HomeMy WebLinkAboutSW3240204_Plansheet - Notes_20240305 GENERAL NOTES DUKE ENERGY NOTES: 1. ALL WORK SHALL BE DONE IN ACCORDANCE 9. THE CONTRACTOR SHALL BE RESPONSIBLE 1. NO STOCKPILING OF ANY MATERIALS WITHIN THE DUKE WITH THE TECHNICAL SPECIFICATIONS AND FOR THE REMOVAL AND REPLACEMENT TO ENERGY TRANSMISSION EASEMENT AT ANY TIME. ALL APPLICABLE PERMITS. ORIGINAL OR BETTER CONDITION OF ALL EXISTING PAVEMENTS, GRAVEL ROADWAYS, 2. DUKE ENERGY SHALL HAVE FREE AND CLEAR 2. THE CONTRACTOR IS SOLELY RESPONSIBLE PIPE CULVERTS, FENCES, AND INGRESS/EGRESS TO ITS FACILITIES AT ALL TIMES. FOR SITE SAFETY ASSOCIATED WITH THE MISCELLANEOUS ITEMS WHERE REQUIRED WORK UNDER THIS PROJECT AND FOR TO COMPLETE THE CONSTRUCTION. 3. ALL CROSSING MATERIALS SHALL BE ABLE TO WITHSTAND COMPLIANCE WITH ALL FEDERAL, STATE AND 80K POUNDS. LOCAL HEALTH AND SAFETY LAWS, CODES, 10. ALL HOLES, TRENCHES, AND OTHER REGULATIONS, AND ORDINANCES HAZARDOUS AREAS SHALL BE ADEQUATELY 4. ALL CROSSINGS SHALL BE BACKFILLED WITH SUITABLE INCLUDING BUT NOT LIMITED TO THOSE PROTECTED BY BARRICADES, LIGHTS OR MATERIAL AND COMPACTED TO 95% AT END OF EACH DAY. CURRENTLY MANDATED BY THE OTHER PROTECTIVE DEVICES. OCCUPATIONAL SAFETY AND HEALTH 5. DUKE ENERGY IS NOT BE RESPONSIBLE FOR ANY DAMAGE ADMINISTRATION (OSHA). 11. REMOVAL OF EXCAVATED MATERIALS AND TO CONSTRUCTION MATERIALS WITHIN THE TRANSMISSION DAILY CLEANUP OPERATIONS SHALL BE EASEMENT. 3. CONTRACTOR SHALL USE ADEQUATE PERFORMED IN COMPLIANCE WITH THE SHORING METHODS TO ENSURE: SPECIFICATIONS AND TO THE SATISFACTION 6. ALL EROSION CONTROL DEVICES WITHIN DUKE ENERGY'S OF THE OWNER/ENGINEER. TRANSMISSION EASEMENT SHALL BE REMOVED UPON 3.A.COMPLIANCE WITH OSHA REGULATIONS. COMPLETION AND ACCEPTANCE OF PROJECT. VEGETATION 12. EXCESS/UNSUITABLE SPOIL TO BE REMOVED MUST BE RE-ESTABLISHED IN DUKE ENERGY'S 3.13.PROTECTION OF EXISTING PAVEMENT FROM SITE. PRIOR TO BEGINNING TRANSMISSION EASEMENT IF DAMAGED. AND ROAD SHOULDERS, STRUCTURES CONSTRUCTION, CONTRACTOR SHALL AND UTILITIES. SUBMIT THE OFF-SITE SPOIL LOCATIONS TO 7. ALL WORK WITHIN DUKE ENERGY'S TRANSMISSION BE USED AND PROVIDE DOCUMENTATION OF EASEMENT SHALL COMPLY WITH DUKE'S GUIDELINES AND 3.C.CONSTRUCTION ACTIVITIES ARE PERMITTED EROSION CONTROL MEASURES RESTRICTIONS, CLEARANCES AND OSHA REGULATIONS. CONFINED TO RIGHTS-OF-WAY OR AND ALL OTHER APPLICABLE PERMITS TO BE EASEMENTS AS INDICATED PROVIDED DURING DISPOSAL OPERATIONS. 8. CONTACT WILLIAM JOHNSON, TRANSMISSION ASSET CONTRACTORS OFF-SITE SEDIMENT PROTECTION PROGRAM MANAGER WITH DUKE ENERGY AT 4. LIMITS OF DISTURBANCE (LOD) SHALL BE AS CONTROL MEASURES MUST BE APPROVED BY 910-844-7572, WILL.JOHNSON@DUKE-ENERGY.COM WITH INDICATED ON THE CONTRACT DRAWINGS. NCDEQ PRIOR TO SPOIL DISPOSAL. ANY RIGHT-OF-WAY CONCERNS. ANY CHANGES TO THE LOD BY THE CONTRACTOR SHALL REQUIRE PRIOR 13. ALL EROSION AND SEDIMENTATION APPROVAL FROM THE ENGINEER. ALL AREAS CONTROLS SHALL BE IMPLEMENTED BEFORE DISTURBED BEYOND INDICATED LIMITS CONSTRUCTION COMMENCES AND SHALL SHALL BE RESTORED TO PRE-EXISTING NOT BE REMOVED UNTIL PERMANENT CONDITIONS REGARDLESS OF AREA GROUND COVER STABILIZATION HAS BEEN AFFECTED AT NO ADDITIONAL COST TO THE ESTABLISHED. OWNER. 14. THERE IS NO PAY ITEM FOR DEWATERING 5. LOCATION OF EXISTING UTILITIES, PIPING, AND NO SEPARATE PAYMENT WILL BE MADE AND SITE ITEMS SHOWN ON THESE PLANS FOR DEWATERING. ANY DEWATERING OF WERE COMPILED BASED ON THE BEST EXCAVATIONS REQUIRED IS THE INFORMATION AVAILABLE, INCLUDING A RESPONSIBILITY OF THE CONTRACTOR AND COMBINATION OF FIELD SURVEY AND SHALL BE DONE AT NO ADDITIONAL COST TO RECORD DRAWINGS. THESE LOCATIONS ARE THE OWNER. NOT CONSIDERED TO BE EXACT OR COMPLETE. CONTRACTOR SHALL VERIFY 15. THE CONTRACTOR SHALL RECORD AND THESE LOCATIONS BOTH HORIZONTALLY SUPPLY TO THE ENGINEER THE LOCATION OF AND VERTICALLY PRIOR TO CONSTRUCTION. ALL UTILITIES CROSSED AND THE NEW LOCATE WELL AHEAD OF EXCAVATION AND LOCATION AND DEPTH OF ALL RELOCATED PIPE LAYING OPERATIONS TO ALLOW FOR AND/OR ADJUSTED UTILITIES. ADJUSTMENT TO PIPE ALIGNMENT AND ELEVATION AS REQUIRED. NO SEPARATE 16. APPROVAL OF THIS PLAN IS NOT AN PAYMENT WILL BE MADE FOR FIELD AUTHORIZATION TO GRADE ADJACENT VERIFICATION OR ADJUSTMENT OF DEPTH AS PROPERTIES. WHEN FIELD CONDITIONS REQUIRED. WARRANT OFF-SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED 6. IN THE EVENT OF DAMAGE TO EXISTING PROPERTY OWNERS. UTILITIES, CONTRACTOR SHALL STOP WORK IMMEDIATELY, TAKE NECESSARY 17. ALL PRECAST CONCRETE SANITARY SEWER PRECAUTIONS TO PREVENT INJURY OR AND PROCESS MANHOLES SHALL BE FURTHER DAMAGE, AND NOTIFY PROPER MANUFACTURED WITH A MIC ADMIXTURE AUTHORITIES. CONTRACTOR SHALL BE PER SPECIFICATION 330561 IN THE UTILITY RESPONSIBLE FOR RESTORING/REPAIRING STRUCTURES SECTION. ALL EXISTING STRUCTURES, CONDUITS, OR OTHER UTILITIES DAMAGED BY 18. IN ADDITION TO THE REQUIREMENTS LISTED CONTRACTOR'S OPERATIONS AT NO COST TO IN ITEM 5 ON THIS SHEET, CONTRACTOR OWNER. SHALL BE RESPONSIBLE FOR FIELD VERIFYING EXISTING PIPING, ELECTRICAL, 7. REMOVAL AND REPLACEMENT OR REPAIR OF ETC. AT THE PLANT SINCE THESE ITEMS EXISTING UTILITY SERVICES SHALL BE WILL NOT BE LOCATED FROM A STANDARD COORDINATED WITH APPROPRIATE UTILITY UTILITY LOCATION REQUEST. COMPANY AT NO ADDITIONAL COST TO THE OWNER. 8. IT WILL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH POWER AND TELEPHONE COMPANIES FOR RELOCATING OR STABILIZING ANY EXISTING POLES WHICH WILL BE DISTURBED BY CONSTRUCTION. THIS WORK SHALL BE DONE AT NO COST TO OWNER. LEGEND IL SYMBOLS NEW DEMO EXISTING NEW EXISTING NEW EXISTING ABBREVIATIONS N 8 TEL PED G TEMPORARTY SEEDING BUILDING/STRUCTURE 300 3� �1'W��YW� /vvvv� APPROXIMATE WOODLINE EOP EDGE OF PAVEMENT G GAS N POWER POLE / CONTOUR — YARD PIPING LOD LIMITS OF DISTURBANCE SS SANITARY SEWER S BITUMINOUS PAVEMENT X302.00 302.00 SPOT ELEVATION SOIL BORING PERMANENT SEEDING " " " " " " " " " " " " X ;� MANHOLE CONCRETE CURB PROPERTY LINE `-- OHE OVERHEAD ELECTRIC W WATER cn BENCH MARK 7 7 7 r--� w AND GUTTER SF SILT FENCE ssF SUPER SILT FENCE L�j YARD INLET FOC FIBER OPTIC CABLE R PROPERTY LINE m SEDIMENT LOG/SWALE PROTECTION O A o o e • . e, CONCRETE PAD/PAVING TPF TREE PROTECTION FENCE CENTER LINE T FLARED END SECTION LP LIGHT POLE INLET PROTECTION IP i LOD LIMITS OF DISTURBANCE (F.E.S.) > m O —x x x— �c�x�k7- —x x x- FENCE UGE UNDERGROUND RECM ROLLED EROSION W (RESET/NEW) ELECTRIC CONTROL MATTING _ — 100-YR FLOODPLAIN PP POWER POLE U CONCRETE SIDEWALK SD — STORM DRAIN LINE } } EROSION CONTROL BLANKET TOP OF BANK k k } } U 6 z STABILIZED CONSTRUCTION ENTRANCE/EXIT STORMWATER FLOW 3�. w z ENOG N JECT ER: M. PARKER UNION COUNTY DATE: FEBRUARY 2024 mi } DESIGNED BY: Z. KEMAK O��N CARi HAZEN NO.: CD �oFEss, � e D. NORTH CAROLINA GENERAL 30831-070 DRAWN BY: T. BARNES S Isar r CONTRACT NO.: Haze I 1 Mich el Pad 202 0 .2I I _ CIVIL U N DRAWING CHECKED BY: J. STRUVE FN 1-0 00' HAZEN AND SAWYER GENERAL NOTES AND LEGEND NUMBER: M W by SINE 9101 SOUTHERN PINE BLVD, SUITE 250 GRASSY BRANCH WRF EXPANSION o Q IF THIS BAR DOES NOT 0 1/2" 1" F� p P P CHARLOTTE, NORTH CAROLINA 28273 a ❑ MEASURE 1"THEN DRAWING LICENSE NO. : C-0381 C a� o REV ISSUED FOR DATE BY IS NOT TO FULL SCALE LL a