Loading...
HomeMy WebLinkAbout20071504 Ver 1_Triage Check List_20071114Triage Check List Date: 11/14/2007 To: Kevin Barnett, Asheville Regional Office Project Name: Wilderness Trail DWQ #: 07-1504 County: Avery 60-day Processing Time: 11/14/2007 to 1/13/08 From: Ian McMillan Telephone: (919) 715-4631 The file attached is being forwarded to you for your evaluation. Please call if you need assistance. ^ Stream length impacted ^ Stream determination ^ Wetland determination and distance to blue-line surface waters on USFW topo maps ^ Minimization/avoidance issues ^ Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ^ Pond fill ^ Mitigation Ratios ^ Ditching ^ Are the stream and or wetland mitigation sites available and viable? ^ Check drawings for accuracy ^ Is the application consistent with pre-application meetings? ^ Cumulative impact concern ^ See Attached Questions Comments: