HomeMy WebLinkAbout820266_30 day POA_20240102PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: _82_ - _266 County: _Sampson
Facility Name:_ Carl Riley Finishing
Certified Operator Name: _Carl Riley Operator #_18431
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (ID) L-1_
Spillway (Yes or No): _NO_
Level (inches): _18_
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
_X_ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
I hereby certify that 1 have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
_Carl Riley
Facility Owner/Manager (print)
Facility Owner/Manager (signature)
Phone:
Date:
PoA Cover Page 2121/00
1.
structure ID: L—(
line m =
3.3y lb PAN
2.
structure ID:
line m =
lb PAN
3.
structure ID:
line m =
lb PAN
4.
structure ID:
line m =
lb PAN
5.
structure ID:
line m =
lb PAN
6.
structure ID:
line m =
lb PAN
n.
lines 1 +2+3+4+5+I;
lb PAN
III. TOTAL
PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
PERIOD-
n0 N0T I IST mr:i nR Tr) WI-llru DAKI
rA ni Kln-r MCADOI ICQ DIIDILvI
O/ 1 I,, --
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance
(lb/acre)
t. TOTAL PAN
BALANCE
FOR FIELD
(lbs.)
column r x s
u.
application
window'
IZ(;r
c:� — loft.
i4
3.IJ
SG
i.
d) M
3.3q
'
ILL!,
3 , ,-
- s
I
fit_
�La« UU1I �1IL ..1 VN e1 iUn iy aNNucauon uate or next crop application oeginning date for available receiving crops
during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) _ I lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) _ 3 lb. PAN
PoA (30 Day) 2/21/00 2
x. Crop's remaining PAN balance (line v from section III) _ _ I -c- lb. PAN
y. Overall PAN balance (w - x) _ ty � u lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE: lAR17%
as A 3 1� ra��
pV 1�"`tiAS c 1
�1F—v ki�-S kJ
s g I «1 C- ,,' �, - --
VL K«Fc
+� z &,L }®
FL-
PoA (30 Day) 2/21/00 3