Loading...
HomeMy WebLinkAbout20150949 Ver 1_NW12 Emails_20151106 From: Barnes, Kyle W SAW <Kyle.W.Barnes@usace.army.mil> Sent: Friday, November 06, 2015 11:37 AM To: Brian Oschwald Cc: Scarbraugh, Anthony Subject: RE: Washington County NWP 12 (UNCLASSIFIED) Attachments: SAW 2015-02032 Wetland.pdf Classification: UNCLASSIFIED Caveats: NONE Brian, All I needed was the revised PCN.The verification has to be issued to an individual and that info was not on the original application.The information that I sent you regarding the wetland location is for the project(attached again). It appears that the shoulder of NC32 is a little narrow and steep for directional drilling. If by chance the project changes you have the wetland info so impacts can be avoided when staging equipment in that area. I should have the verification issued today. Kyle -----Original Message----- From: Brian Oschwald [mailto:boschwald@thewootencompany.com] Sent:Tuesday, November 03, 2015 3:25 PM To: Barnes, Kyle W SAW Cc: Scarbraugh,Anthony Subject: [EXTERNAL] RE: Washington County NWP 12 (UNCLASSIFIED) Kyle, Here is the updated Page 1 of the PCN. I am working on the wetland information with our surveyors. What exactly are you looking for in regards to information related to jurisdictional waters or wetlands? Thanks, Brian Oschwald, PE Project Engineer The Wooten Company 120 North Boylan Avenue Raleigh, NC 27603 919.828.0531 Fax 919.834.3589 Blockedwww.thewootencompany.com -----Original Message----- From: Barnes, Kyle W SAW [mailto:Kyle.W.Barnes@usace.army.mil] Sent:Tuesday, November 03, 2015 1:13 PM To: Brian Oschwald i Cc: Scarbraugh,Anthony Subject: Washington County NWP 12 (UNCLASSIFIED) Classification: UNCLASSIFIED Caveats: NONE Brian, I went by the site today and reviewed the impact areas.The crossings at S1 and S2 are not jurisdictional.The crossings at S3 &S4 are jurisdictional.At S4 there are wetlands within the new ROW. Keep in mind that if the project moves more than 5 feet off of EOP as indicated on the plans wetland impacts will need to be avoided or quantified. I attached an aerial of the wetlands adjacent to the project area. Be sure the town and the contractor understands that they should stage equipment outside of waters and wetlands during the directional drilling process. I will remove the proposed impacts from the PCN for S1 and S2.The verification for the NWP 12 will be sent out as soon as you send me the information requested in yesterdays email. If you have any questions feel free to contact me. Kyle Kyle Barnes Regulatory Specialist US Army Corps of Engineers Wilmington District Washington Field Office 910-251-4584 We at the U.S.Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: Blockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0 <Blockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0> Thank you for taking the time to visit this site and complete the survey. Classification: UNCLASSIFIED Caveats: NONE Classification: UNCLASSIFIED Caveats: NONE 2 • • y � n. Mgt, �. V^ N. m ok"°. .. �F A Google"ea rth -