HomeMy WebLinkAbout20150949 Ver 1_NW12 Emails_20151106 From: Barnes, Kyle W SAW <Kyle.W.Barnes@usace.army.mil>
Sent: Friday, November 06, 2015 11:37 AM
To: Brian Oschwald
Cc: Scarbraugh, Anthony
Subject: RE: Washington County NWP 12 (UNCLASSIFIED)
Attachments: SAW 2015-02032 Wetland.pdf
Classification: UNCLASSIFIED
Caveats: NONE
Brian,
All I needed was the revised PCN.The verification has to be issued to an individual and that info was not on the original
application.The information that I sent you regarding the wetland location is for the project(attached again). It appears
that the shoulder of NC32 is a little narrow and steep for directional drilling. If by chance the project changes you have the
wetland info so impacts can be avoided when staging equipment in that area. I should have the verification issued today.
Kyle
-----Original Message-----
From: Brian Oschwald [mailto:boschwald@thewootencompany.com]
Sent:Tuesday, November 03, 2015 3:25 PM
To: Barnes, Kyle W SAW
Cc: Scarbraugh,Anthony
Subject: [EXTERNAL] RE: Washington County NWP 12 (UNCLASSIFIED)
Kyle,
Here is the updated Page 1 of the PCN. I am working on the wetland information with our surveyors. What exactly are
you looking for in regards to information related to jurisdictional waters or wetlands?
Thanks,
Brian Oschwald, PE
Project Engineer
The Wooten Company
120 North Boylan Avenue
Raleigh, NC 27603
919.828.0531
Fax 919.834.3589
Blockedwww.thewootencompany.com
-----Original Message-----
From: Barnes, Kyle W SAW [mailto:Kyle.W.Barnes@usace.army.mil]
Sent:Tuesday, November 03, 2015 1:13 PM
To: Brian Oschwald
i
Cc: Scarbraugh,Anthony
Subject: Washington County NWP 12 (UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE
Brian,
I went by the site today and reviewed the impact areas.The crossings at S1 and S2 are not jurisdictional.The crossings at
S3 &S4 are jurisdictional.At S4 there are wetlands within the new ROW. Keep in mind that if the project moves more
than 5 feet off of EOP as indicated on the plans wetland impacts will need to be avoided or quantified. I attached an aerial
of the wetlands adjacent to the project area. Be sure the town and the contractor understands that they should stage
equipment outside of waters and wetlands during the directional drilling process. I will remove the proposed impacts
from the PCN for S1 and S2.The verification for the NWP 12 will be sent out as soon as you send me the information
requested in yesterdays email. If you have any questions feel free to contact me.
Kyle
Kyle Barnes
Regulatory Specialist
US Army Corps of Engineers
Wilmington District
Washington Field Office
910-251-4584
We at the U.S.Army Corps of Engineers Regulatory Branch are committed to improving service to our customers. We
would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at:
Blockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0
<Blockedhttp://corpsmapu.usace.army.miI/cm_apex/f?p=136:4:0>
Thank you for taking the time to visit this site and complete the survey.
Classification: UNCLASSIFIED
Caveats: NONE
Classification: UNCLASSIFIED
Caveats: NONE
2
• •
y �
n.
Mgt,
�. V^
N.
m
ok"°. ..
�F
A
Google"ea rth -