville, NC 28115 Phone 919-507-5300 • Fax 704-663 -1699 f VICINITY MAP FORWNE A`/ 000.pp0.ATE OR P£� SITE s k � r =rear SEAL s»es 1 V Z 1w J a � J m 0 Q UW' fn �- ¢ 0 Cf)Fz pw� TL0 0 O 0 w w VJ w O GTW Engmeer EJR Drawn By 10/28/15 Date Revisions . wen s smra ceacvx c oelw.s 619 -001 C1 .0 Sheet 1 of 14 I ALL CONCRETE SIDEWALKS SHALL BE FULL 4' THICK 4080 PSI CONCRETE WIT' DEEP GROOVE CONTROL JOINTS AT INTERVALS INDICATED ON SITE RAN PROVIDE EKPANSION JOINTS ADJACENT MAU MUD STRUCTURES EXPANSION JOINT SPACING SHALL NOT EXCEED W 2 ALL DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED 3 SEE ARCHITECTURAL RAN FORE CT LOCATION 6 SQE OF WATER, SEWER CONNECTIONS & ROOF DOWNSPOUTS 4 SEE ARCH PLANS FOR BUILDING NMENNSIONLS, FEATURES STAIRS B HANDRAILS, ETC 5 DRIVEWAYS SHALL BE CONSTRUCTED M STATE 5 LOCAL CODES B ACCESSIBLE PARKING e ANACCESSIBLEPARONGSPAGE SI UHAVE NOGREATER SLOPE TINNY -PER FOOT ACROSS THE SPACE b HANDRAILS ARE M BE PROVIDED ON ACCESSIBLE RAMPS NTH A RISER GREATER THAN S' c MAK SLOPE FOR AN ACCESSIBLE ROUTE (SIDEWALK) SHALL BE 50 %(120) 4 AM ACCESSIBLE PARKING SPACES SHALL DISPLAY APPROVED RESERVED PARKING SPACE SIGNS AS PRESCRIBED BY THE N C D O T MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES 8 APPROVED FOR USE UNDER N C GENERAL STATUTE R7 -0, R74D RERALTY- SIGN 8 HERE APPUCABLE,'VANACCESSIBLE' SIGN 7 THECONTRA CTOR SHALL VISITTHE SITE& FAWUARVE HIMSELFWITH THE EXISTING CONOIT10- BEFORE SUBMITTING MS BID 8 AM DISTANCES DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE STARTOF CONSTRUCTION IN CASE OF CONFUCT, THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY SO TNT CLARIFICATIONS MAY BE MADE PRIOR M THE STA TOF WORK RK B THE PROPOSED GRADES SHOWN ARE THE FINISH GRADES UNLESS OTHERWISE NOTED 10 THE CONTRACTOR SHALL SUPPLY B ESTABUSH SURVEY COWL, INCLUDING THE HORIZONTAL&VERTCALCONMOLPOINTS THECONTRACMRSHALLMAINTAIN THIS CONTROL 6 PROMDEAU BENCHMARKS, STAKES, GRADES, LEVELS &LINES NECESSARY FOR CONSTRUCTION CONTRACTORS) SHILL PROVIDE ADEQUATE SUPERVISION M PREVENT DAMAGE 6 MOVEMENT FROM EOUPMENT WORKING AROUND CONSTRUCTION STAKES THESE CONSTRUCTION STAKES SHALL REMAIN IN PUCE 6 BE PROTECTED UNTIL OWNER APPROVES YST PPROVES TRIP CTION REMOVAL AN E TO THAT HAVE BEEN EN EDILAWARESU LTOFCONSTRLCTONACTVITYARETOBE REPLACED BY A lIOENSED LAID Sl1RJEYOR ENGAGES BY THE CONTRACTOR AT NO COST TO THE OWNER 11 ALLEOSTNGIWROVEMENTSDAMAGMASARESULTOFCONSMMC ON OPERATIONS SHALL BE RESTORED M THEIR ORIGINAL CONDITION M THE SATISFACTION OF THE OWNER 12 ALL DUSTING PAVEMENT 6 CONCRETE TO BE JOINED SHALL BE EAWLUT 13 BURNING ON OR NEAR THE JOB SITE WILL NOT BE PERMITTED 14 ALL PILL SHALL BE COMPACTED M% %PER ASTM D 09 15 U.FON COMPLETION OF THE WORK THE CONTACTOR SHALL CLEAN THE ENTIRE SITE OF ALL CONSTRUCTION RELATED MATERIAL 6 DEBRIS 1B TREE SAVE NOTES • TEMPORARY TREE SAVE FENCING INSTALLED UNDER THE ROUGH GRADING CONTRACT SHALL BE MAINTAINED UNTIL THE CITY ALLOWS ITS REMOVAL REMOVAL OF THIS FENCING SHAM BE INCLUDED HEREIN b THE SITE WORN CONIRACMMS) SHAM BE FAMILIAR WITH 60BSERVE THE APPUCABLE REGUIREMEWS ANY QUESTIONS SHOULD BE DIRECTED M THE ENGINEERING REPRESENTATIVE. 17 LAND DEVELOPMENT ENGINEER M BE GIVEN 24 HOURS NOTICE PRIOR TO STMT OF CONSTRUCTION 10 APPROVALOFTHSPUNISWTANAU OHZATONTDGMMONADJACEW PROPERTIES WHEN RELDCONgTIONS WARRANTOFFSITE GRADING, WRITTEN PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNER(S) 19. COORDINATE ALL CURB 6 STREET GRADES IN INTERSECTION PATH NCOOT INSPECTOR W IN ORDER ENSURE PROPER DRAINAGE, KEEP A MINIMM SLOPE OF 05 %ON CURB 21 INSTALL ALL EROSION CONTROL MEASURES PRIOR M STMT OF CONSTRUCTION SEE SHEET C50 AND CS 1 FOR EROSION CONTROL RAN 22 THE LOCATION OF EXISTING UTIUTES, STORM DRAINAGE STRUCTURES &OTHER ABOVE 6 BELOWLRADE IMPROVEMEWS ARE APPROXIMATELY AS SHOWN IT IS THE CONTRACTORS RESPONSINUTY M DETERMINE THE EXACT LOCATION, SIZE 6 INVERT ELEVATIONS OF SUCH PRIOR M START OF CONSTRUCTION 23 THE DEVELOPER SHALL MAINTAIN EACH STREAM, CREEK OR BACKWASH CHANNEL IN AN UNOBSTRUCTED STATE 6 SHAM REMOVE FROM THE CHANNEL ALL DEBRIS, LOGS, TIMBER, — 6 OTHER ACCUMULATIONS 24 AUROADIMPROVEMEWSAT ENTERPRISEDRANDBUSINESEBLVDMBE COORDINATED WITH CONCORD DEPARTMENT OF TRANSPORTAn —PRIOR M CONSMUCTON 25 PE SEALED SHOP DRAWINGS FOR RETAINING WALLS MUST BE SUBMITTED M THE COUNTY ENGINEER PRIOR M CONSTRUCTION 20 NDNSTAMDARD ITEMS OE PAVERS IRRIGATION SYSTEMS, ETCJ IN THE WW REQUIRE A RA' ENCROACHMENT AGREEMENT WITH THE CONCORD DEPARTMENT OF TRANSPORTATION BEFORE INSTALLATION 27 THE ENGINEER WILL NOT BE CONTINUOUSLY PRESENT IN THE FIELD IT IS SPECIFICALLY UNDERSTOOD TNT HE DOES NOT UNDERTAKE NORASSUME ANY OBLIGATION FOR SUPERVISION OF CONSTRUCTION SAFETY MEASURES TAKEN DURING THE COURSE OF CONSTRUCTION RESMNSIBIUTY FOR SCHEDULING THE WORK FOR INSURING COMPLETE COMPLIANCE NTH THE CONTRACT DOCUMENTS ANDORAU CODE REQUIREMENTS, RIMES 6 REGUUTONS OF AIVY PUBLIC OR PRIVATE AUTHORITY HAVING JURISDICTION OVER THE WHOLE OR ANT PART OF THE WORKNJADIN ION THEENGINEERNEITHERUNDERTAKES ,ASSUMES,NOR GUARANTEES THE WORK AWMR PERFORMANCE OF THE COWHACMR 25 ALL CONSTRUCTION SHALL MEET CABARRUS COUNTY, CITY OF CONCORD 6 STATE STANDARDS 29 BEFORE YOU DIG, STOP CALL THE W ONE -CALL CENTER AT 811 R'S THE LAW 30 REVIEW AND APPROVAL OF THE PLANS DOES NOT RELIEVE THE OWNEFL CONTRACTOR OR DEVELOPER FROM MEETING THE REQUIREMENTS OF THE CITY OF CONCOROSORCABA .RRUSGOUNTYORDINANCES MUGIES,ANDSTANDARD SPECIFICATIONS, (AS APPLICABLE), CONCORD WATER & SEWER POUCIES AND TECHNICAL SPECIFICATIONS, THE "STANDARD SPECIFICATION FOR WASTEWATER COLLECTION 6 WASTE DISTRIBUTION FOR CABARRUS COUNTY (WSACC MANUAL) AND ANY OTHER LOCAL, STATE, AND FEDERAL REQULATIONS AND APPROVALS 31. THE CONTRACTOR MUST CONTACT THE CITY OF CONCORD ENGINEERING CONSTRUCTION MANAGER PHI W P KING LAND. AT TW -0204125 AT LEAST 2"OURS PRIOR M NITRATING ANY CONSTRUCTION ACTIVITY. 32 ASPHALT PAVEMENT SEALERS ARE NOT REQUIRED 1 WDENRINSPECTORMBEGIVEN24HOURSWTICEPMORTOSTARTOF CONSTRUCTION 2 THE CDNTRACMR SHALL MAINTAIN EACH STREAM, CREEK OR BACKWASH CHANNEL IN M UNOBSREMOVE TRUCTED STATE 6 SHALL REM FROM THE CHANNEL 8 BANKS OF THE STREAM ALL DEBRIS, LOGS, TIMBER, JUNK 6 OTHER ACCUMULATIONS 3 APPROVAL OFTHISSITEPIANISNDTANAIRHA nONMGRADEADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFFSITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS UTILITY NOTES 1 DIMENSIONS TO, OR COORDINATES OF ARMHOLES VALVES, PIPEUNES, ETC, ARE CENTERLINE UNLESS OTHERWISE NOTED 2 THE CONTRACTOR SHALL OBTAIN &PAY FOR PRIOR M THE BEGINNING OF ANY WORK ALL PERMITS 6 LICENSES NECESSARY M ACCOMPUSH WORK PERMITS CAN INCLUDE, BUT ARE NOT LIMITED TO CITY OF CONCORD ENCROACHMENT PERMIT, GRADING PERMIT NDRURUTYCOMPAWSPERMITFORTHEWORKMBE PERFORMED ON THEIR RESPECTIVE FACILITIES 5 AW CONMACTOR PERFORMIW WORK ON THIS PROJECT SH AU FAMIUARIZE HIMSELF WITH THE THE JOB SITE 8 LOCATION OF ALL EXISTING FACILITIES 6 UNDERGROUM3 UTESSHOWNORNOTSHOWNONTIHESEPLANS THE CONTRACTOR WILL BE UNILATERALLY RESPONSIBLE FOR A W DAMAGE DONE M EXISnNG FACILITIES OR UNDERGROUND UTIUTES THAT ARE SHOWN OR NOT SHOWN ON THESE PLANS & IF DAMAGED THEY SHALL BE REPAIRED OR REPLACED M THE SATISFACTION OF THE OWNER AT NO COST M THE OWNER 4 THE CONTRACTOR SHALL RESET ALL MANHOLE COVERS, CATCH BASIN GRAMSB ANY OTHER UTILITY ACCESS COVERS M FINISHED PAVEMENT SURFACE OR SIDEWALK GRADE THE CONTRACTOR SHALL PROTECT UNDERGROUND UTIUTIES 6 THEIR APPURTENANCES TO REMAIN ON SITE FROM DAMAGE DURING CONSTRUCTION OPERATIONS 5 SEWER CLF UTS TO BE PROVIDED AT ALL BENDS ON T 0 OR LESS UWS CLEAN U TSSHALLBEPROVIDEDEVERYTSONPOUWS &EVERYTOGDNVO UNES SEWER LATERALS M BE PLACED AT A MIN SLOPE OF 1/4' PER FOOT ON CO UNES 6 118' PER FOOT ON 6'0 UNES 5 WHEN WATER MAIN IS ABOVE SEWER BUT WITH LESS THAT 18'CI-EARANCE, OR WHEN THE SEWER IS ABOVE THE WATER MAIN, BOTH WATER MAIN & SEWER UNE SHALL BE CONSTRUCTED OF FERROUS MATERIALS WITH JOINTS EQUIVALENT M WATER MAIN STANDARDS FOR A MINIMUM LATERAL DISTANCE, MEASUREDAT RIGHT ANGLES M THE SEWER, OF 10 ON EACH SIDE OF THE CROSSING WITH FULL SECTIONS CENTEREDAT THE POINT OF CROSSING T UPON COMPLETION OF CONSTRIIOTON 6 BEFORE ACTIVATION OF SEWER ONES 6 En cm&n N WATER MW N5, THE CONTRACTOR SHALL PROVIDE ASbUILT SURVEY INFORMATION TO THE ENGINEER B RACHBFPISREQUIREDTOBETESTEDBYANAPMMEDCERIFIEDTESTERPMOR TO PLACING THE WATER SYSTEM IN SERVICE 9 THERE SHALL BE NO TAPE, PIPING BRANCHES, UNAPPROVED BYPASS RANG, HYDRANTS, ARE DEPT CONNECTION POINTS, OR OTHER WATERASING APPURTENANCES CONNECTED M THE SUPPLY LINE BETWEEN AM WATER METER 6 ITS REQUIRED BACKFLOW PREVEWER 1D CONSTRUCT UTILITIES IN ACCORDANCE WITH THE REQUIREMENTS OF THE CITY OF CONCORD, CABARRUS COLWTY 8 THE STATE OF NORTH CARDUHA COMPLY W TH ALL APPLICABLE HEALTH 6 SAFETY REQUIREMENTS 11 CONSTRUCT WATER UNE WITH A MINIMUM OF 3' OF COVER CONSTRUCT AT EXTRA DEPTH AS REQUIRED M AVOID CONFUCTS 12 CONSTRUCT SANITARY SEWER WINS WITH A MINIMUM OF 4' OF COVER CONSTRUCT SANITARY SEWER PLAINS UNDER PAVEMENT WITH A MINIMUM OF F OF COVER 13 PROPOSED UnUTY SIZES ARE PREUMNARY B WIl BE CONFIRMED PRIOR M FINAL CONSTRUCTION PLANS 14 VERIFY EXISTING UTILITY LOCATIONS& OTHER EXISTING FEATURES PRIOR CONSTRUCTION REPORT ANY INCONSISTENCIES M OWNER PRIOR TO BEGINNING WORK 15 BACKFLOW PREVENTERS SHALL BE APPROVED MODELS BY WDENR B THE CITY OF CONCORD 18 ALL MATERIALS EQUIPMENT LABOR, AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH AND SUBJECT M THE WATER AND SEWER AUTHORITY OF CABARRUS COUNTY'S STANDARD SPECIFICATIONS, THE CITY OF CONCORD6 ORDINANCES, POLICIES, MD STANDARD SPECIFICATIONS, AND THE NORTH CAROUw ADMINISTRATIVE CODE FOR WASTEWATERCOUECTIONAND WATER DISTRIBUTION SYSTEMS IN THE EVENT OF CONFLICT BETWEEN THE WATER AND SEWER AUTHORITY OF CARARRUS COUNTY'S STANDARD SPECIFICATIONS, THE CITY OF CONCORDS ORDINANCES POLICIES AM STANDARD SPECRCATIONS, OR THE NORTH CAROLINA ADMIMSTRATIVE CODE, THE MORE RESTRICnVE REQUIREMENTS SHALL APPLY 17 T UISnWWATERMAINVALVEMMSANDSTEMSANDTHEE XSnN SEWERM✓JN MANHOLE RIMS ARE M BE RAISED OR LOWERED M FINAL GRADE. AS APPUCABLE AND AT LEAST }FT OF GROUND COVER IS TO BE MAINTAINED OVER THE EXISTING UTILITIES AT ALL TIMES 18 THE OWNER ANDOR DEVELOPER ARE RESPONSIBLE FOR DETERMINING IF THE WATER PRESSURE AND EXISTING PUBLIC ARE FLOW WILL BE ADEQUATE FOR THEIR PROPOSED SITE DEVELOPMENT IF NOT, THE OWNER OR DEVELOPER IS RESPONSIBLE FOR INSTALLING THE NECESSARY AND APPROVED DEVICE(S) M MAKE AN ADXSTMENTS M THE WATER PRESSURE, AND'OR WATER VOLUME SUPPLIED BY THE CONCORD AND SHALL BE RESPONSIBLE FOR THE MAINTENNDE OF ALL 6UCH DEVICES 19 ARNMUMOFTEN(10)HORVZ LFEETSWLLLBEM4I NWDBETWEENTHE CITY'S WATER LINES AND WASTEWATER LINES THE CRY'S PUBLIC INNS SHALL MNNTNN A MINIMUM FIVE (5) HORIZO WAL FEET AND TWO (2) VERTICAL FEET OF SEPARATION FROM AW TYPE OF MANTENANCE OBSTRUCTION, INCLUDING BUT NOT UK DMAWOTHERUTIUTYPRO lIO R6ONESMEQUPMEW IFMEXCEPDDN IS GRANTED A MINIMUM OF ONE (1) VERTICAL FOOT OF SEPARATION MUST BE MAINTNNED BETWEEN THE CITY'S PUBLIC MAINS AND THE MAINTENANCE OBSTRUCTION, AND THE CITY'S PUBLIC INNS WITH ASSOCIATED APPURTENANCES S-LAM BE CONSTRUCTED OF DUCTILE IRON PIPE OR APPROVED APPROVED FERROUS MATERIAL WITH JOINTS TINT ME EQUVALEW TO POTABLE WATER MAIN STMDARDS FOR DISTANCE OF TEN FEET ON EITHER SIDE DF THE POI W OF CROSSING IF A WATER LINE CROSSES UNDER SEINER UNE, REGARDLESS OF DEPTH, THEN WTH THE WATER ONES AND THE SEWER ONES SHALL BE CONSTRUCTED OF DUCTILE IRON PIPE OR AN APPROVED FERROUS MAMMAL WITH JOINTS TNT ARE EQUNALEW M POTABLE WATER MAIN STANDARDS FDR A DISTANCE OF TEN (10) FEET ON EITHER SIDE OF TE M W OF CROSSING FIRE MARSHAL NOTES 1 ACCESS AND WATER SUPPLY SHALL BE ESTABUSHED PRIOR M AND MAINTAINED DURING VERTICAL COMBUSTIBLE CONSTRUCTION (NFPA TO 241) IT IS UNDERSOD THAT MRTH TMS TYPE OF CONSTRUCTION THE WALLS DULL BE RAISED PRIOR M THE INSTALATION OF THE HYDRANTS DUE TO THE CRANE USED M UFT THE WALLS IMMEDIATELY AFTER THE WALLS ARE LF, THE INSTALLATION OF THE HYDRANTS SHOULD BEGIN 2 NEEDEDFIREFLOW RTHE STRUCTURE MUST BE PROVIDEDAND MAINTAINED THE HYDRANTS MUST BE INSTALLED AND REMAIN ACCESSIBLE THROW HOUT THE CONSTRUCTION OF THE STRUCTURE 3 THE SITE ADDRESS SHALL BE POSTED IN A TEMPORARY FORM AND UPON COMPLETION IN A PERMANENT FORM IN A VISIBLE LOCATION IN 64NCH CHARACTERS INA REFLECTNEMATERIALAMCONTRASTWCOLOR (IF—I)ATEMPORARY ADDRESS SHOULD BE POSTED FOR EMERGENCIES WRING CONSTRUCTION THE LCCATON COLOR AND SIZE OF THE ADDRESS NEEDS M BE COORDINATED WITH THE INSPECTOR ON SITE DURING CONSTRUCTION 4 FIRE ACCESS ROADS SHALL HAVE UNOBSTRUCTED CLEARANCE OF 13FOOT &-INCHES RFC 5033 1) 5 THE REQUIRED TURNING RADIUS OF ARE ACCESS ROADS SHALL BE 42 -FOOT RADIUS (IFC SIM 2 4) THE WIDTH OF THE ACCESS ROAD MAY NOT BE OBSTRUCTED DURING CONSTRUCTION FIRE AND EMS MUST BE ABLE TO ACCESS THE SITE FOR TIRES OR ACCIDENTS DURING CONSTRUCTION B FIRE LINES REQUIRED FOR ACCESS M THE STRUCTURE ARE REQUIRED M BE STRIPPED AND MARKED BY SIGNS PROHIBITING PARKING IN AREAS WHERE ACCESS MAY BE BLOCKED BLOCKAGE TO ACCESS AFTER CONSTRICTION MAY RESULT IN FUTURE REQUIREMENTS FOR STRIPPING AND SIGNAGE (C067) CONTACT CONCORD FIRE MARSHAL S OFFICE PRIOR M LANE STRIPPING FOR DETAILS ALL LANES SHALL BE MARKED IN ACCORDANCE WITH DEPARTMENT SPECIRCATONS AND APPROVED PRIOR M INSTALLATION 7 PUBLIC FIRE HYDRANTS SHALL BE PAINTED YELLOW AND PRIVATE HYDRANTS SHALL BEPAINTEDRED ALLNEWHYDA SHALLBEEOUPPEDWITHASSTORZFITTING B STRUCTURES UNDER CONSTRUCTION ARE REQUIRED M HAVE TEMPORARY ARE EXTNGUSHERS ON SITE DURING CONSTRUCTION TREE PROTECTION NOTES 1 NO SOIL DISMRBANCE OR COMPACTION, CONSTRUCTION MATERIALS, TRAFFIC, BURIAL PITS, TRENCHING OR OTHER LAND DISTURBING ACTIVITY ALLOWED IN THE TREE PROTECTION ZONE TREE BARRICADES MUST BE INSTALLED BEFORE ANY DEMOUTON GRADING, OR CONSTRUCTION BEGINS, & NOT REMOVED UNTIL FINAL INSPECTION 2 TREE PROTECTION BARRICADES MUST MEET OR EXCEED THE STANDARDS FOR THE CITY OF CONCORD 3 CONTRACTOR M CALL THE CITY OF CONCORD FOR INSPECTION OF TREE PROTECTION FENCING PRIOR M THE ISSUANCE OF A GRADING PERMIT 4 NO GRUBBING WITHIN TREE PROTECTION ZONE LEAVE SOIL B LEAF UTTER UNDISTURBED SUPPLEMENT WITH 1 -21N OF MULCH RESEED WITH GRASS MLI H USTURBED'GRADEDAREAS 5 BRUSH, VINES 8 SMALL TREES (<0-0 OR AS SMALL AS r —ER) NAY BE HAND CLEARED ONLY CUT FLUSH WITH GROUND SURFACE EKISTING TREES MAY BE LIMBED UP 6 FT NT LEAST N3 OF THE BRANCHES SHOULD BE LEFT) M IMPROVE VISIBIUTY 6 EXPOSED TREE ROOTS MUST BE CIFAMY CUT PATH SHARP PRUNING TOW BACKRU ASAP TO MINIMIZE EXPOSURE M THE AIR T TREE PROTECTION FENCE IS M BE LOCATED 1 FT PER TREE DA INCH AWAY FROM THE TREE IN THE SETBACK OR RIGHT -0O -WAY HOWEVER, FENCING M BE W CLOSER THAN THE DRIP UNE OF THE TREE TREE PLANTING NOTES 1 MINIMUM TREE SIZE AT RANTING IS 2- CAUPER 07OR SINGLE STEM TREES) ALL K4TSTEM TREES MUST BE TREE FORM MAMMUM 3 M 5 TRUNKS, & MINIMUM B FEET TAM - 2 ALL STRAPPING &ADP 03 OF WIRE BASKET MUST BE CUTAWAY B REMOVED FROM ROOT BALL PRIOR M E ACKFU -W PLANING PIT REMOVE TOP 113 OF THE BURLAP FROM ROOT BALL 3 FOR NEW PLANTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUB SE, 8 CONSTRUCTION DEBRIS, REMOVE COMPACTED SUL & ADD 24' NEW TOPSOIL OR UNCOMPACT & AMEND TOP 24' OF ELSnW SOIL M MEET MPSOIUPLANTW MAX STANDARDS FOR TREES (WITHIN ENTIRE MINIMUM AREA OF 274 SO FT PER TREE) 4 GEM4 NGTREES EAMINIM%UM25MWFEETFROMM LAR TURN MUSTS ERHEAD DISTRIBUTION URBAN TRANSMISSION LIVES IF TREE ORE PLICTS WTi POWER LINES OR SIGNS, CALL URBAN FORESTER TO RESOLVE BEFORE PUNTING SEEDBED PREPARATION 1 AREAS M BE SEEDED SHALL BE RIPPED OR TILLED AND SPREAD WITH AVAILABLE TOPSOIL 4 -DEEP TOTAL SEEDBED PREPARED DEPTH SHALL BE S' 2 ROCKS, ROOTS & OTHER OBSMUCTONS 6 CONSTRUCTION DEBRIS SHALL BE REMOVED FROM THE SURFACE OF THE SEEDBED SURFACE OF COMPLETED PREPARED SEEDBED SHALL BE LOOSE SMOOTH 6 UNIFORM 3 CONTRACTOR SHALL TILL, DISC ANDOR HARROW IF NECESSARY M ACHIEVE THIS 4 FIND SOILTESTISTAI(EN,FERnI ERMDUMESHALLBEAPPUEDACCORDINGM THE SEEDING SPECIFICATIONS 5 IF SOIL TEST IS TAKEN, APPLY FERTILIZER 6 UME IN ACCORDANCE W SOIL TEST RECOMMENDATIONS 6 LIME 6 FERTILIZER SHALL BE APPUED UNIFORMLY AND MIXED WITH THE SOIL DURING SEEDBED PREPARATION T IMMEDIATELY AFTER SEEDING, MUCH ALL SEEDED AREAS WITH A THIN DENSE LAYER OF CLEAN WHEAT STRAW LANDSCAPE NOTES 1 ALL PLANTS SHALL MEET OR EXCEED THE MINIMUM STANDARDS SET FORTH IN THE AMERICAN STANDARDS FOR NURSERY STOCK BY THE AMERICAN ASSOCIATION OF NURSERYMEN, INC , WASHINGTON, D C 2 AUPLANTSSRALLBECOMPACT ,LANFORM, &WELLGROM PUWSSHALLNOTBE LOOSE OPEN RANTS THE CLIENTS LANDSCAPE ARCHTECT RESERVES THE RIGHT, IN OUR SOLE OPINION, M REJECT AW & ALL MATERIALS WHICH M NOT MEET THESE REQUIREMENT S 3 ALL PLANTING BEDS SHALL BE MU -CHEDA MINIMUM OF 4' WITH PINE NEEDLE MUCH A ALL PLANTS SHALL BE FREE FROM DISEASE, INSECT INFESTATIONS, 61Htt1FRIEb 5 ALL PLAWBEDUSHALLHAVEAPV4MTRENCHINSTALLEDATTHEPEWMETEROF THE BED 6 COMPACTOR MUST PROVIDE A ONE YEAR WRITTEN GUARANTEE FOR ALL PRAM MATERIALS FROM THE DATE OF FINAL ACCEPTANCE BY THE LANDSCAPE ARCHITECT T THE SPECIES, VARIETIES B SIZE LISTED SHAM BE PROVIDED AS SPECIFIED SUBSTITUTIONS WILL BE PERMITTED ONLY UPON WRITTEN APPUCAnON BY THE CONTRACTOR TO THE LANDSCAPE ARCHITECT, 6 VMEN APPROVAL BY SID LANDSCAPE ARCHITECT IS IN WRIT- 5 SYMBOLS BBB - BALLED B BURUPPED, O C - ON CENTER, GAL - GALLON CONTAINER, M S - MULTSTEM, HT - HEIGHT, CAL ^ CAUPER 9 THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL PLANTS ILLUSTRA TEDONTHEPLANnN PLANIFANYDISCREPANCIESEASTBETWEENTHE QUANnTES USMD ON THE PLAW UST 6 THE QUANTITIES SHOWN ON THE RAN, IT THECONTRACM SHALLPROVIDEALLQUANTESILWSWATEDDNTHEPLAN IF ANY PLANTS ARE SHOWN NOT LABELED THE CONTRACTOR SHALL VERIFY THE RAM IDENTITY WITH THE LANDSCAPE ARCHITECT & THESE PLANTINGS SHALL RE INCLUDED IN THE CONTRACTOR'S INITIAL BID 10 SOIL AMENDMENTS SHALL BE UNIFORMLY SPREAD& CULTIVATED THDROUGHLY BY A MECHANICAL TILLER IMO THE TOP IT OF SOIL THROUGHOUT SHRUB BEDS 11 THE LANDSCAPE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT 6 THE OWNER IN WRITING OF ALL SOIL CONDITIONS THE CONTRACTOR CONSIDERS DETRIMENTAL M THE GROWTH OF PLANT MATERIALS PROPER MANAGE RUST BE ASSURED 12 FOR NEW PLATTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUB4ASEA CONSTRUCTION DEBRIS BEFORE PREPARING SOIL & PLANTING TREES U REMOVE COMPACTED SOIL 6 ADD 24 NEW MPSOIUPLANRNG MIX OR UNCOMPACTI AMEND TOP 24' OF EXISTING SOIL M MEET MPSUI.fPLANTING MIX STANDARDS FDR TREES 14 ALL STRA PPING 6 TOP L3 OF WIRE BASKET MUST BE REMOVED FROM ROOT BALL PIORMBACKALUMPLANTINIGRT REMMEMPlaOFBURLAPFROMROOT BALL 15 AUSIGNAGEB SITE UGKnNGTOBECOORDINATEDAROUWTHEWEESLOCATED ON THE PUNTING PUN ALL TREES SHOWN ON THE PWVTING PIAN MUST GO IN AS SPECIFIED AM CHANGES TO THE PUNTING RAN COULD RESULT IN A DELAY IN RECEIVING & OCCUPANCY PERMIT 16 CONSULT PUNT UST FOR PUNT SIZES & SPECIFICATIONS 17 CONTRACTOR SHALL VERIFY ALL UTIUTY LOCATIONS PRIOR M INSTAUATON NOTIFY ARCHITECT IF FIELD CONDITONS WARRANT ADJUSTWW OF PLANT LOCATIONS 18 CONTRACTOR IS RESPONSIBLE FOR ALL RANTS SHOWN ON PLANS QUANTITIES ARE FOR CONVENIENCES ONLY 19 MULCH M BE PINE NEEDLES OR EQUIV APPROVED BY THE CITY OF CONCORD M GENE RALCONTMCMRMSEEDAUDISTURBEDMEAS BEYONDPARKING LOT PERIMETER IAKWCAPECDNRACTORSH USEEDALLAREASVMTHNPARI MN NOTED 21 ALL DISIUT>BED AREAS MUST BE REPLANTED WITH NATIVE GRASSES THAT CAN FLOURISH WITHOUT IRRIGATION NATURAL GRASSES AD VEGETATION MUST BE MAINTAINED ON ALL STEEPLY GRADED SLOPES M PREVENT EROSION EROS. CONE MEASURES MAINTENANCE PLAN ALL EROSION a SED WNTAnON CONTROL MEASURES SRAU BE INSPECTED WEEKLY 8 AFTER EACH HRAW RUNOFF RAINFALLAUMMMMY WITH NCDEW REGq T10 NS CONTRACTOR M COORDINATE ALL INSTALLATIONS & INSPECTIONS WITH NCDENR OFFICIALS PERMTS M BE OBTAINED BY OWNER STRUCTURES THAT WILL BE INSPECTED INCLUDE TEMPORARY SEDIMENT TRAP REMOVE SEDIMENT 6 RESTORE THE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED M ONE -HALF THE MMM DEPTH OF THE TRAP PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED AREA 6 REPLACE THE CONTAMINATEDPART OF THE GRAVEL FACING CHECKTHE STRUCTURE FOR DAMAGE FROM EROSION OR PIPING PERIODICALLY CHECK THE DEPTH OF SPILLWAY ENSURE IT IS A MINIMUM OF 1 S FT BELOW THE LOW POINT OF THE EMBANKMENT IMMEDIATELY PILL ANY SEDIMENT OF THE EMBANKMENT M SUGHTLY ABOVE DESIGN GRADE ANY RPRAP DISPLACED FROM THE SPILLWAY MUST BE REPLACED IMMEDIATELY AFTER AIM SEDIMENT PRODUCING AREAS HAVE BEEN STABIUZED, REMOVE THE STRUCTURE 6 ALL UNSTABLE SEDIMENT SMOOTH THE AREA M BLEND MATH THE ADJUMM AREAS 6 STABLZE PROPERLY SILTFENCE MAKE ANY REPAIRS IMMEDIATELY SHOULD IRE FABRIC OF A SEDIMENT FENCE COLLAPSE TEAR, DECOMPOSE OR BECOME INEFFECTIVE REPLACE IT PROMPRY REPLACE BURLAP EVERY SO DAYS REMOVE SEDIMENT DEPOSITS AS NECESSARY PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN 6 M REDUCE PRESSURE ON THE FENCE TAKE CARE MAVOID UNDERMINING THE FENCE DURING CLEAMM REMOVE ALL FENCING NATEMALS 6 UNSTABLE SEDIMENT DEPOSITS 6 BRING THE AREA M GRADE 6 STABLZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STANUZED CHECK DAMS IATCIPATE SUBMERGENCE 6 DEPOSITION ABOVE THE CHECK DAM AMD EROSION ARM HGH FLOWS AROIJW THE EDGES OF TI EDAM CORRECT AU DAMAGE IMMEDIATELY IFSIGNIFICMTEROSIONMCURSBETWEENMMS , INSTALLA PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL REMOVE SEDIMENTATION ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE M CHANNEL VEGETATION, ALLOW THE CHANNEL M DRAIN THROUGH THE STONE CHECK DAM 6 TO PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM ADD STONE M THE DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT 6 CROSS SECTION SEEDING RESEEDAREAS WHERE SEEDING EMERGENCE IS POOR, OR WHERE ERCSON OCCURS AS SOON AS POSSIBLE CONSTRUCTION ENTRANCE MA] WAIN THE GRAVEL PAD IN A COMDITI ON TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTON SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 21NCH STONE AFTER EACH RAINFALL, INSPECTIONY STRUCTURE USED M TRAP SEDIMENT &C LFANITOUTASNECESSARY IMMEDATELYREMOVEALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADS DIVERSION DITCHES CHECK OURETS & MARE TIMELY REPAIRS A6 NEEDED TO AVOID GULLY FORMATION WHEN THE AREA ABOVE THE TEMPORARY DIVERSION DITCH IS PERMANENTLY STABILIZED REMOVE THE DIKE &FILL & STABILIZE THE CHANNEL TO BLEND WITH THE RATURALSURFACE OUTLETPROTECTION INSPECT HPRAP OU -ET STRUCTURES AFTER HEAVY RAINS M SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP WAS TAKEN RACE OR IF STONES HAVE BEEN DISLODGED IMMEDIATELY MAKE ALL NEEDED REPNRS M PREVENT FURTHER DAMAGE STOCKPILES CHECK STOCKPILES FOR SILT FENCE EFFICIENCY SEDIMENTATION BSTABILIZATION ROCK DAM REMOVE SEDIMEW 8 RESTORE ORIGINAL VOLUME WHEN SEDIMENT ACCUNNUTES M ABOUT ONE HALF THE DESIGN VOLUME CHECK THE STRUCTURE FOR EROSION PIPING 8ROCKCHECKUSPLACEMEWT EREACHSIGMMC MNSM M& REPAIR IMMEDIATELY REMOVE THE STRUCTURE 6 AM SEDIMENT IMMEDIATELY AFTER THE DSTURBED AREA FLOWING M DAM HAS BEEN PERMANENTLY STABILIZED SMOOTH THE BA61N SITE TO BLEND WITH THE SURROUNDING AREA & STABILZE ALL WATER & SEDIMENT SHOULD BE REMOVED FROM BASIN PRIOR M REMOVAL SEDIMENT SHOULD BE PLACES IN DESIGNATED DISPOSAL AREAS 6 NOT ALLOWED M FLOW INTO STREAMS OR DRAINAGE WAYS WRING STRUCTURE REMOVAL EROSION CONTROL MAINTENANCE NOTES 1 BED MENTSHAMBE REMOVED&MAPRESTMEDTO ITS ORIMNALDIMENSIMS WHEN THE SEDIMENT HAS ACCUMULATED M ONEJAIF THE DESIGN DEPTH OF THE TRAP REMOVEDSEDIMEWSYALLBEDEPOSITEDWASUTABMAREAINSUCHA MANNER THAT IT WILL NOT ERODE 2 ALL EROSION SEDIMENT CONTROL STRUCTURES SHALL BE INSPECTED AT LEAST ORE EVE R CA EDR DYS 6 WHI N 24 OUS OF N SOM EVEW OF GREATER TA N}RAININ A2HOUPERIOD DRAIN GAUGESTALLBE E ON THE SITE 8 A RECORD OF THE RAINFALL AMOUNTS 6 DATES SHILL BE E KEEP KEEP SEE SPECIFIC MAINTENANCE FDR EACH EROSION CONTROL MEASURE THIS SHEET. 3 A RECORD OF INSPECTIONS BY THE CONTRACTOR SHALL BE KEPT 8 MADE AVNUBLEMTHEINSPECTORUPONREOUEST VISIBLESEDIMENTATIONFOUND OUTSIDE THE DENUDED AREA UNITS SHALL BE RECORDED 6 A BRIEF EXPLANATON KEPT WITH THE RECORDS AS M THE MESURES TAKEN M CONTROL FUTURE RELEASES ANY MEASURES TAKEN M CLEAN UP THE SMME W THAT HAS LEFT THE DENUDED AREA UNITS SHALL ALSO BE RECORDED 4 CI-EANDUT STAKES SHALL BE PLACED IN ALL SEDIMENT BASINS AT THE LOW POINT IN THEBASIN THE STAKES SRALL BE MARKED SHOVING THE INLFFUL LCLEIWOUT POINT, OF THE BASIN 5 BAFETYFENCINGSHGHSHOULUDEPIACEDMOUNDALLSEgMEWBASNS 6 FOR DESIGN OF RISER TYPE SEDIMENT BASINS, REFER TO THE NORTH CAROUNA DEPT OF ENVIRONMENT HEALTH, & NATURAL RESOURCES EROSION A SEDIMENT CONTROL BANNING & DESIGN MANUAL 7 THE BERM ON SEDIMENT BASINS SHALL BE SEEDED ONCE FINAL GRADE HAS BEEN REACHED. THE SILT FENCE MAY BE REMOVED IF PERMISSION HAS BEEN GRANTED BY THE NCDENR INSPECTOR AFTER THE GRASS HAS GERMINATED & STABLE GROUND HAS BEEN ESTABLISHED EROS. CONT. MEASURES MAINTENANCE PLAN EFFECTIVE OCTOBER 1, 2010 PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT THE SEDIMENT AND EROSION CONTROL MEASURES ON A PROJECT AFTER EACH PHASE OF THE PROJECT M MAKE SURE THAT THE APPROVED EROSION AN DSEUMENTATIONCONMOLPIANISBEINGFDLLOWED SELF4NSPECTONREMRTS AREREOURED ASAMRESELF4NSPECTONREPORT ,ASWELLMDETNLSOFTHE SEIF4NSPECTION PROGRAM, CAN BE FOUND ON THE LAND OUAUTY WEB SITE HTTPJlMRTALNCDENR ORGNYEB - MEROSIDN AS A MINIMUM, THE INSPECTIONS SHALL BE PERFORMED AFTER EACH OF THE FOLLOWING PHASES OF A PLAN INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES b INSTALLATONOFSEU ENTMAPSIASINS CLEARING AND GRUBBING OF EXISTING GROUND COVER A COMPLETION OF ANY PHASE OF GRADING THAT REOURES PROVISION OF STABILIZATION INSTALLATION OF MEASURES WRING ANY PHASE OF THE PROJECT N COMPLETION OF CONSTRUCTION OR DEVELOPMEW 9 INSTALLATION OF STORM WATER REMNDON MEASURES. h OUARTERLYUWIL THEESTABUSHMENTOFPERMANENTGROUNDCOVERIS FULLY ESTABUSHED GENERAL EROSION CONTROL NOTES 1 ONSITE BURIAL PITS REQUIRE AN ONSITE DEMOLITION UNORLL PERMIT FROM THE ZONING ADhIMSTRATM AND THE DIVISION OF WASTE MANAGEMENT, SOLID WASTE SECTION CONTACTTERESSA —GROAT (701)) 66}1899 FOR PERMITTING REQUIREMENTS FOR ON-SITE BURIAL ON INERT MATERIAL 2 ANY GRADING BEYOND THE DENUDED UNITS SHOWN ON THE PLAN I6 A VIOLATION OF THE EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE 3 GMUM MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE NCDENR EROSION CONTTROL ORDINWOE MD IS SUBJECT M A FINE T FORM ERROL CONTROL TEMPORARY SEEDING IS 4, STABILIZATION IS THE BES F R N NECESSARY TDACHI EVE EROSION COUTIROL ONURGE C AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE T1HE CONSTRUCTION SEQUENCE SHOWN ON THE PUN 5 ADDITIONAL MEASURES M CONTROL EROSION 6 SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE WDENR ENGINEERING DEPT 6 PORSLOPESGRFATERTHWN21 CONSULTGEOTECHNICALENGINEERMRSWPE DESIGN AND STABILIZATION CONSTRUCTION SEQUENCE 1 011IN GRADINGIEROSION CONTROL PLAN APPROVAL FROM NCDENR 2 SET UP AN ON-SITE PRE CONSTRUCTION CONFERENCE WITH EROSION CONTROL INSPECTOR M DISCUSS EROSION CONTROL MEASURES FAILURE M SCHEDULNA CONFERENCE 0 HOURS PRIOR MANY LAND DISTURBING ACTIVITY IS A VIOLATM OF CODE AM IS SUBJECT M A FINE 3 INSTALL CONSTRUCTION ENTRANCE AT ENTERPRISE DR 4 INSTALL HIGH HAZARD SILT FENCE ALONG STREAM BUFFER AS SHOWN 5 INSTILLL6EDMENTBASINS,ROCKDAM6 DIVERSIMCATCHESANDOTHER MEASURES AS SHOWN ON THE BANS, CLEARING ONLY AS NECESSARY M INSTALL THESE DEVICES STABILIZE SEDIMENT BASINS IMMEDIATELY AFTER WSTAMN ION 6 CALL MR ON-SITE INSPECTION BY INSPECTOR WHEN APPROVED INSPECTOR NU. ISSUE A GRADING PERMIT BEGIN CLEANING AND GRUBBING AFTER PERMIT ISSUANCE 7 ONCE CLEARING GRUBBING IS COMPLETE ANC MASS GRADING OPERATIONS ARE UNDERWAY, BEGIN CONVERTING M PHASE II EROSION CONTROL PLAN 5 INSTALL CONSTRUCTION ENTRANCE AT BUSINESS OR ONCE PERMANEW CULVERT AT STREAM CROSSING HAS BEEN INSTALLED B THE CONTRACTOR SHALL DILIGENTLY ANA CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AD STRUCTURES 10 STABILIZE SITE AS INSTALLATION IS COMPLETED REMOVE TEMPORARY EROSION CONTROL DEVICES AND STAMUZE THOSE LOCATIONS. 11 AMEROSIONCONTROLMEASURESSNALLBEWNSTRUCTEDINACCORdWCEVATH THE N C EROSION 8 SEDIMEW CONTROL PUNNING AND DESIGN MANLLAL U S DEPT OF AGRICULTURE, 8 THE US SOIL CONSERVATION SERVICE, & ALL LOCAL ORDINANCE—STANDARDS 12 TECOWRACTORSHALL PROVIDEGROUMCOVERDNALLE XPOSEDSLOPES PER DETAIL ON SHEET C� 44 13 ALL SLOPES SHAM BE GRADED ND STEEPER THAN THE ANGLE THAT CAN BE RE TNNEDBYVEGETATIVECOVEROROTHERADEQLIATEER ))CONTROL DEVICES OR STRUCTURES 14 REMOVE SKIMMER BASIN ONCE ENTIRE SITE IS STABILIZED U) ?o¢ H wz[_0 ° �2LUw ,¢Umar000 0222 O H: Ln W Z LL p¢oOQ2z0 n a 4 L F Z D W Z p p cc ° W w p¢ w O W TD D-wz °0» Z OZ¢Owwom ~a2 w=0aw !!w L 3 F- ir V� ZW N �� Z m ZWQ � Z � s 0? Z 0 0g o lr-Vl U l^�Y IZNG � Z U) — o Z mwQ U! m E n _ �1 3 1p iLll ''!ff al Ro •• "ssAE 10 ' 4 dA y O H Gy SEAL •••;�'� � �,Aj2�15 •�j28 �1 V Z 0 _J a J Q U o d co L.0 w X W Ln rL H ¢o vv �+ �%1 I Z w ci Z O F- CC T Z O w V i- O O J W yl- GTW Engineer EJ R Dramn By 10/28/15 Dale 619 -001 C1.1 Sheet 2 of 14 — °�� salted P9M Ilom J40e' ALT. CO1MTDIDITT FW. COMPANY - - NO > xC POW IDIOOa1m') 6FECIIVE DAIS �Ou 2462013 - 3 MB. 27 PG 54 �T= SCHEDULE B - SECTION 0 EXCWTONS: \ G1.6a41YN• '- •e m �0 ®2 fly - --��_g_��5� - -I — a— \ � xa� ep I 25' LIHOSCAPE AREA � � ,1 � _mss I . �#-pK rte^ ENTERPRISE' DR. N.W.�$�� ^ - a Ye,t ts, . D ed Yap Bask xt. P°9•a e] ma ee�r.euase A„er 7 I 198] n ue camraa camty A EASEMENT FOR A 5' PATH AY �Sa` 65275' ,�, 60' PUBLIC al Deea al D•d. ma wap eopt 31 pw• 2n rramd oataer ]. 1998 In u. cabana. cantr Regl•tr �1 LOGim MTNW LMDSCwE MFA .oC_ R- I mt RIGHT -OF- - or D..e. (rNmml. and rtbaa. a. .non) fryy1l' D9 1345 Pc In e-°�'' .� �k. - L =67 69:44 MB. 21 PC. WAY a D.daauan al Piet• Cow,anla, Rrlrkllm. and Mgillrturd mlRdlnr d9td Orrnbr 13. 1909 and DR Nw y _new 11 '••y c-N 8176'38' E I _- r_ -__yB 21 PG. 88 mrnn .—L22. d ny -a. Bore RBal.l 7a. %..m of Prat.mi..m"ca .t. a I..WeuonD awn °•',vrrlt «eRd OItEPPW b `A,f �n` ° aXi vu N•d- Y aw I mC I.vc. Cr6766 _J Y'- '--- a -�__r_ — �m m `¢' dale Drrnber t; 1991 and reaerad Decrnber 1; 1994 In Boot 1]45, pegs 12] h the TY t _ - __ Cobma• CanlY R•91•lr of Ded,. as w,PP1m w1 by Su Iene a pgmalim of Protectlwe Co vlml. 91E r• 3 ` _`- �- f -_ _ asp. ` - - -� -� _ -y -��p _ RuNCUm• end ArNlteeNral 4LMtllns• of Th• Inlunallonal BuW. Par4 °t Cme°rq Phase II -A lot 1 LOT 1 }, ' • 7 = J a denied Octebr 3. Ina and retarded Octobr 4 1991 In Be. 1730, page x5] m u. Labartu. Cwnly 3 MB 21 PG- a7 - I _ - -y_ -_ RAMS pl Oed. a• MNr updwnnld by Supplemntay 0•tlrvDm of PnlrU.r Covmmb, / 7A s E .G QW.'eona and MNItr— 4Lldalnu of The mtsnalbnd Bu.*, Park at —.and Phese 1 -A Lot 2 pppLM lFllr gp / /// l a' V •S, r��r I �� B`7 by _ _ ___ 9°' - 1'b M®Nt 4\el Leal DelrnpYan tea .mnaarr, 14, INS and ne r Jan- ry 14 1991 h Book 2067. Pa9a 205 N Ne wbanva county °-�t�� `,t�, _ J ° Rpatr of 0•Ma. a NrNS euPPlemmtea by Sn"N .,I n Ogorotl°n at Pr° .Uw Cawnan4 Lymg mdbmn.m hn ClryofC. -m d N-ber2To shV4C b- Comly.North R..Waum. ma Ar.dm.cWral wle.Inu °r u•ymlrnenma�u•1nr. Pah at e°In . Pheee . C Lai. 17 VICINITY MAP _ / Y'A% -% T s _ -' wwt" - -� = Y :s2p_ _ 6y - a 2D data n 3D zoD3 ma rrmded ua lA 2003 N Boot 4535. p°qe 1 m the eme,ru. ewnty NOT TO SCALE - / �� ° / - � � 1 - - -,d - _ _6p -- -`•.+' ;�-'��� - 1 R- 65z75'm Cetoltae, and lying northwest Of the eulde -bee ofBmmev Blvd NW (60'publtc ppl.lr pr De a W.ur wrpplemmlee by SuPPlemmlary 0•aar°llm of Pntrlln Late 5 an jp € _a •; �- s _ - - -- ' _ _ - �_ - - _ _ �m a _ I_ J L -2519' rightof -way. MaP Book 21 a pages 86, 87 At 88), and lying on the solNUm side of Reele, m. and �rrnlnctara amdnr ar The Intrr,otlmal BuNnra P°rY of Cmmrd Late S me 6, _ J v - Phen II. dated A gian 27. 2003 and need a.Plvnba+ 5. 2003 h 9oci 4e26. pa 55 In u. CIII.. _ � �•- - 1 W-1 a vii w Entup<ve Dr NW (60' pubhe ngyt -af w•aY, Rep Book 2l a[ pegs 87 & 88), and beutg Caant R•gl.tr al D -. a• Wrur .app. --' ll br savPl.mmtary D.aantlm al �r°l.aue. eo cants. -__ '� - -P / _ ��� _.-- - - -��' - - -_- --- -_p1�• r C =25.19' Lot lO ns chows on Mep Book 33 pt page 20, sW being the property ofBedfotd Yrllage, R..tdctlan° arts Armnaamrw �mdmee °f u. mlmratlma Baalnra Pan at cmoart tat 11, PnKK - •aM- -��' aa•.•. Rated .Yoe 2] 20114 ma naard•d July e, 2000 N aoo4 Sa22 pays +ta h tM Cabana. Ceunly Rpatr ___ s_ - - - -- •ru ___ 1 - -- -F � TIE '- SA,dW&Bedford Ydlage,SA.,Inc(Dead Book 2343 at page 92), and being mote elct! Deed, 23u 200 rpplrnnlea bYy 8, 2D nein Deaanum. Piet «t1w Ca a�anle, ReaWctian. and Nmlf Oe3a4' /� a _- ����J•J- - -_ pI� J _-- ___ - -- _- J particuli 1ydescnbedufo11ows Artltrturel dldMhr of III Inlrrlallmm Radnor Park of Canmrd da Decrnbr 2e. 2005 and m / ti<` ' - _ - d fY fee yawl Drrnbe, 29, 2005 h Book 6454 page 43 h 1, Cabanue Countyy Ragl.tr °I Oeeh as Nrthr - - - -- ��_`_ --- ------ _ _ pplemented by Svpplrnmlary Ogrollm er P, I_ Covenant. Rrkkiln and ArMi[rWnl EDP _ _ _ _ _ _ _ _ _ _ _ _ _ 1 Be t m ex am\g #5 rebar, said rebvr being the northeast comer of Lot 11 (Map Wleamr 01 u. lnbnaelna 8a .e. Pak at Cain a. data DalObr za. 2m7 and reoaad alObr 30. 4 _ _ • bethr ea .mnlad b eC m _ - _ _ LI' B met Page 85) end bang m the southem nghtaf -way h�e of Enterprtce Dr NW (60' 200> In Bcd ]e d1 pp• 24] 1. C°barva Ca. Rplatr °I D..e.. a b5- r wb aw _ _ -_ - m3_ - , i 1 Suwm.tj.oj q 0•aa1Un If F1.1-11,w d.y C°vanml., RsWctlma. and Ndanleal M Gii 5. 2• of the 1�1 I(Jna pubic nghtdt- wsy.)&p Boak21 etpaga 87 &88),tbmufivmthe POINTOF Intmauna eadnm Part al cncra, cat's ren+rr ze. 2011 me rraa.a wman 5. 2111 m Itaek MB 60 PG 50 4• n +°" _ _ / \ 1\ 1, iu•I�A / / - - -- _ _ _ _ -- ^ +•' D4 1348 Pa 127 1-R _ _ _ -1;1 BEG21MNG with the southem nghtaf -way � of Enterprise Or NW the fallowing two Dido Page 314 h u• Cabam,• caantY RegMl.r of preen as Nrthr rppl.mmld by SuPPlemntsy an9L ' 4 / . _ _ - _ _ - - 1'�Y mutsa and dlatanea- 1) N 78.18'34" E 222 13 feet m m exr #5 rebar, and 2 with Dqa t C IT Prtrur .-beb, . inn. one Ara,n•ctard =in er u• ' 'I" m' in ° g ) Park at Cmccrd. Bald Drrnbs 11, 2006 one rradd April 9, x001 In Book e169. Page Pl It N• \ / 1� / 1°' ff T"r't5f _ ; the arc afe errnller curve ro die eight hnving a redtus of 652 75 fact, en uc length of 67 69 coven. CwntY Rpatr 4 A,ch NAnr a,�Pperinl•e by 9+pplrnmtary DgnvUm of Prolecnv° artm ea].oF �'• / - ,�• ! / I mAxsal9rn Pw __ - -___ 1 ,� +.v °IOU' feet endacho�d boon end distance ofN 81° 1638 "E67li6 feet 05 rebv, cawrmla R.. Wain. ana Ara,nrmra aledlne. yr ue mt.natwnth Baaln•.. Pan al eneaa. sated ` g Apra 4, 2005 and remrdea Apr9 9, One m Book 1170. ppe 9e h h. Cabart • CanlY Rpalr of R 16BUr a , - coim4 cvPmr \ ` - / _ _ - a]1- ti 11 thence leaving the south= ngbtof - -way hie of Enterprise Dr NW and CoBowing the oed. l a andAn by Ml Amndmnt d. .d N and Realatd Dd recel of PnlrOw . 2009 1.. NO ono LAO aooxml) f '•�(, - - - -_ - 11�� I4 •y • waoemhne ofGnffin(Con (Concord) Fssmbal Asia ReN B, LLC t9, Book 33 at ReWaum. rte ,w,Rrtarm o,ladm... cal °a Ne.anbr l5- Lang ma rrard.a oe4+mnr v. 2ao9 m / ' 1 i I �; Map Da. 5990, Page 2II m u. Cabanas Caunry R•g1•tn ar aids. a. corrrl•d by AmeaNt of Corr•ctln al mrT / _ naa 2m ( - -- _ 1 page 20, Deed Book 11317 et page 87) S I 1 °4126" E 670 11 feet m m cawing #5 weber T1POoyyapnka an our uman friar r•radd satenbr 19, zD11 h eook v7o; page 114 h Vie cabam. NOTES. - - -- Canty Rplatr el Dead. as •upplrrinld by 9rpplrnantary Dgantlm of Piateatl r C-t ,a / - wie5.ad \I 'r - �•.- - -- �' ', T' 1 w cuan m the culde u far Mme of Business Blvd NW (6a pubic nght-Df -way, Map a041dieS j1• _ / I Apra" , _ fcn� py6 Y Rrtdctbn• ana Ar 11Nrma Culddhr °I u• mtrnauma Budn.m Pan at Cmc°rd. 11111 don• f7. 1 TRAVERSE ADJUSTED BY THE LEAST SQUARES ADJUSTMENT METHOD. / - I - 1 ae Baak 21 et 86,87 &BB,Wmce with lwdri htof -wa Line Of Huvneaa Blvd NW 2. AREAS DETERMINED BY COORDINATE COMPUTATIONS n•• pegs ) g Y 205-0 and rrreea .Sore 14 2010 h Book 9192. page 208 h the Cobonue Cant U.. n a p1 / 1 - n 3. ALL DISTANCES ME HORIZONTAL GROUND DISTANCES UNLESS 1 •O°� I f- , / yy OTHER EAS DETERMINED NOTED n °�\ 'I / I I I 1n:In �-3 with tb.- Gf.ctrc- ohr—II m the le8hevtng•Yadtwof60 W, an of11392' NMr nppsnntd by SuPPI•mnlay pgaatlar of Pnlrll.. COwnmt. R..WCUma and Am�,RrWra - ,t \\ I 1 I _ _ _ _ _ _ -- _ _ _ _ _ _�r•a _ _ _� 1 _ 1 1\I; and a chord hearing and dismaceI of S 52 °2SI1" W 97.56 Ceet m e Hence mN the XID b5- . of m. 6, page 23 aa°h..a Pan at raaaw, ietea Augan t9, x010 ana rrardw wga.t 10. _ _ P 2010 N Boot 9254 page 123 h N° Cabana• Cwnty Re9Mr or Dade, a• Nrthr e•Pplvn It by a, AREA IS LOCATED IN ZONE % (AREM•DETERMINED TO BE OUTSIDE THE - 41 -'-- -- Page P1Be ) I=ofCelgsrd, LLC(Deed Book 9192 at 214 &222,Mep Book59aL 63S SupPlemmlmy Ogwa anal ia1w.— Gamin. ReaWcllan. and Arthl[rbva Mm I 1 •n.a _ / - "re• _ 1 1 86°2649" W existing #5 rt6er on hoe at 600 a logl d ctmce of 205 72 feet IneNn°uana aaa ^... Pen °e cnmrd data saembr ; 2m] ma reanrdee seplrnber 3, 2013 n Ba.k 0 2% ANNUAL CHANCE FLOODPLAIN AS SCALED FROM F I R -M MAP 61 _2e+ _ I, (passing m g � loam. pp° 113 m N. Oahu,. Connty RegqYlr °r Ord. °nil as NrUr •uwlemnled 6Yy Supplemntary NUMBER 371056010k,, EFFECTIVE DATE NOVEMBER 5. 2008 \ I I /� - •nv 1 m ®puNng #5 rtber, lhmce with fie eas[em hpe Of Enterprise One Assaelnles, LLC Dee_ el ProtrUr Cownmta. ReaWelln. and Ardiltrtural Gulddlnr al Th. lItem. Md Bu•hev 5 PER MM BOOK 21 AT PAGE 88 ALL DRAINAGE EASEMENTS ME \\ + T1. 'Oa• \' Pan at cpncod. tlatd Dada 14 2014 and r.r>dd Oarobr 15, 2014 In Book 11151. Page N in N• CONGRUENT WITH THE EXISTING NATURAL DRAINAGE PATTERNS IF *\ 111 is i ,pyyy -_ 111 1 I)t (I.a[11, M9p B00k 44 a[pega 85, Deed B00k 5422 e[page IlB and Deed Book 5549 e[ Gabmu. County Rplatr of Deed. DRAINAGE PATTERNS ME ALTERED, THE EASEMENTS WILL SHIFT - "•11'°( I 1 page 76) N 11-38-31" W 68000 fee[ m the POINC OF BEGINNING ^=^04 600 ]. Eae.nnt(a) 1° Duk. P°rr Ceen 11111 July e, 1978 °nil rradd July ]0. 1931 In Book 144 Pp• - 1 11, 4]5 n N• Catwrrve CwntY R•91.1r of De dr did YaY !1 939 and r.rudd Arne 24 1939 In Book ACCORDINGLY TO REMAIN CONGRUENT WITH THE FLOW UNES' - _ _ -_ 'rise 1 luxes 151. page 415 h the Cabana. Caen ty Register IT De°d5 datd Yay 31. 19]9 antl rradd Jun• 24 19]9 6 SOURCE FOR UNDERGROUND UTIUTY LOCATIONS IS AWED ASSOCIATES. \' •Ae1 •, I - _ not 1 1 - In Book 151. page ate h ua Cabarru. County RegMr vl Dead ,eats wvy 31. 19]9 ma neaed Jun. P A CESI IS RESPONSIBLE ONLY FOR THE LOCATION OF AWED - - \• / 1 I an• - 1 j 1 • :4 1939 Book 151, page 4x2 In the Caburu. Canlr RpY1r of Dry; aolea Drwnbr ]t, 1941 and ASSOCIATES, P A MARKINGS AND NOT THE ACTUAL LOCATION OF I.1•�1� 1 t \ 1 ;� rrardd Ap9 25- 1941 m Book 209, page 4]D m tn• Labonae Cwnty Rpatr al Drat a°td May 10, UTILITIES BEING MARKED THERE MAY BE OTHER UNDERGROUND UTILITIES _ -t a aPu I - 1t. rte rraa•a Y°y 1], 1941 m Book 209. pope 519 N Na Cabarua C°untY RegOter ar Oeda. dald ON THIS SITE OTHER THAN THOSE SHOWN BEFORE DOING ANY DIGGING - \I \ '4'1 �••1 \ - —U., 1 1948 and r dd January 14, 1948 In Bork 219, page 251 m N• Cobaru. Counlr Rpatr of e 1 1 /rq•,/ 11 1 + Dews. dots Yay a, 1951 and ncOrtld Auguei !I, 1951 n Book 23], paqq 55 h Us Ceponu. Canty CARL NC ONE -CALL (1- BOG -632 -4949) 5 Pia31 11,.,{, Lie 1 .r4i ,, air n3• oN 7 CONTOUR INTERVAL IS ONE FOOT (1') ) _ Reglelr al Oed; eatd Yay 24 1954 and rradad ,Yin. r 1954 h B 256, Dag• 201 h 9 Cebvrv. B. NC GRID INTERVAL R! (2011) EPOCH 201000 BASS OF BEARING AND NAVDBB P ) I - \ BUItDMG County RpMr of DewdS datd Jonusy 1J. 196fi and revatld A1,9 13. 1968 In Boot 354 pap• 513 I nu \ 1 1 I ,'111 1 (blank•! N eWn) EI£'ATIGNS DERIVED FROM NCGS NETWORK RT% ON 08 -31 -2015 AND �. 1 \ 1 I I •m. - 1 \p _ Eaernnt b puke Parr Campany r•r -vded N..br 5, 1992 h Book 949. 1,— 200 n u• Cabana• G9 -11 -2015 HORIZONTAL POSITIONAL ACCURACY - 010', VERTICAL 1 - 1 ` GRIFFIN CONCORD ESSENTIAL Canty RepYtr of Oed. nor net °Hit rb).at aopsty ( \ 1 1 ` 1 (CONCORD) a Eoarnn[(. to then — 1 Ugbt and watr Crnmltlanre dotd Auaal ld, 195. and rradd ACCURACY - 010') USING FIXED CONTROL STATION CONCORD CORS eJam' \ 11 era 4 aal'n''•e / - �(� \ ASSET RE1T II. LLC _ 0•mnba �. I93e h Book 134. pa Lee m Ne Cabemu CmntY Rpatr of D°eas dated Fatru°ry 13. BEDFORD VILLAGE SA, dINC 1 19M antl r•c°rdd Feava 14 191a •9 MP' (N- 595,611 29', E =1,533,753 95') AND GEOID MODEL GEOID128 q'd - ealkxS �} }� 1 1 BEDFORD NLIACE, S A, INC •n4e DB- 1731] PG B7 ry SB h Boot 253, pp• 84 h Ne Cmarrue Cwntyy R Mtr or Drar, PROJECT LOCALIZED HOLDING CONTROL POINT x1001 (N =fit ;669 -41', N t' - rYrr q 1 , 111 I I �'� DB 2313 PG 92 1 1 ALL OF LOT' OT 9, MB 21 PG B7 h - and anted Febrvory 13, 1958 end rscrawa Febrvory 14 1958 h Body 283. page e5 h N• Cabam. E =1.505,15934'). AND A COMBINED GRID FACTOR OF 098984951 ee]ty ��\ \ Igj• \ PMT OF LOT 10, YB. 21 PG. 88 \ \ , A PORTION OF LOT 10, MB 21 PG BB UNITS ME US SURVEY FEET - 1 VIII •O1° i / \ LOT 10, MB. 33 21 70 . Canty Di of Oraa ! .1 U t h nature} y \ \ \i 11 / 1 1 ALL OF LOT p, M& 33 PG 20 UmVa EApnT 6. to Bead a1 Ught and Walr CanmWlanen, Cnvad NC dated weal. ail, 1911 and 9. VERTICAL DATUM IS NAVDBa - \' �•r++a1 ` - / - \ 10, MEL 33 P eon 1 q 5501 -52 -7446 - re #dPrvprtY) 1914 h Beak 57; pap• 297 In the Cmanua Cant Rpatr of Drs. (doe not °HM 4 800 AC .��an REFERENCES II i 11,� II i /' _ _ \" 4535 EN ZONED 1-2 7( PER CABER ZMARRU SC GS)._, er4a 1111 °rz +M \N a 9. Rlgnt -a5- -WRY to SaNrn Parr CanP°^Y decd YoY 11, 1907 and racaad .hoe IB, 1907 n Soak b4 - paq• 328 In Ne Canmrue CanlY Re9lals o1 Drd. (binket h '1001.) 10 Rlghtrol -Way t° __ TdePhne CanpanY. Inc data w°yy I4, 196] anR rraad Yay ]5. 1953 n Book ]27. page 4x1 m tA. Cabana. Canty Rpblr of Oeedr. and tletd Aupuet 10, tp48 ma reced - 1 ALL DEEDS AND MAPS SHDWN HEREON 11 1 1 1, 1l.na \ - ,m _ - _ _ t 9 i Au9u•t to, 1948 n Boat 24, page 201 n N• CabanaI CauntY R•glalr al Deal. (.-.t h natun) 2 MM TITLED 'RECOMBINATION PLAT OF PROPERTY FOR LOTS 9 AND 10: THE 1 lerv,111 iIL - i •.n• - ,1 ` g a - . INTERNATIONAL BUSINESS PARK AT CONCORD' BY CONCORD ENGINEERING - & SURVEYING, INC, DATED JUNE 30, 1998, JOB NUMBER AB0534: MAP BUIlDM9 ,111 - BOOK 33 AT PAGE 20 - - 3. MAP TITLED THE INTERNATIONAL BUSINESS PARK AT CONCORD PHASE I -' ' °x11 +5-'1 • al/ ,n,a \ I - - MM TWO' BY CONCORD ENGINEERING & SURVEYING, INC., DATED APRIL 29. _ • - 6 U' 1 I m BUILDING 1987, JOB NUMBER 96- 01 -09. MAP BOOK 21 AT PAGE afi Z ,,n 1 kn�` •III"' - •^ - _ •ma ' °'•° I ©- . 4. MM TITLED THE INTERNATIONAL BUSINESS PARK AT CONCORD PHASE I - 1\ t -' .nil. 1 e MAP THREE' BY CONCORD ENGINEERING k SURVEYING, INC, DATED APRIL m1�11' I i i - ' /•° �p 11 ' \ To Bedlortl Village, SA (d/b/. Bedlord Ylllage. SA. Inc, a Panama rorporatlon) and Chicago _ \ M I TIUe Inauranae Company 29. 1987, JOB NUMBER 86- 01 -09. MM BOOK 21 AT PAGE 87 L e�a\ ^ ^vl 1 ` / °°' -- Thle b to cerllfy that this map or plat and the survey an Which It la based rero made In ' 5. MM TITLED THE INTERNATIONAL BUSINESS PARK AT CONCORD PHASE I - g.�. wild I I •, n{• c,ndence With the 2011 minimum standard detail r qulrrnente for ALTA /AGSM Land TIUe MAP FOUR' BY CONCORD ENGINEERING & SURVEYING, INC., DATED APRIL dE I I1 1.� \\ 5. 29, 1987. JOB NUMBER B6- 01 -09, MM BOO( 21 AT PAGE 88 - - 1 I II 1' 1:. I �` •� - Surery,, Jointly established and adopted by ALTA and NSPS, and Induda Items 1, 2. J, 4, 6 YM TIlI.EO 'ALTA AGSM LAND TITLE SURVEY OF: BEDFORD VILLAGE, SA, - 1 I I,�1 - / I • ^° \ - - 6(a). ](a), B, 9. 11(b), 13, 16 and 18 of table A Nereo} The TIdd fork was completed an / 1 I �€ 1 S• tember 23, 2015 - _ INC ' BY CESL LAST REVISED 02 -25 -2015, JOB N0,• 150050000 ENTERPRISE ONE ASSOCIATES, LLC P DES 5422 PG. 118 p, 7 MAP TITER -ALTA /AGSM LAND TITLE SURVEY OF- LOT 11 - THE - ,1 1 e\.a'~I �GK \ I � 1 \ h•e•,g Data of plot or map October 29, 2015 - - DB. 5549 PG 76 PG INTERNATIONAL BUSINESS PARK AT CONCORD' BY CONCORD ENGINEERING -- - LOT 11, MB 44 PG 85 1 I\ • In 1 13 I •N°• i r2 mo d SURVEYING, INC, DATED 1SURVE2005. JOB NO 0 511 02 0 0 0 St101 -52 -0374 ' B MM TITLED 'RECOMBINATION GINEE I G LOTS 14, N AND 76 PHASE - NO BUNNNGS EIaSTING O5- \ 1 o <i \ \111N11r µ�( MM THREE' BY CONCORD ENGINEERING k SURVEYING, INC, LAST REVISED P' I 1 ,11 x00 lITES PEASEMENT THE SLR\ENM PROPERTY g• 1` : \`t{ GA I "" _4H•�- APRIL 19, 1994, JOB NO 94-DI -26. MM BOOK 27 AT PACE 54. - • I 1 11 1� /, der°. \ �intn `�Jpt R ( o 9 MM TITLED 'RECOMBINATION PLAT FOR LOTS 11 AND 12 - THE '1!I 1 rAv 1 Trno \ - 11 1 \ - < O 'OQE6. O,5-. INTERNATIONAL BUSINESS PARK AT CONCORD' BY CONCORD ENGINEERING BUILDING _ _ R SURVEYING. INC, DATED 05 -16 -2004. JOB NO.: 040511 005. MM 11 °Ta 1 \ \\ •ms �� O6i �'- 1F 11' - z S BDOK 44 AT PAGE 85 _ 1 1 1 I \ \ sA 111,+1 1 tM = I, paNd L Haywood. Jr, -Uty that this plat as drawn under my supernIdon 6om a 10 MAP TITLED 'RECOMBINATION SURVEY OF LOT 7 h LOT B. THE '2 1 .bv .Aar/ - - - - -' 1 INTERNATIONAL BUSINESS PARK AT CONCORD- BY CES, DATED 5 -7 -2009 _ - 111 I I\ 1 ' 1 ( 1 \ \ 1 I map. survey pen MB. , page my mnd MB , a recorded In he 2343, page e 2; n \ S recorded In MB. 21, pa 88 and MB 33, page 20) that the dead, orlee t JOB NO 080515000, MAP BOOK 56 AT PACE 90, _ _ _ - may\ I I 1 1 ,1 ' 1 I \ 1 1 JAl 1 Y Pv¢ 1 N 11 RECOMBINATION MM BY R B- PHMR R ASSOCIATES, Pk. DATED �a(:1 1 '+ 1 L 1 \ \ _ �'I�,N�`� 11 ( '' // •( •HA \\ {y /s ma eKd are dearly Indlcatad9m drown from infarmatbn }nand In deeds m .hovn, that DEC, 16, 2009: MM BOOK 59 AT PAGE 63. 111 \ 1 'I 1 f \ \ \ 1 1 ' / / / / /rill i' L1 \.� /I/'I Ue rollo of proclaim Is 1 26.00D, that this map meet, the requiremmb of the 12 MAP TITLED 'FINAL PLAT THE INTERNATIONAL BUSINESS PARK AT _ I I 1 1 1' \ \ 1 \ \ �% ` + et..d.rda of practiva far Land Surveying m NMh Cardna (21 NCAC 561600), that I I ` m c standard, as CONCORD PHASE 1 - RECOMBINED LOT 12' BY CES, DATED 06 -03-2011, ' I I 1 PPa1 1 \ \ V°+°• \ .v _ 1 I 1 - tits topo9raphle survey rail per /armed to meet national map a racy s JOB NO 100636000, MAP BOOK 60 AT PAGE 50 1 \ \ •� _ 1 \ applicable, that the topographic data wan obtained between C grid HAD d \ I ( \ 1 L _ \I '` 09- 23-2015, that dl horizontal coordinates are based m NC grltl NAD 83 n(2011) 11.1 \ IS' ,' EPOCH 2070000, and that the -tl..l datum la NAVDB8. .�\ - Witneas rI 1 sl t and seal this the 29th day of October, 2015- ' _ - II �, \�• i, � I. LI 11 11 1 / ��� \ 1 \5-m+ my o gins 9no ire LEGEND _�\ • (� - - / //�l // EXISTING IRON PIN (AS DESCRIBED) d/ WS VALVE 1 •+• i•wa % / / 25' LAHOSOAPE -AREA 1 �1, ■ EXISTING CONCRETE MONUMENT ® GAS MANIFOLD •I EA4]RNLPoFA 5' PATHWAr' \ I rr\ F 1 I •Sr I h / / tDC�Tm'Mn+w L/,)IOSGPE AREA \ 1 6/ �F• 34 NO POINT SET I' I 1 1 1 { I I I - / ywood. 8 WATER VALVE ,.yy / q L -4822 SPOT ELEVATION 8 WATER METER eve 6+111' 1�•� \ \fwt I \/m / - DB 1315 Pa 12] -/ •.Zk ' L /q :5E OaNd L Ha Jr.. PIS •® SANITARY SEWER MANHOLE HYDRANT NY- r�l.]N �l -\C' �\\ 11 • ��� �•.�� - °A+ •�_ ® STORM DRAINAGE MANHOLE ® WATER VAULT yai4p• / \ \ t-0r��\ .�- ^I{y I ' i - -- t9 JS- -••5-, -45-'. m�O / �.1 O 6 - - © ELECTRICAL MANHOLE © TRANSFORMER 1 \ \,`1` I / I• �� _xatnrarsr __ - •0' !' // __ —y111 6d° ` e 's�� 1 - UGHT POLE Or TELEPHONE PEDESTAL I i ♦ \ ` .p, m3))/ / / e� va p 'd ' elcaa_ _`� Q \O QOCa' $�O SIGN 0 CLEAN OUT •r%• ) \ \ ''ti // 2 r r• f xAwee my - rT ex Vii'" o FIRE DEPARTMENT CONNECTION B EIFCTRIC VAULT - iYC9Wrs Am - _ \ J? / y .... -- N 64.'�.yy [ i i i tSPasm _ T • - ® WATER BOX 99 ELECTRIC METER 91sr,Nm 9eoeK - \ \�` %(' / f y� i ru �a a5- )/ w T' -cute' ' / G' Q 0• •I•� - R ELECTRIC BOX ® CABLE TV PEDESTAL A�riil a]it �\: \gv� \i�\ qY'!\{^'+•1 /�f �a6'Y'� - ,p®ae� xNEti R�AEWNAif our -eupC �' Y►,q ry\ TIE UNE ¢uTn ff aw \ 1�'£�� / u5- _ /� _ l-P i i 80UNDMY AS SURVEYED ,5-.L• ,K ,a, / S 882fi'4D' Y� ' 9 ,'` 31 / m N ^YS NOTE /5 �.� O / - - - - - - - - - - - - BOUNDARY BY DEED OR PLAT RIGHT OF WAY l\ 11 /��(- W_'Q _ \ /'➢+' W _ _ 6� 84 yyt, - - __— __— _____— EASEMENT r \ \t1'.;. r\,r'"50' Nil - SETBACK - 1q ua m NT /i - - - - - - - - - - - - - - DRAIN `•\ SEE NOTE �_ i� - - f�lAl _ -_- -___ --- _9 - -__p SANITARY SEWER LINE Mme ,� e•a6� -�i .�J7j /y„ p¢t� / � - - -- - - -- - - -- - - -- STORM DRAIN UNE 25' PEDESTIEIM 1 4 ,� _ I - a,am'� / / / -- w . fW�f �n���^y'R�EJ/ ALTA /A@I LAND TITLE SURVEY FOR: a a __ _ 6p :o — Lot 10 The International Business Park ---- ,---- r---- w---- w - - - -w- WATERLINE ACCESS EASEMENT aw ( -- -` ? it " IM" �.� �- ' - -- i---- ]---- r---- T - - - -T- UNDERGROUND TELEPHONE LINE DB 1345 PG 12] - - • -�- - �e� _ _.. _ }V ' -- - - d �_N� �'' `e at Concord, Phase _ 10' UT' TES E SIENT wA -- - -- _-- -p_. -_ __ -�- UNDERGROUND POWER LINE ate __ _ Y 'I �. U »= II DO. ]45 .`G Il s �x l- CITY OF CONCORD, NO 2 TOWNSHIP, CABARRUS CO.. NORTH CAROLINA - -- - -- - - -- - - - -- - GAS LINE mea4iE 5-:.1+1'5— ^ %'�'i�n°• i p ri�.y� r�vem��.r ® ® FOR: - - -- - - - -w- - -w - - -- UNDERGROUND CABLE TV LINE neeQHr y (499.77/ / �4, A' / I t • _ BEACON PM1NETt5 TREE LINE _ _ - - - - m �3 i / -/� - /. 1 -- R =60 - ,�" / 610 E MOREHEAD ST. SUITE 250 �/j -T`" / (900 / ��P" L- 11392' - -'P / - ____ ____ _______ ___ _ ___- MAJOR CONTOURS - - @m-7- / T / / O J /,/ CHARLOTTE, NC 28202 i -- 11 mNEB ��' ��`` NCB-S 5275'1Y W / ------------------ - - - - -- MINOR CONTOURS N !15.37'22' E Y- •pro 1a u Iq - '.� f _ -NVi \ C =9758' 1� / DATE 09- 23-2015 COMPUTED BY RM CURB k GUTTER mt/ Gd�.tE 2 &51' TIE iii i' L ¢�/ .0.\ I �!� y IIte. � �� r -' +y \. W } w5- JOB NO I' 150.725000 CHECKED BY. DLH asses g�4'p f16'Y'9a- art 4Y /" \e3'� eN.u• - �- •1 acuE w r¢r x� ,4� yR�•� - ssi w, - e9 tin wd - 11645. / / I� / a ? m]3s ��E 2A 15 CELGARD, LLC o 40 J [ w b' - es1xY I - w LOLAROXIM N AA1Y E OB 9192 PG 214 LAND OEVELOPYENT SERVICES /' aN m DB 8192 PG. 222 Y )r 4a SPRING StaaT sw' urox Vic[- lNoo244e))3>ee -54w e520Y We In AISA Ya••1O'6 ,ad. MB. 59 PG 63 1 - mXCOeD.. 2m2.'1 rAi (m•) ]Y -7454 �t�/ _ Y4 xt PG 06 M16d'n W01 -51 -4501 - y 0mw. AG9 ore tws2ima.a.9 It I It l!l u In //11 4 /r/ r/ m /i m / ui fit /// li m l 1 li, I a, , n I I`r i I / 1 If 1IP I� Iild � / NIpN I II 1 1� Ilj ry fll a I 1 nl 1 9 1 al 1 f III p IIII I' I 11 w o I� III _LD ir l+ co II IIII � a i;IB 1111`w ;I Nn1 ''Z j I' 111 W ppp III 111 11 nl I ' 1 1111 II 11(111 0 1 11 III � I�Ij i0 11 ;1 I 1ip� 4 111 IIII i I I I III I 1 1 1 IIII 1 �' I nu a jl� III I �jIII 1 IIII 1 � j 111 I I I \I�\ III X111 11 \0 tl II I Tt 'III I 1> II 21111 E •� 30 Ff3 cr Lu n 9". ( 01 W � Ijtil 1 \\ � 1°L � b,11 it \ \ EXISTING CURB d GUTTER B ,I 7) It III 1 1 1q S O S UC O 1 4 5 ACRES TO BE REMOVED SAWCUT EDGES NOTIFY CITY OF I i `� ,fn NII \ \\\\ CONCORD PRIOR TO BEGINNING WORK WITHIN PUBLIC \� 1 ROW CONTRACTOR SHALL PROVIDE NECESSARY 1 \ , L L LI MAINTENANCE OF TRAFFIC PER CITY REQUIREMENTS t — ��' i � `, \O - -i \\ \ I I I �' ♦ \\ 1 -- - �`\ � 1 I III �\\'i` 11i1 ____ __ — r a • I 1', 11 ' 11 1 a ! i f 1 EXISTING TREE c ' e p 1 i1 iTO B m E REMOVED — — — — — — — U71UTIES EASEMENT — — _ — a _ _.° r — _ _ — �-/ � , 'r 1.x-1 • F If r,l ql T — 25 BUILDING SETBACK 1�,' \ I 1 I pk i EXISTING STORM INL d ET PIPING 1 1 a dl j- I• `` TO BE REMOVED J- af ,� II I 1 I' I�v 1 `,t 1 I� /n 1_ 1 �I�jl /I_I_ `I LISTING CURB d GUTTER I EXISTING HYDR NT $ �`,�� \� ' 1 ,' TO BE REMOVED SAWCUT EDGES NOTIFY CITY OF j� I TO BE REMOVED AND SALVAGED ` ` ',l l r�, ICONCORD PRIOR TO BEGINNING WORK WITHIN PUBLIC II I h� ROW CONTRACTOR SHALL PROVIDE NECESSARY 1 MAINTENANCE OF TRAFFIC PER CITY REQUIREMENTS 20' UTILITIES EASEMENT EXIS77NG 1 CONCH U " -( I 25' LANDSCAPED AREA 41 I TO BE REMOVED ) EXISTING SANITARY SEWER \ !r NO MPORY IS I STOIC 1\�0 / REFER TO GEOTECHNICAL REPORT STOCKPILES MAY BE PARKED ON I \ S r2CY i' I I FOR GUIDANCE ON DISPOSAL OF \ OR PLACED OVER EXISTING SEWER I I NON - STRUCTURAL FILL 11 \ r ',1`\ , (1 c'� \ \(\ \ \ EXISTINGV GETATION REMOVED --------- - -- - -- - -_ - - -- - --- /' g,., i.Y Kl ` \1 Ilk\ \\ \� \1 \ .p \\ 25'BUILD INGSETBACK - - - 7 TIIES7EK EME_ _20 UTI N7= T'- - 30SANITARY SEWER FASEMENT 21 30 _ \ \ \ \\ \1 Y \ \ \ � y Z5OQ I- w z ° z= w w 8 I-¢U 0000 Nm400 FZ MCC z�¢p OazZO ¢ }zz °wZOa� It O F Q Q 0¢ w O W y a W Z 0 7 w Z =¢ Z G Q J w Q ~aw ¢OOa¢ w 3 Z Lll N LU< Wy ti F_Zo Fz ��c,0 wa o 0 �Z(n � °z � m COWQ -S ° ¢N� s� � •,ess`�yi ' F O Z,•. Y i N ...10j2 z J z z D J J m> ¢ d U o0 z w D) O �Eo C/) (L. J OZ O �WZ w 0 p J m rn GTW Engineer EJR Drawn By 10/28/15 Date Revlsrons 619 -001 C2.1 Sheet 4 of 14 IACRES S S C O 1/ \• - \ \' ` ````` ```` ` ` ` 45 I IIII NOTE: DEMOLITION LEGEND DRAWING INFORMATION 1 I / ALL WORK IN CITY OF CONCORD RM COORDINATE CLOSELY WITH UTILITY TO AVOID DISRUPTION OF /% �/ - EXISTING INFRASTRUCTURE TO BE REMOVED TRUE NORTH PLAN NORTH IS SUBJECT TO ENCROACHMENT COMPANIES ,: NOB7NCAROI /NA I PERMIT AND DRIVEWAY PERMIT SERVICE. CONTACTS LISTED ON COVER W N�T1 CONDITIONS SHEET EXISTING MISC. 8 UTILITIES TO BE REMOVED u �� 0—call C.°re. Caff 811 Before You Dig E � - EXISTING TREE TO BE REMOVED ® \ NOTE: NOTE: GRAPHIC SCALE CONTRACTOR RESPONSIBLE FOR COORDINATE DEMOLITION WITH DLO° • PROPOSED LIMITS OF CONSTRUCTION o 11 OBTAINING DEMOLITION PERMIT(S) EROSION CONTROL INSPECTOR 1 - PROPOSED TREE PROTECTION ( IN PST ) 1 Inch - So (L y Z5OQ I- w z ° z= w w 8 I-¢U 0000 Nm400 FZ MCC z�¢p OazZO ¢ }zz °wZOa� It O F Q Q 0¢ w O W y a W Z 0 7 w Z =¢ Z G Q J w Q ~aw ¢OOa¢ w 3 Z Lll N LU< Wy ti F_Zo Fz ��c,0 wa o 0 �Z(n � °z � m COWQ -S ° ¢N� s� � •,ess`�yi ' F O Z,•. Y i N ...10j2 z J z z D J J m> ¢ d U o0 z w D) O �Eo C/) (L. J OZ O �WZ w 0 p J m rn GTW Engineer EJR Drawn By 10/28/15 Date Revlsrons 619 -001 C2.1 Sheet 4 of 14 SITE KEYS UTILITY KEYS r WATER LEGEND ,�NOIP IMPERVIOUS CALCULATIONS PAVEMENT HATCH LEGEND ONEW V• CONCRETE CURB b GU1TER SEE DETAILS ON SHEET C70 NEW COACREE SIDEWAl1C SEE GENERAL NOTES ON SHEET C1 t {DETAINS ON OSHEET LIO NEW ACCESSIBLE RAID IN ACCORDANCE WITH N C ACCESSIBILITY CODE, RDA. CITY OOF CONCORD REQUIREMENTS b SPECIFICAOONS (GS 20.T- Bi SEE DETAILS ON SHEET C]0 Oi NEW ACCESSIBLE PARKING SIGNAGE SEE DETAILS SHEET C]0 OO AODIO NL HORMATON THIS SHEET ENTERAL NOES ON SHEETCt LAND ONEW NORMA IASPINLTPAVEONT SEE SHEET NOES ON SHEET Cttb O ADO ROMOL DUTY ASPHALT SHOWMEN TSE SHEET NEW HEAVY DUTY ASPHALT PAVEMENT SEE GENERAL NOTES ON SHEETCt tb ADOTIOINL INFORMATION SHOWN ON THIS SHEET Oe NEWPAINTSTRIE TWIDE,WNEINCOLOP ONE W DRIVEWAY ORIVEWAYTOBETOTHECITYOFCONCORDSTANOARDS SEE DETAILS ON SHEET C/ 0 NEW FIRE DEPARTMENTSIGNAGE THE METAL AGO SIGN WILL CONSIST OF S' HICK 1' OLETTER STROKE RED REFLECTIVE LETTERS ON A WHITE BACKGROIJND, AND SHALL BE PERMANF_NRY ATTACH ED IN A VISIBLE LOCATION APPROVED BY THE FIRE MARSHAL ONEWID— CONCRETE TRANSFORMER PAD E) NEW 2- PVC PRIVATE DOMESTIC WATERLINE (POTABLE) NO WC ALLOWED WITHIN 5 FT OF EITHER END OF BACK OVV PREVENTER. NEW 1'COMERGAL DOMESTIC WATER MEER(POTABLE USE) IN BELOW GRADE BOX O CONTRACTOR SHALL ARRANGE O CONTRACTOR PY REOUIREDATAP ME{CAPACITY CHARGE FOR WATER b SANITARY SEWER NEW 2-(DOMESTIC WATER) RPL BACKFLOW PREVENTION ASSEMBLY INSTALLED ABOVEGROUND WITHIN HEATED INSULATED ENCLOSURE PER CITY OF CONCORD O PER CITY OF ONCORD REOUIREIVEHTS SEE DETAOILS ON SHEET CT IISSELECEDR BACNFIAW PREVENTION ASSEMBUESSHALLBE ACCORDANCE NTH APPENDI%'B'NC RULES( TITLE151 -16C)b GTYOFCGNCOROREOUA MEN CONNECT TO EAS11 ITWAERUNE CONTRACTORRESPONSIBLEFORTAPFEES O TAP TO BE MADE BY CITY OF CONCORD ONEW 6'PRIVATE ARE LINE(CSOO PVC PRESSURE PIPE) NEW e•( FIRE) RPOt B1GCFLOW PREVENTION ASSEMBLY WITH BUILTJN LOW FLOW METER ASSEMBLY BICKFLOW UNIT INSTALLED ABOVE GROUND WITHIN HEATED ENCLOSURE PER CITY OF CONCORD REQUIREMENTS METER TO BE REPLACED NTH OCITY PROVIDEDMEER ENCLOSURE TOINCLUDE DRAIN PORT(S)FOR DISCHARGE WATER PER CITY OF CONCORD REQUIREMENTS SEE DETAILS ON SHUTCII ONEW SDIAMETER STORL FIRE DEPARTMENT CONNECTION PER CITY OF CONCORD FIRE DEPARTMENT STANDARDS AND SPECIFICATIONS O NEW ARE PIMP ROOM SEE ARCHIECYLIFAL PUNS FOR DETAILS SALVAGED ARE HYDRANT HYDRNJTTO BE APPROVED BY AND INSTALLED PER CITY OF CONCORD FIRE DEPARTMENT STANDARDS HYDRANT LEADS SHALL BE O CONSTRUCTED OF T DUCTILE IRON PE WTH RESTRAINED JOINTS SEE DETAIL ON SHEET CII FEESM TAP TO BE I MADE BY CRY OFF COTNCORD CONTRACTOR RESPONSIBLE FOR TM NEW PRIVATE IRRIGATION WATERLINE, METER AND BACKFI-OVY TD BE DESIGNED AND PERMITTED BY IRRIGATION CONTRACTOR O NEW E PVC PRIVATE SEWER IAER -020% MINIMUM SLOPE SEWER SERVICE CIFANOIIrs SHALL HAVE BRASS CAP. WITH GLUED BI- THREADED COWLINGS OEXISTING GRAVITY SANITARY SEWER WITH ]IT EASEMENT EXISTING WATERUNE PROPOSEDWAERUNE PROPOSED FIRE UNE PRlWOSO WATER MEEK PROPOSED BACKFLOW PREVENTER PROPOSED ARE DEPARTMENT CONNECTION (FOG) ---- w - - - -w— TOTAL PROPERTY IBAC "2M 316 SF PROOSEDIMERVIOUS 109,796 F 316 =O SNS 5...% IMPERVIOUS PROPOSm FUTURE IMPERVIOUS 26T1 SF TOTAL ERViOUS e] =10,1SFF TOTALIMPERVIOUS 112,6T3INO,T6=0562 K3 %IMPERVIOUS TOTAL (.0% IMPERVIOU3 WA3 ASSUMED IN DESIGN OF OFFSIE SNRMRATER — GEMENT FOND) NOTE CONTRACTOR TO CONFIRM UTILITY CONNECTION LOCATIONS AT BUILDING PRIORTOINSTALJATION NORMAL DUTY ASPHALT HEAVY DUTY ASPHALT CONCRETE ') IIII I 'eJ IY IIII \ I 'co — w —w —w— — T'^�-� ^�f"� SEWER LEGEND MAY CONTRACTOR - - EXISTING SANITARY SEWER UNE EXISTNG SANITARY SEVER MANHOLE PROPOSEDSANITARYSEWERLINE - - -- - - - -� mO O NEW DLIMPSE EE R WITH ENCLOSURE SEE DETAIL ON SHUT CII SELECED BACKFLOW PREVENTION ASSEMBUES SHALL BE ACCORDANCE WITH APPENDIX -B -, NC RULES (TITLE 154 -1110) b CITY OF CONCORD REQUIREMENTS _ _ l PROPOSED SANITARY SEWER CLEANOUT G I (/y 1 '^ I I i'^ 9 i I UJ j10 is "L T m XI III I III 1 \1\ I I nil 6 I \1 / jI 3� �\ ♦ I I \\ 1 \ I III ��\ \ yy z'---- '--- �'S - - ° -- '---- ° - - - -° - I I - -- ��. �° q I '----- - - - - - -� I --� II IIII I = I - � 2I• Ir�j - 11 11 AI 1 L j IIII I -I • -- - 20' UTILITI�EASEME� T 25'BUILDING SETP TICK— - — ^Ty�� °� III I I I - Q_ 11 a I I j , 0 w.1 No- I ~- —E- li III I -q - "' I •w� —,,: .,� -= w —1'1 _ I III I ; I III I I I - 1 IIII I I II I 19'- III Jn 1. III I I I I I� p4 1 :I I w o I I L I II III �%% XY III I lu FA/ U I III L.1... DO III I 1111 I 'z jI r ✓',�. ,�NOIP iii q A••"�,V 9 e iI' GRAPHIC SCALE c°o ill III Z 2 -__ _ -� - - ' ,- ' .r • ' . $ 111 w MAY CONTRACTOR - - BE RELOCATED BASED ON FINAL OCCUPANCY TO CONFIRM PRIOR TO INSTALLATION I _ -_ III_ _ PROPOSED BUILDING 50,400 SF i FIFE: 674.50 I III I XIyI I I tit �. _ _ l ,III I'VFI I � III � 3 II, III w Y I I I• III I IIJ1I 'IIII I s I I -- a �I I I� I In ? 11!11 1 I'I Iii j ; I i v " I I 1 to 10 ¢ Flo s 5 Z 51 o" �, g• III III III ; 1 J — - _ — — — — — — — — — I 1111 _IFTf_ ,.� eyI IIIII-- IJJ -�k..- I III a I� III I I / .f III I I �• / ITT I I I I i III I 11 ' -II I I I it ) • - _ PLAN 2 FIAMP AND HANDICAPPED SPACES J_ ,�NOIP N..tI C� O-C.II C.M, Call 811 Before You Dig A••"�,V 9 e GRAPHIC SCALE -__ _ -� - - ' ,- ' .r • ' . $ _ r MAY CONTRACTOR - - BE RELOCATED BASED ON FINAL OCCUPANCY TO CONFIRM PRIOR TO INSTALLATION I _ -_ III_ _ PROPOSED BUILDING 50,400 SF i FIFE: 674.50 -_ - ___ __ -- -� : - — - I 25 BUILDING SETBACK _ _ =20' UTILITIES EASEMENT _ WSANITARY SEWER EASEMENT u I u • - U �\ 25 20' - .'Ca HEAVY DUTY CONCRETE NORMAL DUTY HEAVY DUTY PAVEMENT SECTION* PAVEMENT SECTION" (D PAVEMENT SECTION* S PORTLAND TACKGOAT F CEMENT (4 000 PSI REQUIRED) ®36 DAYS) � y 2 .- _._ —u.._ _.. .\ mMVACTED "••, -,_ __�a.� _ -..\ COMPACTEQ �. —_,._. �,�� _v � COMPACTED SUBBASE SUBBASE SUBBASE '- CONFIRM WITH GEOTECHMCAL ENGINEER OR PAVEMENT CONFIRM WITH GECECHNICAL ENGINEER OR PAVEMENT CONFIRM WITH GEOTECHMCAL ENGINEER FOR PAVEMENT SECTIONS AND SUBGRADE NOTIFY ENGINEER IN CASE OF CONFLICT SECTIONS AND SL BGRACE NOTIFY ENGINEER IN CASE OF CONFLICT SECTIONS AND SUBGRAOE NOTIFY ENGINEER IN CASE OF CONI LICT I I fll \ 1 11 I I III I a I I XI •. L. { X11 ; S 111' 9 I�X L.I {�. ai \ \ o, " 20' UTILITIES EASEMENT \�9\ ° 26LANDSCAPED AREA va It \ v °`v \sv� ppv 11� 1 1 kk 15 I \y \ �1 w �:-,\ 15 \ �rXq 111 I 111 ( II + \\ A xx 11-1 BRIM = 67014' IN "a" = 662 61' IN "b" = 66278 OUT = 662 -40' 1 1 I \ I \ I PARKING TABULATION REOUIRED PARKNG CWAREHDU5E7 I SPACE PER 400 S F SALES b OFFICE AREA .R- 2 SPACES ER 3 EMPLOYEES AT PEAK SHFT � 1 PER COG MPANY VEMQ -E ATPEAX SNFT PROPOSED PARKING TOTAL PROPOSED UNC ACCESS SOS) • 58 SPACES REGULAR SPACES "52 SPACES ACCESSIBLE SPACE S° 4(1NG1-UCING 4VAN) FUTURE PARKING TOTAL FUTURE 9NC ACCESS SOSJ =1T SPACES REGIIIAR SPACES" 11 SPACES ACCESSIBLE SPACES" 011NCLUDING 0VAN) TRUE PLAN NORTH %N CARmlAw NORTH ,�NOIP N..tI C� O-C.II C.M, Call 811 Before You Dig A••"�,V 9 e GRAPHIC SCALE ( IN P86X ) 2 LDah - SO pL N z W Z O W� w =OawW'?�mn P ~Oma F000 mj000 }mow fO TD � Z fn 0- z o< o o< z z O a a a �?ZOwzo�O Nawz00»Z OZQOWWO¢ ¢a w ¢pOp¢, 3 Cr �u) o Z,L N WQ yM pWU �z frC7u)wg oi: ::DZ(A z [DWQ o5 ' rn m E II t n° SEAL ,OOD6 Z � z J z JJ mw0 U0 F- o= W Lu J Ir Or U) ~ OWo 06 U 0 F- O U U) J M� W �,= GTW Engineer EJR Drawn By 10/28/15 Date Revisions C3.0 Sheet 5 of 14 II EA I I I STORM DRAINAGE CHART PROJECT IBP LOT 10 SPEC BUILDING DATE 10/28/15 LOCATION 4535 ENTERPRISE DR, CONCORD, NC REVISED STORM FREQUENCY (ON-SITE) 10YR-C=SEE CHART i=724(lDyr) PER NOAA JOB NO 619-001 ALL PIPE SHALL BE CL III RCP UNLESS NOTED OTHERWISE COMPUTED BY EJR CHECKED BY GTVV LINE DRAINAGE AREA (ACRES) TIME(MIN) Q(CFS) PIPE DATA INVERT ELEVATIONS VELOC INLET /RIM ELEVATION REMARKS FROM TO DFFSITE ONrlTd TOTAL _ U_ .,.L I I Cr �l C-L I l0y� 1,��o P P�E �—EIT I F I J I I- UPSTREAM DOWNSTREAM FPS FT 1 DI 1.6 DI 1 5 — 035 035 1 — 5.0 0 228 228 1 N/A 4 57 0013 050 627 66918 66887 372 DI 1.6 = 673 06 RCP DI 1 5 DI 14 — 022 — 5.0 0.90 1 43 WA— 4 57 0,013 0.50 64 15 66877 668.45 3 72 D1 1.5 = 673.06 RCP DI 1.4 CB 1 3 — 0.11 090 072 0 443 NIA _77 43 0013 r0.13 050 43 18 66820 66799 420 DI 1 4 = 673 06 RCP CB13 JB 1 2 — 0.13 RI—P UN so V901 090 085 t371 528 WA -7.43 0 0 50 17 18 667.89 66780 420 CB13=67344 RCP JB 1 2 FES 1 1 — 0.81 USE NATURAL MATERIAL so �o 090 5.28 8 528 PNU- WA 7.43 .01 0013 - 6�50 340 18 66770 66 6.00 4.20 JB 12 = 674.10 RCP STREAM CROSSING SECTION wTros w E STREAM CROSSING PROFILE CB 2 2 FES 2 1 — so 090 N/A 743 0013 0.50 25 18 1 66320 66307 420 1 CB 2.2 = 666 92 RCP IN > Fill 73 7400 67418 L2 U 67368 7 ill '73' .... B70 00 7-7" 41DIW. SETS 67043 -25 BUJ AQR -OKSE- 26�UTIUITES MIN _- 66993 -' -- -- --950," ',"30'SANITAIRY'SE. 2V - - - - - - - - - - - I ----------- 4, - -- — — — — — — — — — — — — — — — 7"- PRI-IIE0 CONCRETE P-UME- SEE DETAIL ON SHEET CT 0 ODovv NSPOUi NSCF GESMRECTLYTOMUCKCOMTSEEMCHMCTURALPUNS FOR DETAILS GRADING LEGEND EXISTING Co—UR -IDO- PROPOSED..NroUR 100 PROPOSED LIMITS OF CONSTRUCTION PROPOSED SPOT ELEVATION (AT CURB TOCiSOC) • PROPOSED BACKFILL B5`(LENGTH OF IMPACT) 00 00 PROPOSED S— ELEVATION (ND CURB) F 400.0 PROPOSEDJUNCTIONBOX • PROPOSED CATO-I BASIN PROPOSED DROP INLET PROPOSED FARED END SECTION ► PROPOSED RIP—APRON 3[Y--S'— 2 I J I I- 1 71 LFOF60'RCPQ1 41% EXISTING SUBGRADE ls- (TYP) OTT MOFCl-IANNEL ELEV 681 41 Ei-EV 66D 41 CLASS B RIPRAP VE T RI—P UN LOC (TYP) ELEV 68041 INVE BANKS ONLY 17 EMBEDMENT V 659 41 USE NATURAL MATERIAL STREAM CROSSING SECTION wTros w E STREAM CROSSING PROFILE PRI-IIE0 CONCRETE P-UME- SEE DETAIL ON SHEET CT 0 ODovv NSPOUi NSCF GESMRECTLYTOMUCKCOMTSEEMCHMCTURALPUNS FOR DETAILS GRADING LEGEND EXISTING Co—UR -IDO- PROPOSED..NroUR 100 PROPOSED LIMITS OF CONSTRUCTION PROPOSED SPOT ELEVATION (AT CURB TOCiSOC) • iog.50 00 00 PROPOSED S— ELEVATION (ND CURB) F 400.0 PROPOSEDJUNCTIONBOX • PROPOSED CATO-I BASIN PROPOSED DROP INLET PROPOSED FARED END SECTION ► PROPOSED RIP—APRON All till I I it 30: 11, W c) III zlil Uj :D t =1 "L 1--_ 120' UTILITIES EASEMENT `25 LF 2' LANDSCAPED AREA 18• RCP 10 50% , "-.I L ES21 IV IN 663 07 18' RCP 6 cc ZU` w 0 0 Ln 1- 0 1,, 000 Q) 10 1- cc EC < z zo< 0 O<ZZC, a Z 00- 0 < 0- i- T= w UU 0 :, O r Ir Ir 0 w L) 0 LU I �� D 0 0 w T m w a D Z xoz<Owwom 0 CC � , cc :3 1 0 C) a- 1-- cc 3: fr_ 0 (1) Z E — LLI W < 0 wz on F z z - o E5!5 T-(Dcf) z Z)zu) Ji cow< A Sea] r%l SEAL :,,99s 0 z z < < -Kj w w 0 0 < c) 0 LLI LLJ Ln C'r < IL Cc.- z 0 ct) cr - U1 0 06 �-- T- Z W 0 L) 0 0 0 < 0 GTw Engineer EJR Drevvn By 10/28/15 Date Revisions TRUE -1 A100ft"i PLAN NORTH = NOWN Of& 1#4 NORTH 0.+1.. o,,C,II C,nwr Call 8 all 811 Before You Dig GRAPHIC SCALE Project Number 619m001 C4.0 I Inch - 30 M Sheet 6 of 14 ! SEDIMENT BASIN INSET SCALE. f' =20• // 66g VIP / p/ 3 . 686 665 66X �3 _ _ _________- I 'z \,4g r- `_ 1 666_666 \ I111 ll /r \ 663-: - I — 1 664 - - II II I ' I a L IIIII I II I rode XI 1 I�I� -1 -4- �Ilq 11 TI I �In; a qr I 111 I _ II ,III I li III I I p III IIIII III � fIII Q i IIII I III w o m U) F I III N U III LL 0— m IIII 0� :D I w o ylll 'Z w 111 e! I I III I III I''i I ,i�illl 2' I II I 'J III I I I jjII I I I �pll ID ��II I 11 j LID '\ a I I � III I I i IIII II IIIII L III S Y ICI I I III I I III I ��III a 111 I I / III / III I � "I/ III •. I; / III y 1 i uI TIII T / III \ c! III/ I 1 I i \--- ----- - - - - -I -I I '1 1 20, , 0'UTILITIES EASEMENT -t c S OF C U O - 4 5 ACRES L I lil I I I/ I I / I SURFACE AREA RED SURFACE AREA PROV SF 1 SF 3 171 3,563 BOTTOM DIMENSIONS FT IRREG TOP OF STORAGE DIMS FT IRREG BOTTOM ELEVATION FT 661 0 TOP ELEVATION FT 6660 TOP OF STORAGE ELEV FT 66,10 SKIMMER SIZE IN 3 SKIMMER ORIFICE DIA IN 275 EMRGY SPILLWAY ELEV FT 665 WEIR WIDTH I FT 5 WEIR LENGTH I FT 10 EROSION CONTROL KEYS OTEMPORARYSTAMUZEDCONSTRUCTIONENTRANCE OP TEMPORARY RIPRAP APRON SEE DETAIL FOR SIZING PB TEMPORARY POROUS BAFFLES IN SKIMMER BASIN OTEMPORARY SILT FENCE \4 QTEMPORARY DOUBLE ROW OF SILT FENCE `\ \\\ / 11, 11 11 OTEMPORARY FAJRCLOTH SNMMER(OR APPROVED EDUAQ II Ill \ OTEMPORARY DIVERSION DITCH I \ \I\ 1 1 III 11 OTEMPORARY SLOPE GRAIN REFER TO PIANS FOR SM- OTEMPORARY SPECIAL SILT FENCE (HIGH FWZARD) 1111 IIIII I OTEMPORARY ROCK OUTLET IN SILT FENCE gY Ili I'u IIIII OTEMPORARYDITCHCMM @ 1 La II Il all` O TEMPORARY EXCAVATED DROP INLET PROTECTION IN I IPx TEMPORARYGMVELINLET PROTECRON l� i -c " O III II u 1 OSLOPE MATTING I � U 111 tl ll 1 a U) J IX 1111 1 I w lµ ohl �•l 1 ", a LA' l0 11 l I EI 111 ca it / —TLS -- iii N -r- o- --------------- R. R -� 10 3! r20� - �0 1L k0 o xn- \ \1. •. \ \�` '. \� \ �c -'., I�1'� 20'LANDIES EASEMENT A " 25' LANDSCAPED AREA \\ N, IN k IN ,'l g I 1 ;wlo 'I 1 I w ; / 1 _ _ - __ - --- ___- - - - --- - -- ------ -- -_-pp. �� ``� ;� " -��'I, \� I ' W < pl.\ ' , �,` '- , ,'v;'t1'', 11 '' i � ''I 25'BIllLDING , I\ — — �20_UTILITIES�$EMEN7_ - _ _ _- __ — — — _ — _ — _ , I �� �. 30'SANITARY SEWER EASEMENT— _____ 25 \ ° II 1\ 11\ I 11 I \\ I 1\ I \\ 1\ � \1 z w O O W a W i W m X000 w j O O °T 0 } f¢ z3 mw, Z �¢ p 0¢ Z Z O 3 }OZOaO¢� OMT W W 0 D¢ In W W N D,w zOOD -°Z Oz¢OWWO¢ ¢p Oa 'wR 3 V ZW � N cc Q 0 W w Wz I_Z0U'g o°'w CC C3 CA J D :DZCO -Z m ED LLB Q v 3 rn 2 . m E n I11� Z o S- ', I 1 L � If/ :I/ Ili ••4•M1'; ;. /TI 5�\ \i-\ � 1 \ \\ \ PLAN VIEW ' I \ I 1 ` O.,&,NRMENr sT=�IC" a. E' NRE NOTES 14T RE- " 0101 CROSS- .TION VIEW i1REEBDAAD FYB". IwENr DE-RING STRUCNRE BKRFS � �� � w EMERGENCY FAQ STDRULE TONE LO1•^ NOT TO SCALE DATA BLOCK e,A„ X° D+ .� �.IRI cRm IRm Gran Dan c'an q..rA� 1 Is AS 9e 5- am a.m �.SBG 15 ] B 10 15 S T 2D• SKIMMER SEDIMENT BASIN 11' -� -_ LIMITS OF CONSTRUCTION 4 5 ACRES ° I \ I 1\ I \ I EROSION CONTROL LEGEND EXISTING CONTOUR -- -- - 100 1 100 PROPOSEDUMTSOFCONSTRICTKIN I PROPOSEDSILTFENCE X X PROFOSEDSPECIAL SILT FENCE >u� PROPOSED DIVERSION DITCH l' PROPOSEDRIPRAPAPRON N- Y PROPOSED INLET PROTECTION 0 PLAN VIEW ' I \ I 1 ` O.,&,NRMENr sT=�IC" a. E' NRE NOTES 14T RE- " 0101 CROSS- .TION VIEW i1REEBDAAD FYB". IwENr DE-RING STRUCNRE BKRFS � �� � w EMERGENCY FAQ STDRULE TONE LO1•^ NOT TO SCALE DATA BLOCK e,A„ X° D+ .� �.IRI cRm IRm Gran Dan c'an q..rA� 1 Is AS 9e 5- am a.m �.SBG 15 ] B 10 15 S T 2D• SKIMMER SEDIMENT BASIN 11' -� -_ LIMITS OF CONSTRUCTION 4 5 ACRES ° I \ I 1\ I \ I EROSION CONTROL LEGEND EXISTING CONTOUR -- -- - 100 PROPOSED CONTOUR 100 PROPOSEDUMTSOFCONSTRICTKIN —Lx PROPOSEDSILTFENCE X X PROFOSEDSPECIAL SILT FENCE >u� PROPOSED DIVERSION DITCH PROPOSED POROUS BAFFLE PROPOSEDRIPRAPAPRON N- Y PROPOSED INLET PROTECTION 0 DRAWING INFORMATION TRUE PLAN NORTH NOIF�TN`CA\IIO1LINA NORTH D"con Center �.a.r..�. ¢ Call 811 Before You Dig E GRAPHIC SCALE ( IN FM) 1 LBCh - 30 ft. V Z z 0 Q J J a a J 0o LU 2 O U Q < (r — °= H W acco Q Q Z O F- CC Z Tw° 0 F- o O L) O T- LL W m in GTW Engineer EJ R Drawn By 10/28/15 Date Revoons C5.0 Sheet 7 of 14 EROSION CONTROL LEGEND EROSION CONTROL KEYS SKIMMER BASIN DESIGN DATA U) z o ¢ I-: EXISTING CONTTOUR - - 100 - - - — PHASE II 2 O ¢ W to W //O TEMPORARY STABILIZED CONSTRUCTION ENTRANCE \ F¢ U m IL F 0 0 0 I PROPO6EDCONIOUR 100 O TEMPORARY RIPRAP APRON SEE DETAIL FOR SITING DENUDED AREA AC 45 \ 1 \ Q N m y O �U - 2 y Q /// PROPOSED OMITS OF CONSTRUCTION —iw ��� DRAINAGE AREA AC 45 1 \ +,I 1 e I 0 N ~ Q Q Q - Z O TEMPORARY POROUS BAFFLES IN Slu TAMER BASIN CIA CFS 76 1 \ N ? W Q ~ O Q p O Q / // / /,/ PROPOSED SILT FENCE —X —X— O TEMPORARY SILT FENCE. Q -- IA CFS 96 1 1 1 1 \\ Y C7 Z p O Q d / ��/ PROPOSED SPECIAL SILT FENCE TEMPORARY OCUBLE ROW OF SILT FENCE STORAGE REQUIRED OF 8,100 1 1\ \\` / 1111Y Q ¢ ¢ N ¢ W O W /// /j/ / / / PROPOSED DIVERSION DITCH �� TEMPORARY FAIRCLOTH 6KIMMER(OR APPROVED EQUAL) STORAGE PROVIDED OF B,3B8 I hhCC 1 \I Zi j111 y a W Z p O j 4 Z // /// / / I n O SURFACEAREAREO SF 3,1P 1 ' G A 111 I I III I = Q? Q Q -W-1 W Q M // / I PROPOSED POROUS BAFFLE TD TEMPORARY DIVERSION DITCH I F L7 /// / . Q SURFACE AREA PROV SF 3,563 1 II /// / 9 1 1 1 1 1 1 D. Z W Ox O a w / I N�QOO.Q1�( O TEMPORARY SLOPE DItA1N REFER TO PLANS FOR SIZING BOTTOM DIMENSIONS FT IRREG lul,. 1 W ar CC PROPOSEDRIPPAPAPRON AA - y 111 1 l/ l/l l I v000III•••/// TEMPORARY SPECIAL SILT FENCE (HIGHNWARDI TOP OF STORAGE DIMS FT IRREG 1 � 111 II 1 / I BOTTOM ELEVATION FT 6610 // TEMPORARY ROCK OUTLET IN SILT FENCE I 1 111 II II I II 1 z TOP ELEVATION FT 6660 / /// / I PROPOSED INLET PROTECTION a TEMPORARY DITCH CHECK 1 I Q lair ® W / Q TOP OF STORAGE ELEV FT 6640 I It OTEMPORARY EXCAVATED DROP INLET PROTECTION SKIMMER SIZE IN 3 S i I� YIN ZII III \ Z a w 1 / / O TEMPo2IRY GRAVEL IN.ETPROTECTIgV I 1 ;C0 O 11 11'1 ® w % 1// / SKIMMER ORIFICE DIA IN 2.75 /f� SJ 11 I1 W !� 11 w m 1!/ / /m I OSLOPE M4TTINA I ; � II 11111 111\ \ QZA../ n N EMRGY SPILLWAY ELEV FT 66 T (%% U IN BII 11\ —O Z5 g U o II !Il 1 1 \ \ WEIR WIDTH FT 5 I 1 „(1) 71 Illll \I C (0 to 1W II /ll / / I \ WEIR LENGTH FT 10 9 �� N I w 10 It IuyL 1 \\ �Z� _Z o m ltl II _ Tr \ \ TOPOFDAMWIDTH FT 5 m I p`q 1 11 1 4 II E,:. -__i -- I z obi pZII I,; q1 COW<U< ymE \ - Il [ 9 / / 1 1 // \ CO STRUC 10 ENTRANCE I i I. 11 III p II I 11 �1 _ I / I �' S O O $ TO BE COMPLETED ONCE STREAM CROSSING I \ `, l 45ACRES �\ N I YI I 11 - I I \ \ \\ \ \ \ HAS BEEN PERMITTED AND COMPLETED 1 � Seal N II C� / 1 I l ii- ' i -L` ' \0`� _ __ J Z_ \- - - - - -_ _ -- p - -1 - l l 1 - - - - - - -- - - - -- • \ 1. I III �`D° \ ` ". RD 'r - - --- - -ih,1 __ __x _ ____A____ aox I - x r =A _ ____y_ Ro - .____ __ -_ __ - \ ss 1 i III 1 1111 �„ . RO( •••. ._- - -i---- - - - - ' P / __ - r- _.l= -� I YI \\ZFESS roHw. ��• ul :e SEAL i II 9 I / m• �. SST _, 8 �', 111 s �I 1 I �],1 R Buse i — — — — -- — — __ -- 9 1 If I I' . II 2 1 1 +5 s7a sTD BA K 1 � III •' j. III •••• "Y'T `t1 �,0 �1`J /i/ L8j2 O °f fMl rl I ,' r '' IN '`1 `•'eW i IN 93 LF OF TEMPORARY CULVERT DISCHARGING INTO SEDIMENT BASINS 05 %(MIN) \ y \. ✓g ��� t 1 Ir"r Q \ \ E" 20' UTILITIES EASEMENT 101 ��\ 1 `, \ 25' LANDSCAPED AREA r 1� III y / w \ \ \1+ \ \ 7 - �� ,�� oVv' r o _III W p 1' I� } \'n LLI I I! .a• -,i I \ ` ,� > J j I m I `V �`1 / u r 111 I A _ O _ Ile; I1 CO ,, l II ' a Pe ` \`i n /� , {� { �. \ 1 Jh, \ ` \ U W wwH 4 \ 1 LU Z �I al 1', ;, I i[ +\ 11�11a1 \ �¢o O Q W 1111 (�1 ?1../ �'� \� V A two U 2 it �I III 'I �I I �I •�,: I 0'71 1 IaI''' I 11 \ g �y V CC Z 1 Ili I`;i j I I z �I _ \ �, 0t , \ ';� I/ 1 §\� f f1i1', 111 \ W O 'pl wo, 1 P u� \ �� 1! 1 ' III 1 I III I \ `w'B ` , _ _ __ __ -- __- __ _ _ U F•� I Full I - - _ -`\ _ __ -__ __ - � i�y'�',1 1 � J i0 (� i I i I r o� m \' ' - - _ " - - - -- _-- _ Y; s i F 1 1 \� 1 sa I m 25' BUILDBJG SETBA+ Do` _ f / ,'r/ _C _ W — 20'UTILI7IESA$ M N7 - - — - III I \ 357S TAW SEW EASEMENT r III " -- � —x— a —s_: _Y_x_. —x �oo.�a_ - f � ' � -•�T . � ,y �, W 1 —x x ------------ -_�-` -x -co _ ``�` %x,• {Il u 1 1 I` / ig TILL a 1, 11 \ l - _ -�� A/ III A111 \\ M �♦ 1 / •16 I /', \@ \ _ \ ' \ 45ACRES M. GT1N It D aWR By 10/28/15 / III ,• 1 1 \ Date 1 \ Revisions DRAWING INFORMATION TRUE ; PLAN NORTH A'OR`7N`CANO1L /NA NORTH ` �� 2,' IN �'S'' Nr[C..�.. On�Cdl C.nle, ••""'e Call 811 Before You Dig F \ \ GRAPHIC SCALE Propat Number 619 -001 1 � caaEEITl C5.1 1 inch-- 30 YL Sheet 8 o(14 LANDSCAPE LEGEND SYM Q QTY P PINTS B BOTANICAL NAME C LANDSCAPING CALCULATIONS LOCATION T TYPE R ROOT /CONTAINER P PLANTING HEIGHT /SIZE A SM1MViD OAK RED MAPLE RIVER BIRCH O C • J Z� -YS ® O REDCEOAR EASTERN REDBUD FLOWEWNG DOGWOOD ® O ❑ JAPANESE HOLLY DWARF YAUPoN HOLLY LANDSGPEDAREA Em.. YARDI-,EOORY010000699995, GFA, MIMMUMWIGTH•13 FEET, I6 FEET PROVIDED KIM UM SHADE TREES REQUIRED =1 PER 50 LF(12 P —TREE) MINI MUM ORNAMENTAL TREES REQUIRED =1 PER So IF (6 P—T, -) MINIMUM SMALL DR MEDIUMEVERGREEN SHRUBS•12 PER 30 LF Q P—MEDIUM SHRUB, 1 Po'NSMALL SHRUB) MINMUARFOOSREDMRDI= 06PERUNE(IUMI 187 LINEAR FOOT OF Bl4lDING FRONTAGE (1X PoIMS REQl4RED) AS SHADE TREES REQUIRED•4 PROVIDED(4 X 12 "46 POINTS) AS MALL TREES REQUIRED •5 PROVIDED(5S6• XPoINTS) Bi SHRUBSREQMRED •60 PR OVIDED(SEEBELOW) MEDIUMSHRUBS•19 PROVIDED (1B %2•bPOINTS) SMALL SHRUBS.AB PROVIDED (49 %1 wPOLES) TOTAL PoIES P0.0VIDED =166 POINTS PA R10N0 LOT YARDS WMRMUMUND6QAPEAREA REQUIRED. 10% OF PAWING AREA PAWINGAAEA= ]8,698SFX10%=399i SFREOUIRED TOTAL LANDSCAPE AREA PROADED•J. —SF [11.1 %1 MINMUM OLL4NTITY REQUIRED PER I0 PAR10NG SPADES 1SRNIAMEEE OR ] ORNAMENTAL TREES PLUS BSMALL SHRUBS SBPARKINGSPACES• 8SHADE TREES OR 12 ORNAMENTAL TREES AND 525MMLL SHRUBS REOMRED 1351WOE TREEB tORNAMENTAL AM)SOSHRUBS PROVIDED STREET YARD (L. JI EEERPRISE DRIVE MINMUM V4DTH• t3 FEET.I2 FEET PROVIDED MIMMUMSH4DE TREES REQUIRED• 1 SHADE TREE PER SD LF(12 Pm TREE) OR 3 ORNAMENTALS PER 501E (B P —TREE) MINIMUM POINTS REQUIRED .OB PER LINEAR FOOT 3S9 LINEAR FOOT OF STREET FRONTAGE SHADE TREES REQUIRED TREES OR ORNAMENTAL TREES REQUIRED • 12 TREES POLES REQURED•290X 08=165 POINTfi )SHADE TREES EXISTING 25HACETREES PROVIDED 20RNAMEEAL TREES PROVIDED TOTAL POINTS PROVIDED a 72 MINTS \ \ i \ 1 \ (1 `y1 I Tyl• 11 , 11 1 I/ly�� , I I I 1 \\ 1i , 11 \ \q 11,\ 1 e I \ lh\ 1 \7 III I \ / q\ 11 X11 1 \ \\ II•j III. Itl VIII II 111 It 111 1111 W I1.1 (J65MALL SHRUBS AND 16 MEDIUM 6HRU05) R/ � w I I � I I II zI II III I I ' ' 1I �Mi 2 I i II O �� NI � III I I _ III '1 -G `1L �li 1111 I I � III I I u' III � IIII I � f l „� � =IIII •� VIII I ; j Iljl Ll_ I 1 I i III. Ww o;. II III L h III L.L J !ILO II �II',I a IIq 3 1 Ill z I ' I • I III LLI i I II i IIII 1 I 1 1 i� IIII i I' i Iplyu i I i � i it �ll 10 IIII I II j Ili I ju I I Ij0 III I$ I61� I_ II ulll 1 I ill III IIp Ii I IIII �I - -tl II I� N III �wwYrr”' L III 9 I , III 1 I 01 1 I I 1p 0 I I yy III / III � III I I In i 1 I/ III I I / 111 / III 1 f1 - - -- -- �_ _ °- - -- - - -- - - -� °- -- °---- °---- °---- °---- °-- - - ° - -- i ®i - - -I - - - - - -- "EDGE-----_-_-- - - - -- ___ r - = == --- -• - - -- - - -- - -- -- -- -- -- L ____ ___ __ _ - _ 1 . f•`� �g —� I Q icl. 17 11 l li'I I 1 E I'M ® \\ I1�Qpp7AA : I U) Ci lul ZIII'11 y I B (n J IN I I II I i \I 9 ® I I IJ_I j 1 Io�L \\ m NI 1 1 11 it 0 . 1 ea \ I I III \ 1 \I 11 II ' Ill It �� \ \ 11 `t b 11 5 J11, I I NI ! B m 1 I) /a 1 I /a _) 0• I I \ ITV Dw 2 \ ' � • - \° � —® f _ �_ _ -_ __ __ _ _ _— d �• RBA \ \ \ \ \ RM " � ' 25' LAN (TIES E D AREA jH® QD H _ \ PROPOSED BUILDING "" �- -- 50,400 SF FFE: 674.50 F ED tt ¢ dH __® R - T— ___— r_-- r —___— /�P� ,Sl� `I \�i 'Ill I I I 1 \WI`\ \� \ So of a ® LULL So _25' UILDING SETBACK 20' UTILT�ES EASEMENT_ = — 30'SANITARY SEWER EASEMENT — — — — — — p210 3lr — — — — \ \\ q+' �q �R - - °^ -- -- 1\ �J -- sr�'T— s-- s--- -.��r- — ter-- a — —zo— a-- 3•�- ss- --- � - - --.. — — A,---- y--- -- -- -------- — - - - -�. — -- - - -- " - - -- — — H II 9 w -`°" 4— °"`-------------------- - - - - --- \ \ �. I \ \I � N \ I I I LANDSCAPE SCHEDULE • - FULL- TO ROUND SYM Q QTY P PINTS B BOTANICAL NAME C COMMON NAME L LOCATION T TYPE R ROOT /CONTAINER P PLANTING HEIGHT /SIZE A AVERAGE MATURE SIZE S SPACING BO 1 12 1 12 ea Q QUERCUS SHUMARDII S SHUMARD OAK P PARKING LOT D DECID CANOPY B B&B 2 2 -12' CAL , MIN 10' TALL 9 90' TALL A AS SHOWN RM 4 4 1 12 ea A ACER RUBRUM R RED MAPLE B BUILDING YARD D DECID CANOPY B B&B 2 2 -112' CAL , MIN 10' TALL 5 50' TALL A AS SHOWN RM 3 3 1 12- A ACER RUBRUM R RED MAPLE S STREET YARD D DECID CANOPY B B&B 2 2- 1 12'CAL, MIN 10'TALL 5 50'TALL A ASSHOWN RM 4 4 1 12 ea A ACER RUBRUM R RED MAPLE P PARKING LOT D DECID CANOPY B B&B 2 2 -112' CAL , MIN 10-TALL 5 50' TALL A AS SHOWN RC 2 26 1 12 ea J JUNIPERUS VIRGINIANA E EASTERN RED CEDAR S SCREENING L L EG TREE B B&B 2 2-120 CAL , MIN 10' TALL 4 40' TALL A AS SHOWN ER 5 5 6 6 ea C CERCIS CANADENSIS E EASTERN REDBUD B BUILDING YARD S SM DECID TREE B B&B 2 2' CAL , MIN B' TALL 2 20' TALL A AS SHOWN ER 2 2 6 6 ea C CERCIS CANADENSIS E EASTERN REDBUD P PARKING LOT S SM DECID TREE B B 6 B 2 2' CAL ,MIN 6' TALL 2 20' TALL A AS SHOWN RB 2 2 1 12 - B BETULA NIGRA R RIVER BIRCH B BUFFER D DECID CANOPY B B&B 2 2 -12' CAL , MIN 10' TALL 5 50' TALL A AS SHOWN DIN 3 3 6 6.. C CORNUS FLORIDA F FLOWERING DOGWOOD B BUFFER S SM DECID TREE B B&B 2 2' CAL, MIN 6' TALL 2 20' TALL A AS SHOWN DIN 1 1 6 6 ea C CORNUS FLORIDA F FLOWERING DOGWOOD S STREET YARD S SM DECID TREE B B&B 2 2' CAL, MIN 6' TALL 2 20' TALL A AS SHOWN JH 1 19 2 2 ea I ILEX CRENATA'CONVEXA' C CONVEX JAPANESE HOLLY B BUILDING YARD M M EG SHRUB M MIN 36' TALL 5 5' TALL X 5' WIDE A AS SHOWN JH 1 114 2 2- I ILEX CRENATA'CONVEXA' C CONVEX JAPANESE HOLLY P PARKING LOT M M EG SHRUB M MIN 36' TALL 5 5' TALL X 6 WIDE H H3i- Av"1 PLAN NORTH NORTH CAeou' S4 NORTH �1 u�r..1... O—CAD c9PI9. r p Call B11 Before You Dig E �i GRAPHIC SCALE ( IN FM) I inch - So ti W ? Q F w Z F ❑ z= w w = Q G w w m H m a v~i�p001-0 Ow ZDD C, 0"WHMmQ Z Z O¢ Q O a Z Z a QQ F Z Z Z p 0Uj Uj z 0 O N a°»p z Q ZQOw w ODC r=-Mz wpOMF- W Q ?� H cc ZU) Z LL] H Zwa ww o 0 w z � F-0 =z OCC7U) V S �' Z)zu) ;� m EDWQA'S Nm` Ess o %y . SEAL 4 3]936 N • %�'F4•�cIMNE�.'� Zo15 Z 0 z z J 1 J Q m j Q a U0 w a¢o Q cf) a: L) �?o 0 ° J m _ inr GTIN Engineer EJR Drawn By 10/28/15 Dale Rwimlons 619 -001 C6.0 Sheet 9 of 14 7-0 Ir2- 2 EXPANSION JOINT (TYP) CURB FLUME DETAIL NOT TO SCALE 1" RADIUS C EDGE 1T E%PSN JNT m Y (1) M CONT S" MIN TYP. TURN -DOWN SIDEWALK DETAIL BMA .-CRIB Or Lmna1. cwc a Gutla. 2'-P• \THnd4on� x_ttllx/x wx_tulhltyy- \ \� I Ba R—d FEATHERING CURB AND GUTTER DETAIL GENF3iA1 NOTE9 BIDO- FE MINT 1' DEEP MTH Ile' RPpI SHALL BE REQUIRED IN THE CONCRETE AT51NTEMALS ONEll EIPANAONJOINTw1LLBEREGUREDAT45 INTERIALB NOT TO —EED 50't MATCHNG IXPANSIOW W NSTRUOTION MINT IN ADJACENT CURB A SEALED ITN' —SION MINT WILL BE REOMRED WHERE THE SIDEWALKMINSANYRGIDSTRL. E. C �DEWALKS M BE W STRUCTED OF WR 4N THICK ],50 PSI CONCRETE CED WITH 6X6 WI AAWt 4~ ALL SIDE —B SHALL HAVE TOOLED ONTROL MINTS NOT —LEONG 5-FT SPACING IN ANY ItlRECTICN GROOVE JOINT IN SIDEWALK JL—T— TRANSVERSE EXPANSION JOINT IN SIDEWALK I CONCRETE SIDEWALKS I I.� O O ACCESSIBLE PARKING AND T SIGNAGE STANDARDS J PENALTY $250 � w°^ •I • VIII II II Il �• PLAN VIEW - PARALLEL RAMP a�wi>a •I _� a1 �_C E. RAN VILWJ)IAGpNL RAMP NOT TO SCALE ACCESSIBLE RAMP STANDARD MONOLITHIC CURB AND SIDEWALK CONCRETESLOPED CAP PROVIDE T DIAM STD STL PIPE BOLLMD(S)(PAINTED)SETIN4 P5 CONCRETE MIN 12" a 17 a W DEEP FILL PIPE SOLD VW CONCRETE FLUSH Wl TOP Irr I STANDARD CURB AND GUTTER I VAN I I AICCE SIBLE NOT TO SCALE SUPPLEMENTAL ACCESSIBLE SIGN (R7 -8e) ACCESSIBLE RAMP SECTIONS MONOLITHIC CURB AND SIDEWALK 4 rs � zs q II�II 4 a II II L a I r-0• TYP. STL. BOLLARD DETAIL TYPICAL TRAFFIC ARROW TRANSVERSE EXPANSION JOINT NOTES 1 CONTRACTION JOINTS SHALL BE SPACED AT 10-FOOT INTERVALS FORVALLEY GLTTTER,A IOFDOT SPACING MAY BE USED WHEN A MACHINE IS USED JOINT SPACING MAY BE ALTERED BY THE CITY ENGINEER TO PREVENT UNCONTROIJED CRACKING 2 CONTFtACT1ON JOINTS MAY BE INSTALLED BY THE USE OF TEMPLATES OR FORMED BY OTHER APPROVED METHDOS WHERE SUCH JOINS ME NOT FORMED BY TEMPIATES• A MINIMUM DEPTH OF I I M SHALL BE OBTAINED J ALLEAPAI15l0N WSSriALLOEBPACEDATBOFOOTlN WALS,ANDADLICEWWAUMGIDOWECTS JOINTS SHALL lMTCH LOCATIONS WITH JOINTS IN ABUTTING SIDEWALK 4 CONCRETE COMPRESSIVE STRENGTH SHALL BE OSDD P SJ IN 25 DAYS 5 CURB SHILL BE DEPRESSED AT INTERSECTIONS TO PROVIDE FOR FUTURE ACCESSIBLE RAMPS B TOP T OF SUBGRACE BENEATH THE CURB 6 GUTTER SHALL BE COMPACTED TO 1 W% STANDARD PROCTOR DENSITY ,,,,f.,, ,.,.• I CURB AND GUTTER i b� IAN A...RawA.rWIN fp rr++o Ei a� ! -'*7 -- Arvaort °NOT TO SCALE SUPPLEMENTAL ACCESSIBLE SIGN (R7 -8D) RDOORRDOORODORNQORROD o 0 0 0 TiNN(ATED DEAIF SPACING TRtM1f TED DOME SECTION TRUNCATED DOMES PLAN Il AND CROSS - SECTION J Vim® moo I�r■�I Imo �I■mo moo DRIVEWAY DETAIL WITH WIDE PLANTING STRIP AND STANDARD CURB occ � w z F o z w w W W m 1= ru ma F000 y o O 0_ y~ Q zoo'< 'o Q aNZ a0Zo 3ycDZDa OQa ¢H- zOwzoFIn In o W w 0 m¢ g J W w D- W 0 O N0z QO W W 0 C ~az WJO mO aw W p 3 F Cc 0 zw IrI m LI.1 Q W y _ Rp OWU w wZ — zO-U'g og� Q (D � wo n �zcn �Z a MLU< 55 n C. m LL nLL ;m {fl •�-fR aI. ••4PO4ESSR09•,- SEAL - i - `yr z J_ a U) J W O Q W c UgL) w WwF- �¢z° Q OF- WZ TWov Z �. o w 0 C'3 J S GTW Engineer EJ R Drawn By 10/28/15 Date Revisions 619 -001 C7.0 Sheet 70 of 14 T MAXIMUM PENALTY $250 GS20 -37 6 RDOORRDOORODORNQORROD o 0 0 0 TiNN(ATED DEAIF SPACING TRtM1f TED DOME SECTION TRUNCATED DOMES PLAN Il AND CROSS - SECTION J Vim® moo I�r■�I Imo �I■mo moo DRIVEWAY DETAIL WITH WIDE PLANTING STRIP AND STANDARD CURB occ � w z F o z w w W W m 1= ru ma F000 y o O 0_ y~ Q zoo'< 'o Q aNZ a0Zo 3ycDZDa OQa ¢H- zOwzoFIn In o W w 0 m¢ g J W w D- W 0 O N0z QO W W 0 C ~az WJO mO aw W p 3 F Cc 0 zw IrI m LI.1 Q W y _ Rp OWU w wZ — zO-U'g og� Q (D � wo n �zcn �Z a MLU< 55 n C. m LL nLL ;m {fl •�-fR aI. ••4PO4ESSR09•,- SEAL - i - `yr z J_ a U) J W O Q W c UgL) w WwF- �¢z° Q OF- WZ TWov Z �. o w 0 C'3 J S GTW Engineer EJ R Drawn By 10/28/15 Date Revisions 619 -001 C7.0 Sheet 70 of 14 I 1 ' / 1 7 • I 1 ' / 1 1 • a Hill >iv�lb it 0 Cn C .•Cg . 5 �$ s J p.m r rn � z o Q a Project Do ul Sheet Lfle / 1 `Lp € d a Hill >iv�lb it 0 Cn C .•Cg . 5 �$ s GO p.m D S � t 0 z G) co iR m LA a) $ E , m � ' ��F y .$ z.9 r t ti d •F F FF r if' rd z a >i Qn t.9�.VB f G 1 S rn � z o Q a Project Do ul Sheet Lfle n C V/ O F y T 0 V r to D m D � Z I UJ y D m z, o00 _p rn o 'ry �m m PA 5 3 3 L V O O O I �i 2° D 3' -0- 0' 5' -0• m e' °P°I 1= 0 mF� o 1 m Fm= IEp 8g 1 0 a 1d 9 C z ? ° / 1 a Hill >iv�lb Cn C GO � t z G) co y m z.9 r t ti d if' rd z f O D 1 n C V/ O F y T 0 V r to D m D � Z I UJ y D m z, o00 _p rn o 'ry �m m PA 5 3 3 L V O O O I �i 2° D 3' -0- 0' 5' -0• m e' °P°I 1= 0 mF� o 1 m Fm= IEp 8g 1 0 a 1d 9 C z ? ° IBP LOT 10 SPEC BUILDING ENTERPRISE DRIVE CONCORD, NORTH'CAROLINA - GENERAL DETAILS R g€ o MM Ma oyi J O ip €d�8 i _; € 9 y ;0 '�9?d oo � s$4y 8 90 z o Eeaae@ m e9s�sP a ei4i (n T - a � � m � THIS DRAWING IS THE ,,,•• BURTON PROPERTY OF BURTON MPFO ••,�', ��' ENGINEERING ENGINEERING ASSOCIATES ASSOCIATES AND IS NOT TO BE REPRODUCED OR COPIED IN CIVIL ENGINEERS WHOLE OR IN PART. IT IS NO ,Y2fr o � LAND PLANNERS TO BE USED ON ANY OTHER •'•••d��p' 5950 Falmew Rd • Sune too•Charlotte, NC 29210 PROJECT AND IS TO BE 11... (704) 553 -8881 • Fax (704) 553.0860 RETURNED UPON REQUEST. " Flrm License 01557 Cn C GO � t z G) co y if' iiR f IBP LOT 10 SPEC BUILDING ENTERPRISE DRIVE CONCORD, NORTH'CAROLINA - GENERAL DETAILS R g€ o MM Ma oyi J O ip €d�8 i _; € 9 y ;0 '�9?d oo � s$4y 8 90 z o Eeaae@ m e9s�sP a ei4i (n T - a � � m � THIS DRAWING IS THE ,,,•• BURTON PROPERTY OF BURTON MPFO ••,�', ��' ENGINEERING ENGINEERING ASSOCIATES ASSOCIATES AND IS NOT TO BE REPRODUCED OR COPIED IN CIVIL ENGINEERS WHOLE OR IN PART. IT IS NO ,Y2fr o � LAND PLANNERS TO BE USED ON ANY OTHER •'•••d��p' 5950 Falmew Rd • Sune too•Charlotte, NC 29210 PROJECT AND IS TO BE 11... (704) 553 -8881 • Fax (704) 553.0860 RETURNED UPON REQUEST. " Flrm License 01557 u oTr In =r cnor- -, G) m 00,V) IZ= SOD - r 9 c:03 =F. m ZD 0;13 (O m� D IQQQQQQQQQQQQ! " IlQIQQQIQlQQQ! ' 19Q8l9QlI!!CI! 101l6f1!lQf31860 19Q9689Q69696! IBl9000BBI!!!! lQ9E9QD8QQI000 0 0 'O'N '110131V8 8AVAYOIN d0 NOISIAIG 0 9131160 3did Lr dVH dI9 HOd 30I6D No 1HO sxvu tlD Jd30 N ' 907 UNIMO Otl1lONV19 N9I10N3 70 31 fie 7:{ eR: I II eY H q G HBSC:C2:o. �m 88� 5x6666 c •aC'- JSE m ENGLISH STANDARD DRAWING FOR STATE OF a GUIDE FOR RIP HAP AT PIPE OUTLETS NORTH CAROLINA DEPT. OF TRANSPORTATION N DIVIRALEIGH, N.C. (31OHM 1VN071d0 HIM) I SI ON 10 NOISIAIO ., x09 NOIIDN6P 3.3931,100 NDIiV1NOa ��1d30 _. F-11i 161: ROOM 11 • '171R�1' ��■il�l R��.'E�.��y Ri ill• -1■ilr k Up �s i°3 i Iq Ka Io�I CONCRETE JUNCTIION BOX IDEPT'•OF T OANA TATIOM W (WITH OPTIONAL MANHOLE) DIVISION OF HIGHWAYS RALEIGH. M.C. 1551 3dld ,09 1111111 ,31 SAYSIOIN d0 NO16[A70 131NI dOHO 3.3H3N00 NOILV180dSN4UI AO '1,130 rx11"DED x11101 A r J T, R1a•aI� i �F�Fqq o -+ a g �'� FEI• a v�i3 a M Li Z On -Q o' s TiF�p3�•r; 3F d 1 o o m :E I3'T a�a?Iy d 114 10 31V18 xE i 3 ° °•'••••••• N S 0 0 'O'N '110131V8 8AVAYOIN d0 NOISIAIG 0 9131160 3did Lr dVH dI9 HOd 30I6D No 1HO sxvu tlD Jd30 N ' 907 UNIMO Otl1lONV19 N9I10N3 70 31 fie 7:{ eR: I II eY H q G HBSC:C2:o. �m 88� 5x6666 c •aC'- JSE m ENGLISH STANDARD DRAWING FOR STATE OF a GUIDE FOR RIP HAP AT PIPE OUTLETS NORTH CAROLINA DEPT. OF TRANSPORTATION N DIVIRALEIGH, N.C. (31OHM 1VN071d0 HIM) I SI ON 10 NOISIAIO ., x09 NOIIDN6P 3.3931,100 NDIiV1NOa ��1d30 _. F-11i 161: ROOM 11 • '171R�1' ��■il�l R��.'E�.��y Ri ill• -1■ilr k Up �s i°3 i Iq Ka Io�I CONCRETE JUNCTIION BOX IDEPT'•OF T OANA TATIOM W (WITH OPTIONAL MANHOLE) DIVISION OF HIGHWAYS RALEIGH. M.C. 1551 3dld ,09 1111111 ,31 SAYSIOIN d0 NO16[A70 131NI dOHO 3.3H3N00 NOILV180dSN4UI AO '1,130 rx11"DED x11101 A r F ' 5 (—•M �III g1ii pI, a E 1R1 5;3 a; i i �Iil 113 i. i oll'��Io13� MH IN elI; ]i ,v .�• d G� lI� ° m E1110 611 STANDARD DRAWING FOR STATE OF o° CONCRETE DROP INLET N0 TH DARDLINA 12' THRU 30" PIPE OnP v'.aTRAR �PORWAT eON „ '0'X 'H073Trtl p _ 9I'Of8 ONV Y1'OYB S'ONO '018 N11N 3811 tl07 NYHd 9AVMHOIN 70 N018U10 v 031YUB ONV 3 131NI dOHO Nourlwesxwl 70 •1,136 +m YM1lOtl17 N1tlON tl0d DNINVtlO OtlY0NV18 H9IlON3 d0 31r18 T" CA rn o g 2.., r y — — �Or TIT Y r 1 ° m m 0 S S m _— �m o r -n „ m • 3t T I ■m r L—m m ENGLISH STANDARD DRAWING FOR - STATE OF c _ DNOP INLET FRAME AND GRATES NOpTX WIOLIRA FOR USE WITH STD. DW0.8 510.14 AND 840.15 DEPT. OF TRAR9PORTATION DIVISION OF HIGHWAY m RALEIGH, M.C. QI X11 Imo: NI. H�111] OtlY0NV18 NO 359 tl07 a00H GNV 'G31VHD '3MMZI I BAYYIOIN i0 NOI91A10 NOIlYlIOdSNrWI 70 '1,130 rxnotlra x1uGI wd ONINV I. OWONVIS HB11ON3 10 31V18 xE � ° °•'••••••• N SHE 3 m ENTERPRISE DRIVE f' ...«FROSS •••'� = - BURTON ENGINEERING �r 1• 09 s I O 3N• r � �, I 5� CONCORD, NORTH CAROLINA x r ASSOCIATES CIVIL ENGINEERS AND IS NOT TO BE REPRODUCED OR COPIED IN N01 Sheet _ Tlie g W ti �1616� END R1101� LAND PLANNERS W p F ' 5 (—•M �III g1ii pI, a E 1R1 5;3 a; i i �Iil 113 i. i oll'��Io13� MH IN elI; ]i ,v .�• d G� lI� ° m E1110 611 STANDARD DRAWING FOR STATE OF o° CONCRETE DROP INLET N0 TH DARDLINA 12' THRU 30" PIPE OnP v'.aTRAR �PORWAT eON „ '0'X 'H073Trtl p _ 9I'Of8 ONV Y1'OYB S'ONO '018 N11N 3811 tl07 NYHd 9AVMHOIN 70 N018U10 v 031YUB ONV 3 131NI dOHO Nourlwesxwl 70 •1,136 +m YM1lOtl17 N1tlON tl0d DNINVtlO OtlY0NV18 H9IlON3 d0 31r18 T" CA rn o g 2.., r y — — �Or TIT Y r 1 ° m m 0 S S m _— �m o r -n „ m • 3t T I ■m r L—m m ENGLISH STANDARD DRAWING FOR - STATE OF c _ DNOP INLET FRAME AND GRATES NOpTX WIOLIRA FOR USE WITH STD. DW0.8 510.14 AND 840.15 DEPT. OF TRAR9PORTATION DIVISION OF HIGHWAY m RALEIGH, M.C. QI 'H0131Vtl S o NI. H�111] OtlY0NV18 NO 359 tl07 a00H GNV 'G31VHD '3MMZI I BAYYIOIN i0 NOI91A10 NOIlYlIOdSNrWI 70 '1,130 rxnotlra x1uGI wd ONINV I. OWONVIS HB11ON3 10 31V18 xE � ° °•'••••••• N 3 m ENTERPRISE DRIVE f' ...«FROSS •••'� = - BURTON ENGINEERING �r 1• 09 s I O 3N• r � �, I 5� CONCORD, NORTH CAROLINA x r ASSOCIATES CIVIL ENGINEERS AND IS NOT TO BE REPRODUCED OR COPIED IN N01 Sheet _ Tlie g W ti ;` p O: ti l O LAND PLANNERS W p r m p ENGLISH STANDARD ORAWINO FOR FRAME, GRATES, AND HOOD STATE OF DEPT•Of TRAANSPPOIRTATION Q FOR USE ON STANDARD CATCH SABIN DIVISION OF HID HIM YS RALEIGH, N C. 'D'N 'HD13wu 3dId „YS 11tlH1 ,aI SAvmi d0 NDIGIAIO sq NI9tlB NOLro 313tl3N00 xollrltl0asxrul do •1,130 807 DNIMVtlO OtlVONY18 H811ON3 YX1 d0i lV erax i p •t r- ` 9 g L � t ]jiill =fig° iF �I�I:9; ppie i 4 s i. e�� CiI3 3 I ° cow ENGLISH STANDARD DRAWING FOR STATE OF g CONCRETE CATCH BASIN xGltx CAROUM q 12" THRU 54" PIPE DEPT OF TRANBPOpTATION N y O1VI8ION OF HIGHMYB MLEfON, N.C. � 11 SIM 11:9119ER15 agars HHO _ 11141111119 .. �; €_— 1a111111 R9 1119111110 111991111om - OC10011119 1191111119 1111111119 1111111119 111711111� WHIR 0 : 11:2111® 91199HIM II _ II iii 2d 5 ME�, E CARD DRAWING FO CONCRETE CAT?H BASIN 12' THAU 54 PIPE ee�eaaEeee� �I� � it �I 918118688@ I � en 'O'N 'HBI3WN G . SAV■OIN 70 NOISIA70 NI6V9 N71V0 OtlY0NY18 NO 3811 tl0,1 NOIIVLUOdSNVU1 70 '1,130 6 q DOOM aNr '831rHD 311r9d V1177011171UH Y WOd ONIAMIO CtlVONV18 H9110113 70 31VIO �7 Wit ■ INY �r ,{ I i � m ENGLISH STANDARD "I'll FOR STATE OF $: FRAIL, ORATES, AND HOOD xORTx tAROL[M FOR USE ON STANDARD CATCH BASIN DEPT. OF TRANBPORTA770N '0 01YISION OF MIG■AY8 1p RALEIGH, N.C. Project I BP LOT 10 SPEC BUILDING ° °•'••••••• THIS DRAWING IS THE 3 m ENTERPRISE DRIVE f' ...«FROSS •••'� = - BURTON ENGINEERING PROPERTY OF BURTON ENGINEERING ASSOCIATES a \ / 09 m N CONCORD, NORTH CAROLINA mi - •A ASSOCIATES CIVIL ENGINEERS AND IS NOT TO BE REPRODUCED OR COPIED IN N01 Sheet _ Tlie g W ;` p O: ti l O LAND PLANNERS WHOLE OR IN PART. IT IS TO BE USED ON ANY OTHER p STO RM W ATE R �'.;F��.....�d�,� ••,•SH••,.� d Charlotte, NC 28210 •• ' 5950 Fairview Rd • Suite 100- PROJECT AND IS TO BE MANAGEMENT DETAILS •, O (704)5538881•F- (704)553 -8880 RETURNED UPON REQUEST. F- Lice— # 1557 GENRE SLOPES STEEP SLOPES 0 b/w. KY. RYL z+13'x, D - 6YM FN1 zury.l D - hNe� IS ■n. ee Mbr T tl Yy > vim � W leb mbr Firo] S IS lal..YEr F.pe�v] S - Ipll IS MlO b/azn .x..0 eauee�a b. M1n� Y my .eM1CCn � �_� W.v. euYe .�m�s tl M1w.w Y rn] .Tce.v o.� MF�e.I SIIL.O AqA,* .q. ma Nrl� fT N Yq r Seep Ay SEEDING SCHEDULE TEMPORARY SEEDING FOR WARM AND COOL SEASON EARLY SUMMER SEASON STEEP SLOPES s¢oNC w ie. /.r,. a ox,e.q m.K ,zo ea/� rrmtw q. (araq) xucr,m[ m ie. /.rte a mo rew eo I � een fm. N.] , - Aupul ,s aeene.r zs - Gemib.r w SFIDIIC IbI.N�. n yr..a, Y ml !uy .1.g� 13.M1wn Oa— b - F.eru.ry 13, DAM oaa so Y /� w .q%a KeY I�p.EUO. Apply +000 lb./.e. wan +000 wA/.cn quY.Ym eYErorMgG ,QEICaEllly SEIDING Appy Im. � IutiNr p.r c0 Wb., or TLU] py Ap em...tl Ir,.z.r pw b0 1­, or t➢OJ AxpIDMENi' iW.e. Imrbn. oM ]eo m./.r.,. To-,o-,o DA/¢r. rtn,..mn..M 7 30 ro./4,. ,tNi(f 10 f.rt.zx YMZ.r. jjjjjj NOTES �•� MAINTENANCE- 1r���I�__ •• rrl� LCCI1911 ':T 'L'-31 r'_'SIi�T F "••nw_....0 I EXCAVATED DROP INLET PROTECTION E C STD 6 50 GENERAL NOTES GENERAL NOTES-SEDIMENT BASINS I l TEMPORARY SILT DITCH J Age jr —Am— I STABILIZED CONSTRUCTION ENTRANCE CI l(0.r'� -. ] i erg ■.•. _ - _ • SKIMMER I TEMPORARY SILT FENCE J �a�'gs�■�aya•`a®saxap��s�.z. ewe: _ MA-g- -n!.. HIGH HAZARD 11-1 IE GENERAL NOTES MAINTENANCE NOTES Nloinm.tYAVSpblMEW THE WIAVE9rE.N..YCl1FSn uv.Nge NEECEO6o xwEOMYEMYEL —ft %R EWIi M1w,e eNNLBE��v�nW.Olx EC,gz TAE 6.DIM eE gExPIm WHEN OEMbTT6 gFIO1 NmCSMTED N,Dwi � fPlgfOgx io ilE EV6TMG��p��FD 1 OxEAGgE xVIMUM VWx.f£uEAKq ou,u.T Fn.oE PgEwuooWO5FF0ER SILT FENCE ROCK OUTLET TE..eq.grN�,T„eq J ,r�.F,ATTFA S.TfE�e J ,oaN,,,,Eq rMEA�q,R.q.x>u� rwW �q�.En.,EgT e.■q.rx. �,E�q e... oq.,nE a.,. NOT TO SCALE SLOPE STABILITY 7 /`'�erelr:s.ra ,no sac o.ETAP F..,K..eo.Eeaq�EWaTER vEriµc qo gvwTEnvu,o,cEnxovE NOT TO SCALE EMBANKMENT MATTING DETAIL TEMPORARY ROCK CHECK DAM I 7T IFF ,K rtq..[,u vr�Emz, n asnganz„t•rummmmu ♦♦ __ r _ _ ___________ n.saion mm.wawcmaw NOT TO SCN_E HARDWARE CLOTH AND GRAVEL INLET PROTECTION EROSION CONTROL DEWATERING I wz� ° �xww =OawwNr -mom 000 f-¢Um�r N 0,0 yOFp ~Z [A¢ z p a � 0 a z Z 0 a a ¢F?z°wzoap owwNnmcw»Uw O p W Npz¢O JWO¢ ~ a z W p mO a w 'W ¢3F- V /Z W I.. N L I-- Z zWQww —° LOWU m Zz 0 LL/V V/^U y o LL J1 Zv/J JO S CDWQo ki, z SEAL sass Z J � a O z � J Uo� Z � = J Paz Z ~ rw0 cn Z O I— o O L) w m yF GTW Engineer EJR Drawn By 10/28/15 Date Revi sions 619 -001 C7.4 Sheet 14 of 14 ■n. ee Mbr T tl Yy > vim � W Wm. nr�..es.. ww ,000 isJ... ,o-,o-io W Warr.. .�.mvw .m ,00b s✓ee. ,o-,o-,o STEEP SLOPES s¢oNC w ie. /.r,. a ox,e.q m.K ,zo ea/� rrmtw q. (araq) xucr,m[ m ie. /.rte a mo rew eo I � een fm. N.] , - Aupul ,s aeene.r zs - Gemib.r w SFIDIIC IbI.N�. n yr..a, Y ml !uy .1.g� 13.M1wn Oa— b - F.eru.ry 13, DAM oaa so Y /� w .q%a KeY I�p.EUO. Apply +000 lb./.e. wan +000 wA/.cn quY.Ym eYErorMgG ,QEICaEllly SEIDING Appy Im. � IutiNr p.r c0 Wb., or TLU] py Ap em...tl Ir,.z.r pw b0 1­, or t➢OJ AxpIDMENi' iW.e. Imrbn. oM ]eo m./.r.,. To-,o-,o DA/¢r. rtn,..mn..M 7 30 ro./4,. ,tNi(f 10 f.rt.zx YMZ.r. jjjjjj NOTES �•� MAINTENANCE- 1r���I�__ •• rrl� LCCI1911 ':T 'L'-31 r'_'SIi�T F "••nw_....0 I EXCAVATED DROP INLET PROTECTION E C STD 6 50 GENERAL NOTES GENERAL NOTES-SEDIMENT BASINS I l TEMPORARY SILT DITCH J Age jr —Am— I STABILIZED CONSTRUCTION ENTRANCE CI l(0.r'� -. ] i erg ■.•. _ - _ • SKIMMER I TEMPORARY SILT FENCE J �a�'gs�■�aya•`a®saxap��s�.z. ewe: _ MA-g- -n!.. HIGH HAZARD 11-1 IE GENERAL NOTES MAINTENANCE NOTES Nloinm.tYAVSpblMEW THE WIAVE9rE.N..YCl1FSn uv.Nge NEECEO6o xwEOMYEMYEL —ft %R EWIi M1w,e eNNLBE��v�nW.Olx EC,gz TAE 6.DIM eE gExPIm WHEN OEMbTT6 gFIO1 NmCSMTED N,Dwi � fPlgfOgx io ilE EV6TMG��p��FD 1 OxEAGgE xVIMUM VWx.f£uEAKq ou,u.T Fn.oE PgEwuooWO5FF0ER SILT FENCE ROCK OUTLET TE..eq.grN�,T„eq J ,r�.F,ATTFA S.TfE�e J ,oaN,,,,Eq rMEA�q,R.q.x>u� rwW �q�.En.,EgT e.■q.rx. �,E�q e... oq.,nE a.,. NOT TO SCALE SLOPE STABILITY 7 /`'�erelr:s.ra ,no sac o.ETAP F..,K..eo.Eeaq�EWaTER vEriµc qo gvwTEnvu,o,cEnxovE NOT TO SCALE EMBANKMENT MATTING DETAIL TEMPORARY ROCK CHECK DAM I 7T IFF ,K rtq..[,u vr�Emz, n asnganz„t•rummmmu ♦♦ __ r _ _ ___________ n.saion mm.wawcmaw NOT TO SCN_E HARDWARE CLOTH AND GRAVEL INLET PROTECTION EROSION CONTROL DEWATERING I wz� ° �xww =OawwNr -mom 000 f-¢Um�r N 0,0 yOFp ~Z [A¢ z p a � 0 a z Z 0 a a ¢F?z°wzoap owwNnmcw»Uw O p W Npz¢O JWO¢ ~ a z W p mO a w 'W ¢3F- V /Z W I.. N L I-- Z zWQww —° LOWU m Zz 0 LL/V V/^U y o LL J1 Zv/J JO S CDWQo ki, z SEAL sass Z J � a O z � J Uo� Z � = J Paz Z ~ rw0 cn Z O I— o O L) w m yF GTW Engineer EJR Drawn By 10/28/15 Date Revi sions 619 -001 C7.4 Sheet 14 of 14 EXCAVATED DROP INLET PROTECTION E C STD 6 50 GENERAL NOTES GENERAL NOTES-SEDIMENT BASINS I l TEMPORARY SILT DITCH J Age jr —Am— I STABILIZED CONSTRUCTION ENTRANCE CI l(0.r'� -. ] i erg ■.•. _ - _ • SKIMMER I TEMPORARY SILT FENCE J �a�'gs�■�aya•`a®saxap��s�.z. ewe: _ MA-g- -n!.. HIGH HAZARD 11-1 IE GENERAL NOTES MAINTENANCE NOTES Nloinm.tYAVSpblMEW THE WIAVE9rE.N..YCl1FSn uv.Nge NEECEO6o xwEOMYEMYEL —ft %R EWIi M1w,e eNNLBE��v�nW.Olx EC,gz TAE 6.DIM eE gExPIm WHEN OEMbTT6 gFIO1 NmCSMTED N,Dwi � fPlgfOgx io ilE EV6TMG��p��FD 1 OxEAGgE xVIMUM VWx.f£uEAKq ou,u.T Fn.oE PgEwuooWO5FF0ER SILT FENCE ROCK OUTLET TE..eq.grN�,T„eq J ,r�.F,ATTFA S.TfE�e J ,oaN,,,,Eq rMEA�q,R.q.x>u� rwW �q�.En.,EgT e.■q.rx. �,E�q e... oq.,nE a.,. NOT TO SCALE SLOPE STABILITY 7 /`'�erelr:s.ra ,no sac o.ETAP F..,K..eo.Eeaq�EWaTER vEriµc qo gvwTEnvu,o,cEnxovE NOT TO SCALE EMBANKMENT MATTING DETAIL TEMPORARY ROCK CHECK DAM I 7T IFF ,K rtq..[,u vr�Emz, n asnganz„t•rummmmu ♦♦ __ r _ _ ___________ n.saion mm.wawcmaw NOT TO SCN_E HARDWARE CLOTH AND GRAVEL INLET PROTECTION EROSION CONTROL DEWATERING I wz� ° �xww =OawwNr -mom 000 f-¢Um�r N 0,0 yOFp ~Z [A¢ z p a � 0 a z Z 0 a a ¢F?z°wzoap owwNnmcw»Uw O p W Npz¢O JWO¢ ~ a z W p mO a w 'W ¢3F- V /Z W I.. N L I-- Z zWQww —° LOWU m Zz 0 LL/V V/^U y o LL J1 Zv/J JO S CDWQo ki, z SEAL sass Z J � a O z � J Uo� Z � = J Paz Z ~ rw0 cn Z O I— o O L) w m yF GTW Engineer EJR Drawn By 10/28/15 Date Revi sions 619 -001 C7.4 Sheet 14 of 14 GENERAL NOTES GENERAL NOTES-SEDIMENT BASINS I l TEMPORARY SILT DITCH J Age jr —Am— I STABILIZED CONSTRUCTION ENTRANCE CI l(0.r'� -. ] i erg ■.•. _ - _ • SKIMMER I TEMPORARY SILT FENCE J �a�'gs�■�aya•`a®saxap��s�.z. ewe: _ MA-g- -n!.. HIGH HAZARD 11-1 IE GENERAL NOTES MAINTENANCE NOTES Nloinm.tYAVSpblMEW THE WIAVE9rE.N..YCl1FSn uv.Nge NEECEO6o xwEOMYEMYEL —ft %R EWIi M1w,e eNNLBE��v�nW.Olx EC,gz TAE 6.DIM eE gExPIm WHEN OEMbTT6 gFIO1 NmCSMTED N,Dwi � fPlgfOgx io ilE EV6TMG��p��FD 1 OxEAGgE xVIMUM VWx.f£uEAKq ou,u.T Fn.oE PgEwuooWO5FF0ER SILT FENCE ROCK OUTLET TE..eq.grN�,T„eq J ,r�.F,ATTFA S.TfE�e J ,oaN,,,,Eq rMEA�q,R.q.x>u� rwW �q�.En.,EgT e.■q.rx. �,E�q e... oq.,nE a.,. NOT TO SCALE SLOPE STABILITY 7 /`'�erelr:s.ra ,no sac o.ETAP F..,K..eo.Eeaq�EWaTER vEriµc qo gvwTEnvu,o,cEnxovE NOT TO SCALE EMBANKMENT MATTING DETAIL TEMPORARY ROCK CHECK DAM I 7T IFF ,K rtq..[,u vr�Emz, n asnganz„t•rummmmu ♦♦ __ r _ _ ___________ n.saion mm.wawcmaw NOT TO SCN_E HARDWARE CLOTH AND GRAVEL INLET PROTECTION EROSION CONTROL DEWATERING I wz� ° �xww =OawwNr -mom 000 f-¢Um�r N 0,0 yOFp ~Z [A¢ z p a � 0 a z Z 0 a a ¢F?z°wzoap owwNnmcw»Uw O p W Npz¢O JWO¢ ~ a z W p mO a w 'W ¢3F- V /Z W I.. N L I-- Z zWQww —° LOWU m Zz 0 LL/V V/^U y o LL J1 Zv/J JO S CDWQo ki, z SEAL sass Z J � a O z � J Uo� Z � = J Paz Z ~ rw0 cn Z O I— o O L) w m yF GTW Engineer EJR Drawn By 10/28/15 Date Revi sions 619 -001 C7.4 Sheet 14 of 14