Loading...
HomeMy WebLinkAbout20240361 Ver 1_07_PlanSheets_TrinitieTrail_20240304C Q L I 0 LO 0 �1 O Q_ O O a O L ,c i I O O Ln 0 0 0 I Y a Lm -L - -Sw- O ■■� PI Sto 12 +51.99 PI Sto 14 +33.91 PI Sto 9 +18.83 PI Sto 9 +//.7/ PI Sto 9 +3/.5/ PI Sto /0 +63.90 PI Sta /0 +80.09 PI Sto ll +26.60 ••1 ••• = 0° 25" 07.8" (RT ) L = 6° 25' 11.9" (LT ) 0 = 20° 24' 23.0" (RT ) L = 20° 2/' 37.6" (LT) A = 0° 22' 22.4" (RT ) L = i 24' 59.1" (LT ) 0 = 5° 13' 46.3" (RT ) A = 5° 00' 49.7" QT J ^ 0 zo'0 G ^ �� 00 D = 2° 0/' 28.5" D = 5° 09' 42.4" D = 286° 28' 44.0" D = 286° 28' 44.0" D = 2° 02' 07.3" D = 5° 05' 34.6" D = 114° 35' 29.9" D - 114° 35 29.6 NC �o L = 20.69' L = 124.38" L = 7.12" L = 7.11' L = 18.32' L = 27.8/' L - 4.56 L - 4.38 qQ R/p w z o T = 10.34' T = 62.25' T = 3.60' T = 3.59' T = 9.16' T = 13.91" T = 2.28' T = 2.19' $ J U OZ Z X J R = 2430.00' R = /j/0.00' R = 20.00" R = 20.00' R = 2,815.00" R = 1,125.00" R = 50.00' R = 50.00' 0>> W } J a z LOU a 2E a a -L- POT Sto.10+00.00 17o Q 170 N/F RUSSELL GLOCK, JR AND SOUNDS/DE BLOCKS SOUNDS/DE BLOCKS PATR/C/A E. CLOCK TRUSTEES 170,171,172,174174,175 ,B. 1f50 G, 281 -25170,171,172,173,174,175 P 60' to P,B. 5 PG 24-25 P,N, 0227170M BEGIN CONSTRUCTION BEGIN GRADE I I LANDSCAPE - TIMBERS -L - POT Sto. ll #8:3:0 28"RUMP 'APPROXIMATE LOC4TION SEPTIC T, AND NI TRIFICA TIOJFIELD THIS AA C 1 REfe.MEN.CE PERMIT 320 I nl a 18" OAK I n I LANDSCAPE 12" GUM TIMBERS, TYP. 2 18" OAKCH I 15 HK L- POT Sto.13 +15.80 END BRIDGE -L- POT Sto. I3+03.68 a A BEGIN BRIDGE w -L- POT Sto.12 +72.18 --R o NSF i Z RUSSELL GLOCK, JR AND PATR/C/A E. aOCK TRUSTEES v D.B. 2150 PG 281 P.N, 022717000 1 p BULKF ' -,r-lyii BEGIN APP ACTH SLAB > -L- POC o.12+60.05 `� r� 16,65 r `y EIR I EIR-_::_:.:- :.:,,.:_ :�:- :._-_s__-_-_: _ i AP I � � � � •�.,� '� EXIST RI W DEAD 16" G� o RELOCATE EXIST I (Np N z I I 20 HKY NEIGHBORHOOD SIGN rl O 16" GUM I _. 12" HL Y i •r \`4 I 115" GUM ' I 22" GUM '4 j I PINE IN '80 1 -2B" GUM- 1 P f° - _ - _E 4:cuM " HitW INC -�_ y r n„ F -� CHARTER /�CO - EMN- TBM - P L`��tC ................. v..........................RiPRAP...... GrBEG T L ,f5080) I\� - II ROLLED CURB a I a ui INV (N) 5.86 ROLLED CURB INV (E) 5.82 _L I�' I `°► 100' DI TOP 7,66 TRINITIE TRAIL o 0 21 25 I�ETAINING ti N l8° 5/ 17.6 W TIMBER WALL I INV (W) 5.86 ' " (PUBLIC R/w VAR/E 21' o I0. o - DI TOP 7.64 PAVEMENT) P. B, 5 PG 25 �- - - uc _ c3atla'SVld.9 GL- RI�ONC;i_ I� C- BS T- • _.. =_.._..._.._._.... �� WALK �� O ..-_._...---..._..__.._._.. _ - - - - - - 1 - '-'z.z.� �'.'___ �� K �© ECM 24" ST 15" OAK CM TRANS STUMP M TRANS � �" C�7 �ECB 24' PINE 18" PINE 2 14" GUM 15" BCH 20" HKY 16" PINE 16" OAK 22" HKY 22" HKY 171 a2 N WILIAM LEE MILLER AND WIFE, HEATHER CRONIN MILLER D,B, 1560 PG, 199 P,N, 022781000 EXIST-RIW 18" GUM 12" GUM 20" OAK I ECk' t 7t Ot i N SOUNDS/DE BLOCKS 170,171,172,173,174,175 JEFFREY W. HUMMEL AND KATHERINE P.B, 5 PG, 24-25 WIFE, C. HUMMEL D,B, 2333 PG, 301 i P,N. 022780OW 15" PINE 15"' HDPE I i I Tk DOW I � •i T I EM TIMBER C C C i> RETAINING I I WALLS L �- - - - - - �i - _ _ _ C _ 52" STUMP T _T YPE III i5" �D GUARD R. TT TYPE _ _ TB_2G1 I33l�IO, I N I l8°26T 09.8"'w 15" HOPE N 1805/' 17 'W ff C AT 14" OAK 14" GUM � 14" PINE EIR F, jl ![//// KMD GUARD 29 MP RAIL 16" �- CURSHED F & ALLS W- POT Sto. 9+00.00 = // POT 12+21.85 (17.5' RT ) IPPROXIMATE LOCATION SEPTIC TA10K AND NITRIFICATION FIELD THIS AREA REFERENCE PERMIT 07417 BEGIN CONSTRUCTION -SW - POT Sto. 9+05.00 = _.__..._._.... -L - 12+24.00 (17.5' RT ) -SW- PC Sta. 9+08J2 -SW- PRC Sto. 9+15.23 -L- PC Sto. 12+41.65 _SW- PCC Sto. 9+22.35 PINE " PINE /0' TYPE III.5" ►ODE WOOD _ -1N 18026 C i EIR C&G 1/L TAPE IIL _ DV 18" 29-9. " W JB W1 H ; IC R8'(F a 1, C F F vei T TCM CL-B IPRAP a n WOOD BULKHEADS - REMOVE EXIST CULVERT (STRUCTURE ITEM) FEMA 500-.4 FLOOD FLOODWAY LINES FROM FRIS CIS DOWNLOAD; REFERENCE FIRM MAP 3720986700K PANEL 9862 fFFECTOW EL i ON/20 4F E T'00 NAVD88 YEAR A SE I -SW- PT Sto. 9+40.67 -L- PT Sto.12 +62.33 -L - PC Sta. 13+7I.66 N W/LL/AM C, SILBERMAN AND WIFE, MARY M S/LBERMAN D,B. 1446 PG, 69 WILL BOOK f4EO-f03 P,N, 022494000 � 4f0 15" HOLLY 20" PINE n. 18' GUM JG CL-B RI C14A n PTIC TANK ANDONITRIFICATION XIMATE TFI LD ION ETHIS AREA REFERENCE PERMIT 18761 N/F WAYNE A. SMITH AND u') WIFE, YONG S. SMITH D.B. 2405 PG. 735 P, N. 022493000 z¢ v WOOD STEPS *DECK END CONSTRUCTION a ' � W � TIE TO EXISTING `I =-SW- Sto.11+,49.13=aI� NamMuasPrLoREaE pauuAi S-L- Sto l4 f2/' RTJ � PRELIMINARY PLANS 1 2w NOT m Fm c°Nmucrm Ii�2. FND GRADE f aZ -L - POC Sto. SEAL nor E"..'T t lh 24" DOAK 36" OAK Q�j� O / 18" GUM _Ma � 12" ST 10' TRANSITION FROM 27" OAK � 15" TUMP 4, 27" OAK EXIST R/►N 2'-6" CURB AND GUTTER / / 18" GUM ECM TO 2'-O" PAVED SHOULDER A I -`- SEE SHEET 2A-2 P -L - Sto. 14 t2l.00 14" GUM 1 8" GUM Iv - / I - Vba - 15" DGLIM I I ( TBM (#6757 IE TRAIL 60' TRINIT W 10' TB 2 G 100' I 1' PAVEMENT N N-) I R VAK'C' o O O I (PUBLIC P.B. 5 PG 2 - I I III _ _ N9 0 0 10, o CB 15" PE TB 2G1 � - - - 0)'Stl�d.9 INCOMPLETE PLANS W NOT = FOR Rlr/ ACOUMTM PRELIMINARY PLANS w mm m FM c°Nerauc7wN SEAL 1 HDPE o 3' 'GH WOOD FEN EEO' STY + 36" GUM O e 18" OA 0 12" OAK 28" OAK 15' OAK REMOVE EXIST SIDEWALK AND STAIRS 10" & -SW- POT Sto. 10+00.00 CHICAHAUK SUBDIW5101v PB 7PG 6 _ _ N T t3Lltl _ - - N 19° 8/ 3 C CRETE WALK N - +- -� l� - - - DNS ------EXIST R/I^/ o � I I I 2" 0A rcM y l l0/ (TYF) I W ��� 26" OAK Dw I OAK I � � I M 16" GUM XIS R/W PINE24" OAK o Ctr) • 16" STUMP v REMOV�X 18" G M t0" GUM CONC%jE ME i 10" Dw ( I I Is, GUM i o f I I APPROXIMATE LOCATION SEPTIC TANK AND NI TRIFICA TION FIELD THIS / I i 12" STUMP 12" STUMP +, 97009 30A REFERENCE PERMIT IPPROXIMATE LOCATION SEPTIC IS ANDNITRIFIC REFERENCET ION PERMI TL 97 091. KSUBDIVISION 7I PG 6 SW - POT Sto. 11 +45.24 i NA -SW -• PTjto. 11+28.79 AND N9FE, MAR/A M,EGRADELESS LESS -Sw _ Ply StQ, ;Il +24.42 D,B, 1690 PG, 425 P, N. 0026793000 -SW- PT Sto.10+82.37 i { -SW- PRC Sto.10+77.81 i i -SW- PC Sto. 10+50.00 I N/F EDWN SCOTT BAIR AND WIFE, JUL/A BAIR a Da 1742 PG 199 '+r P,N, 026791000 a Z a ❑ U WZU)ZQZ uj< zu = U) LL'Lu F -�U�U) wrzz�cn U) Q Y ❑ aW m U� Q uz)0-L CDWOQ=O 0 ~ d Q W O Q U) } Q Z Y 0- 0 O z 0 U ❑ W O H Z W U)�J ❑�Qm 0 W N Q U Z W � =z❑OF- - W ❑ =�Q�o ~uiaQ� Lou�w� 16, �>Do- � W O =W<~°° W LL��J W 0~�0 CC -0Z=0 W U = U Z :E = H Z Lu Z3 =���w Q U z 0 W Q C O_LLWU cnQw0u) CS 1 Z H 0 0 0 Q W cc tm • Z 0 H W t7 c U Lu h Q ~° a a a z W � J O KHA PROJECT. 011541001 DATED 2/29/2024 35% PLANS SEE SHEET 5 FOR -L - PROFILE SEE SHEET 5 FOR -SW- PROFILE r