HomeMy WebLinkAbout090159_Routine Inspection_20240304Type of Visit: }'Compliance Inspection 0 Operation Review Q Structure Evaluation O Technical Assistance
Reason for Visit: fO'Routine O Complaint 0 Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: Arrival Time: Departure Time: J i1/ County: &4:f�
Farm Name: .A15?�il
/ ` Owner Email:
Owner Name: c�, > e Phone:
Mailing Address:
Physical Address:
Facility Contact: �itri �A p Title:
i
Onsite Representative:
Certified Operator:
Back-up Operator:
Location of Farm:
Latitude:
Phone:
Region: t &_
Integrator: -tide
Certification Number: /()O 94192
Certification Number:
Longitude:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation? ❑ Yes 4f3'�No ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
❑ Yes ❑ No ❑ NA
❑ Yes ❑ No ❑ NA
❑ NE
❑ NE
❑ Yes [—]No ❑ NA ❑ NE
❑ Yes 23No ❑ NA ❑ NE
❑ Yes —EF-No ❑ NA ❑ NE
Page I of 3 511212020 Continued
Facility Number: %s Date of Inspection: J
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yeses❑' No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):�j
5. Are there any immediate threats totheintegrity of any of the structures observed? ❑ Yes e'iVo
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes ,.®`No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat,
notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes E:JINo
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes —E�rNo
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes ,�No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes ,�o
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 12-No
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s): C4� �G & (�itCco2_ GJ 114W QS
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes .E] rvo ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes .�No ❑ NA ❑ NE
16, Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ,-E]INo ❑ NA ❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes EfNo
18. Is there a lack of properly operating waste application equipment? ❑ Yes E5-No
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes F:rNo
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes o
the appropriate box.
❑ WUP ❑Checklists ❑ Design [:]Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. [—]Yes E11150
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes . 5-No
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes Q-No
❑NA ❑NE
❑ NA ❑ NE
❑ NA ❑ NE
❑NA ❑NE
❑NA ❑NE
❑ Weather Code
❑ Sludge Survey
❑NA ❑NE
❑ NA ❑ NE
Page 2 of 3
511212020 Continued
Facility Number: - Date of Inspection:—�
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes r❑'No
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check Yes ❑ No
the appropriate box(es) below.
Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
❑ NA ❑ NE
❑NA ❑NE
❑ Yes „❑'1Vo ❑ NA ❑ NE
❑ Yes r]o ❑ NA ❑ NE
❑ Yes []'No ❑ NA ❑ NE
❑ Yes [3Co ❑ NA ❑ NE
❑ Yes 2�No ❑ NA ❑ NE
❑ Yes 2-1gb ❑ NA ❑ NE
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes �No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes r[D , ❑ NA ❑ NE
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
Phone:
Date: 3111X/19y
511212020
FACILITY#: ` FARM NAME: LAGOON LEVEL
Pd MIT(ms)
- DUE EVERY 5 YEARS
- - EXPERIATION DATE
- CURRENT NUMBER OF ANIMAL
- OIC CARD YES OR NO
NUMBER OF ANIMALS
WASTE UTILIZATION PLAN (WUP) (#20)
SOIL TYPES
CROP TYPES
ODOR CONTROL CHECK LIST YES OR NO
Irrigation Plan Maps YES OR NO
WASTE REPORT (#2i)
-GOOD FOR 60 DAYS BEFORE OR AFTER
DATE NITROGEN LEVEL G l0 /
DATE 6 P-9 ,% NITROGEN LEVEL ! 5j
DATE �[ "` 3 NITROGEN LEVEL C(
SOIL REPORT (42i)
EVERY 3 YEARS: DATE
P-1 (NO MORE THEN 400)
PH (Noteit4orIeoo)
Cu/ZN (NO MORE THEN 8000) CU ZN_
(IF PEANUTS NO MORE THEN 300)
Not over PAN CROP TYPES
FLOW RA
Not over PAN CROP TYPES
FLOW
Not over PAN CROP TYPES
FLOW RA
IRR2 (# i)
NITROGEN (N)
NITROGEN (N)
NITROGEN (N)
Not over PAN CROP TYPES
FLOW RATES NITROGEN (N)
CALBRIATION (uza)
EACH REEL SHOULD BE CALI RATED EVERY OTHER YEAR
DATE OF CALIBRATION
FLOW RATES
-INITIAL AFTER 1" RAIN EVENT RAIN FALL Ix21l
-LOOK FOR ANY LEVEL THAT IS LE S THEN THE DESIGNED FREEBORED PDA NEEDED.
-DUE EVERY YEAR
O:
P: _
O:
P: _
0:
P: _
0:
P:
SLUDGE (zzt a25)
% RATIO OF SLUDGE
% RATIO OF SLUDGE
% RATIO OF SLUDGE
% RATIO OF SLUDGE
OTHER FORMS (#22 AND#21)
RAIN BREAKER FORM CROP YEILBIS MORTALITY_
*If fields are grazed there will be no crop yields
VISUAL CHECK
FOUNDATION OR PIT LEAKS PIPE LEAKS_ LAGOON SEEPAGE LAGOON BARE
AREAS TREES OR GRASS NEED TO BE REMOVED EROSION DITCHES
WINTER CROP(OVERSEEDED) HARVESTED FIELDS_ GOOD HEALTHY CORPS_ CORRECT
CROPS NO PONDING REELS_ FEED. BINS_ LAGOON GARBAGE
Bermuda grass: Opens March 1 �t- Ends September 30u
Small Grain Over seed: Opens October I -t- Ends March 31
Corn: Opens February 15m - Ends June 30m
Cotton: Opens March 15th- Ends August 1st -
Rye: Opens Septemberist-Ends March 31st
Oats: Opens September 1-t- Ends April 15th
Wheat: Opens September i st - Ends April 30th
Soybeans: Opens April 1-t- Ends September 15w - -
Fescue: Opens August 1st -Ends July 31st
Sorghum Hay: Opens March 15* -Ends August 31 st
1
I I