Loading...
HomeMy WebLinkAboutNCS000535_NOI Site Inspection_20240229 Compliance Inspection Report Permit:NCS000535 Effective: 06/01/10 Expiration: 05/31/15 Owner: Xcf Global Capital Inc SOC: Effective: Expiration: Facility: Good Steward Biofuels County: Wilson 1724 Baldree Rd Region: Raleigh Wilson NC 27893 Contact Person:Robert Barr Title: Phone: 520-301-5182 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 02/09/2024 Entry Time 02:20PM Exit Time: 02:55PM Primary Inspector:Thaddeus W Valentine Phone: Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Technical Assistance Permit Inspection Type: Stormwater Discharge, Individual Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCS000535 Owner-Facility:Xcf Global Capital Inc Inspection Date: 02/09/2024 Inspection Type:Technical Assistance Reason for Visit: Routine Inspection Summary: The facility is abandoned with large vertical steel tanks and small poly tanks in different areas of the site. There are drums, fuel truck, tanker trucks, numerous steel tank, shipping containers and used pallets located all around the site. It appears the site has been abandoned for years Page 2 of 3 Permit: NCS000535 Owner-Facility:Xcf Global Capital Inc Inspection Date: 02/09/2024 Inspection Type:Technical Assistance Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ #Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ #Does the facility provide and document Employee Training? ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ 0 ❑ Comment: SP3 not available Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? ❑ 0 ❑ ❑ Comment: No qualitative samples have been taken and submitted Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ 0 ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ 0 ❑ ❑ Comment: No analytical samples have been taken and submitted Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ 0 ❑ ❑ #Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ #Has the facility evaluated all illicit(non stormwater)discharges? ❑ 0 ❑ ❑ Comment: The facility is abandoned Page 3 of 3