HomeMy WebLinkAboutSW7011001_Annual Certificate of Completion (2024)_20240304 CERTIFICATE OF COMPLETION
Post-Construction Stormwater Annual Permit Certification
This certifies that Brian Weisker has completed the Annual Permit Certification for Post-Construction Stormwater Permit SW7011001, Piedmont Natural
Gas, New Bern Operations Center, located in New Bern,Craven County,on March 4,2024 in accordance with G.S. 143-214.7(b4). Please keep a copy of
this certificate for your records.The electronic record will be stored in the Department of Environmental Quality's digital repository permit file.
The Annual Permit Certification must be completed each year on or before the day of permit issuance, March 30. Failure to do so is a violation of your
permitting conditions and is subject to enforcement action per G.S. 143-215.6.
Jim Farkas
State Stormwater Engineer
Division of Energy, Mineral,and Land Resources