Loading...
HomeMy WebLinkAbout20231622 Ver 1_Re_ _External_ Re_ Tar River Estates Phase IV - DWR#20231622_20240301Baker, Caroline D From: John R. Davis, Jr. <soilhorizons@gmail.com> Sent: Friday, March 1, 2024 10:31 AM To: Myers, Joseph M Subject: Re: [External] Re: Tar River Estates Phase IV - DWR#20231622 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Yes, that's fine. We can consider that permanent impact. John R. Davis, Jr. LSS Soil Horizons 919-818-5087 www.soi I horizons. net PO Box 1063 Youngsville, NC 27596 Fax 919-554-2363 http://sites.google.com/site/soilhorizonsinc/ Like us on Facebook! Soil Horizons On Fri, Mar 1, 2024 at 10:25 AM Myers, Joseph M <loseph.myers@deg.nc.gov> wrote: Hey John, Thanks for sending that over so quickly. In the PCN, the riprap or outlet protection is listed as a temporary impact. Do you plan on removing the riprap after construction or is it staying there permanently? If it is staying in the streambed/bank post construction, it will be considered a permanent impact. While we don't charge mitigation for riprap, as there is no loss of stream function, I will need to reflect it as a permanent impact. Thank you, Joe Myers Environmental Specialist II North Carolina Department of Environmental Quality Office: (919) 791-4256 1 Cell: (919) 906-8056 Joseph.Myers@deg.nc.gov 1 E:malm E: NORTH CARCLIINA Department of Environmental Quality Email correspondence to and from this adc Carolina Public Records Law and maybe c From: John R. Davis, Jr. <soilhorizons@gmail.com> Sent: Friday, March 1, 2024 10:07 AM To: Myers, Joseph M <loseph.myers@deg.nc.gov> Subject: Re: [External] Re: Tar River Estates Phase IV - DWR#20231622 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Yes, they have. See info below from USACE. Thanks John Harmon, Richard G CIV SAW <Richard.G.Harmon@usace.army.mil> Q towesterfrontend(@eamisl.com i Dear Mr. Wester, This correspondence is in response to a Pre -Construction Notification (PCN) received on 24 November 2023, and considered complete on 27 November 2023. In submitting the PCN, you requested verification that the proposed project is authorized by a Department of the Army (DA) Nationwide Permit (NWP). The work affecting waters of the United States is part of an overall project known as the Tar River Estates Phase IV. The activities in waters of the United States include a mobile home community with lots that range from 2 to 3 acres will be created for low-income housing. The project involves the construction of two road crossings to access high ground areas of the project. The project is located on Ferrells Bridge Road, Louisburg in Franklin County, North Carolina. This letter is a provisional notification that your proposed project has been reviewed under NWP-29. In accordance with 40 CFR Part 121 (401 Rule), the Corps cannot take final action on the NWP verification request until the procedures outlined in the 401 Rule for an individual Water Quality Certificate (WQC) have been completed. Specifically, a Department of the Army (DA) permit or verification cannot be issued until a Section 401 WQC has been either issued, waived, or denied, and the neighboring jurisdiction review process described in 40 CFR 121 has been successfully completed. Conditions of the Individual Section 401 WQC will generally become conditions of any final NWP verification letter. Should state action on the required WQC approve a project different from that shown on the current application, a modification to the PCN will be required. You should notify our office of any such changes as substantial changes may require further evaluation. As stated above, this is a provisional notification. This letter does NOT provide Department of the Army (DA) authorization. You are cautioned that commencement of the proposed activity(ies) requested prior to receiving a written DA authorization would constitute a violation of Federal law and subject you to further enforcement action. Receipt of a certification from the state (e.g., NC Division of Water Resources and/or NC Division of Marine Fisheries) does not preclude the requirement for obtaining DA authorization (e.g., an NWP verification letter) prior to commencing the work. In all future correspondence, please refer to file number SAW-2023-02298. This correspondence has also been copied to State and/or Federal agencies for their information. If you have any questions, please contact Dicky Harmon at 919-724-8773, or by email at Richard. G.Harmon(a)-USACE.Army.mil. Sincerely, Dicky Harmon Regulatory Specialist, Raleigh Field Office U.S. Army Corps of Engineers — Wilmington District CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: 919.724.8773 Email: Richard.g.harmon(d)_usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. John R. Davis, Jr. LSS Soil Horizons a • : 1: www.soi I horizons. net PO Box 1063 Youngsville, NC 27596 Fax 919-554-2363 http://sites.google.com/site/soilhorizonsinc/ Like us on Facebook! Soil Horizons On Fri, Mar 1, 2024 at 9:59 AM Myers, Joseph M <joseph.myers@deg.nc.gov> wrote: Hey John, I'm beginning my review and wanted to reach out and see if there's been any correspondence from the army corps of engineers relating to this project? I've checked my email, and they typically get to reviewing these projects before I do, so I just wanted to double check that I didn't miss anything. Do you know if they have issued a provisional and would you be able to provide me with their SAW Action ID number for this project by any chance? Thanks for your time, Joe Myers Environmental Specialist II North Carolina Department of Environmental Quality Office: (919) 791-4256 1 Cell: (919) 906-8056 Joseph.Myers@deg.nc.gov NORTH CAROLINA Department of Environmental [qua Email correspondence to and from this ads Carolina Public Records Law and maybe From: John R. Davis, Jr. <soilhorizons@gmail.com> Sent: Thursday, February 8, 2024 2:29 PM To: Myers, Joseph M <joseph.myers@deg.nc.gov> Cc: murphyeng@nc.rr.com Subject: [External] Re: Tar River Estates Phase IV - DWR#20231622 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Ok thanks for the reply. John Sent from my iPhone On Feb 8, 2024, at 1:41 PM, Myers, Joseph M <joseph.myers@deg.nc.gov> wrote: Good afternoon, My name is Joe Myers, and I am the designated reviewer for the Tar River Estates Phase IV project. Due to the volume of projects we receive, we typically review them in the order that they are received. I just wanted to inform you that I have until March 6, 2024, to review for a complete application. We have an initial 60-day time limit to check for a complete application and if it is deemed complete at that time, I will issue the certification for this project. Again, due to the volume of applications and other job duties, our team is beginning our review process around day 55-60 of our allotted time frame. I will reach out once I begin my review process. Please let me know if you have any questions. Joe Myers Environmental Specialist II North Carolina Department of Environmental Quality Office: (919) 791-4256 1 Cell: (919) 906-8056 Joseph. Myers@deq. nc.gov NORTH CAROLINA Department of Environmental Qwa ity Fm 41:� Email correspondence to and from this Carolina Public Records Law and may Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.