Loading...
HomeMy WebLinkAboutSW6230705_Design Calculations_20240304 (2) OUTLET PROTECTION DATE DESIGN PHASE DESIGN 04-04-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Serenity Phase 3, 4&5 1975 REVISION / / LOCATION BY RECORD / / Harnett County, North Carolina CJP OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= FES 192 Qio/Qfull = 0.87 Pipe Dia= 30 in V/Vfull = 1.12 Q10= 35.57 cfs V= 9.4 fps Qfull = 40.99 cfs Vfull = 8.34 fps From Fig. 8.06.b.1: Zone = 6 From Fig. 8.06.b.2: D5o = 14 in DMAX = 21 in III :.:�:�44Riprap Class = 2 i�����i���� L Apron Thickness = 31.5 in 0•0-0•0•0•: _�•������=�� 3 Apron Length 25.0 ft 1••�••�••�••�••�••�•• Apron Width @ Outlet = 7.5 ft Apron Width @ End = 27.5 ft Length Storm Outlet Structure FES No.= FES 195 Q1o/Qfull = 0.59 Pipe Dia= 48 in V/Vfull = 1.04 Q10= 84.54 cfs V= 11.8 fps Qfull = 143.30 cfs Vfull = 11.39 fps From Fig. 8.06.b.1: Zone = 6 From Fig. 8.06.b.2: D50 = 14 in DMAX = 21 in Riprap Class = 2 s Apron Thickness = 31.5 in 3 Apron Length = 40.0 ft Apron Width @ Outlet = 12 ft Apron Width @ End = 44.0 ft Length 1975 Storm.xlsx LATEST REVISION:3/4/2024 11:51 AM PAGE 1 OF 7 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 04-04-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Serenity Phase 3, 4&5 1975 REVISION / / LOCATION BY RECORD / / Harnett County, North Carolina CJP OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= FES 200 Q1o/Qfull = 0.38 Pipe Dia= 42 in V/Vfull = 0.93 Q10= 45.21 cfs V= 11.5 fps Qfull = 118.78 cfs Vfull = 12.33 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D50 = 10 in DMAX = 15 in Riprap Class = 1 s Apron Thickness = 22.5 in 3 Apron Length 28.0 ft Apron Width @ Outlet = 10.5 ft Apron Width @ End = 31.5 ft L Length Storm Outlet Structure FES No.= FES 201 Q1o/Qfull = 0.26 Pipe Dia= 24 in V/Vfull = 0.83 Q10= 13.41 cfs V= 13.5 fps Qfull = 51.22 cfs Vfull = 16.28 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in •:••••••••••••• Riprap Class = B IttIIIIiJJJIII s Apron Thickness = 18 in MMN * '8 Apron Length = 12.0 ft Apron Width @Outlet = 6 ft Apron Width @ End = 14.0 ft Length 1975 Storm.xlsx LATEST REVISION:3/4/2024 11:51 AM PAGE 2 OF 7 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 04-04-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Serenity Phase 3, 4&5 1975 REVISION / / LOCATION BY RECORD / / Harnett County, North Carolina CJP OTHER / / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= FES 198 Q1o/Qfull = 0.41 Pipe Dia= 42 in V/Vfull = 0.94 Q10= 58.14 cfs V= 13.9 fps Qfull = 142.23 cfs Vfull = 14.76 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D50 = 10 in DMAX = 15 in Riprap Class = 1 s Apron Thickness = 22.5 in 3 Apron Length 28.0 ft Apron Width @ Outlet = 10.5 ft Apron Width @ End = 31.5 ft L Length Storm Outlet Structure FES No.= FES 203 Q1o/Qfull = 0.21 Pipe Dia= 30 in V/Vfull = 0.78 Q10= 25.43 cfs V= 19.2 fps Qfull = 120.55 cfs Vfull = 24.53 fps From Fig. 8.06.b.1: Zone = 6 From Fig. 8.06.b.2: D5o = 14 in I DMAX = 21 in Riprap Class = 2 s Apron Thickness = 31.5 in 3 Apron Length = 25.0 ft Apron Width @ Outlet = 7.5 ft Apron Width @ End = 27.5 ft Length 1975 Storm.xlsx LATEST REVISION:3/4/2024 11:51 AM PAGE 3 OF 7 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 04-04-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Serenity Phase 3, 4&5 1975 REVISION / X / LOCATION BY RECORD / X / Harnett County, North Carolina CJP OTHER / X / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= FES 204 Q1o/Qfull = 0.23 Pipe Dia= 30 in V/Vfull = 0.81 Q10= 29.46 cfs V= 21.4 fps Qfull = 130.58 cfs Vfull = 26.57 fps From Fig. 8.06.b.1: Zone = 6 From Fig. 8.06.b.2: D5o = 14 in DMAX = 21 in Riprap Class = 2 s Apron Thickness = 31.5 in 3 Apron Length = 25.0 ft Apron Width @ Outlet = 7.5 ft Apron Width @ End = 27.5 ft L Length 1 Storm Outlet Structure FES No.= FES 216 Q1o/Qfull = 0.51 Pipe Dia= 15 in V/Vfull = 1.00 Q10= 8.11 cfs V= 12.9 fps Qfull = 15.82 cfs Vfull = 12.88 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length = 7.5 ft Apron Width @ Outlet = 3.75 ft Apron Width @ End = 8.8 ft Length 1975 Storm.xlsx LATEST REVISION:3/4/2024 11:51 AM PAGE 4 OF 7 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 04-04-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Serenity Phase 3, 4&5 1975 REVISION / X / LOCATION BY RECORD / X / Harnett County, North Carolina CJP OTHER / X / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= FES 208 Q1o/Qfull = 0.31 Pipe Dia= 24 in V/Vfull = 0.87 Q10= 22.10 cfs V= 19.7 fps Qfull = 70.86 cfs Vfull = 22.53 fps From Fig. 8.06.b.1: Zone = 5 From Fig. 8.06.b.2: D5o = 14 in DMAX = 21 in Riprap Class = 2 s Apron Thickness = 31.5 in 3 Apron Length = 20.0 ft Apron Width @ Outlet = 6 ft Apron Width @ End = 22.0 ft L Length Storm Outlet Structure FES No.= FES 206 Q1o/Qfull = 0.15 Pipe Dia= 42 in V/Vfull = 0.72 Q10= 37.30 cfs V= 18.2 fps Qfull = 243.59 cfs Vfull = 25.28 fps From Fig. 8.06.b.1: Zone = 5 From Fig. 8.06.b.2: D5o = 14 in DMAX = 21 in Riprap Class = 2 s Apron Thickness = 31.5 in 3 Apron Length = 35.0 ft Apron Width @ Outlet = 10.5 ft Apron Width @ End = 38.5 ft Length 1975 Storm.xlsx LATEST REVISION:3/4/2024 11:51 AM PAGE 5 OF 7 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 04-04-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Serenity Phase 3, 4&5 1975 REVISION / X / LOCATION BY RECORD / X / Harnett County, North Carolina CJP OTHER / X / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= FES 210 Q1o/Qfull = 0.80 Pipe Dia= 30 in V/Vfull = 1.11 Qio= 25.99 cfs V= 7.3 fps Qfull = 32.39 cfs Vfull = 6.59 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D5o = 8 in DMAX = 12 in Riprap Class = B s Apron Thickness = 18 in 3 Apron Length 15.0 ft Apron Width @ Outlet = 7.5 ft Apron Width @ End = 17.5 ft L Length Storm Outlet Structure FES No.= FES 213 Q1o/Qfull = 0.22 Pipe Dia= 36 in V/Vfull = 0.78 Q10= 29.10 cfs V= 14.6 fps Qfull = 132.59 cfs Vfull = 18.73 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D5o = 10 in DMAX = 15 in Riprap Class = 1 s Apron Thickness = 22.5 in 3 Apron Length 24.0 ft Apron Width @ Outlet = 9 ft Apron Width @ End = 27.0 ft Length 1975 Storm.xlsx LATEST REVISION:3/4/2024 11:51 AM PAGE 6 OF 7 OUTLET PROTECTION DATE DESIGN PHASE DESIGN 04-04-23 PRELIM / / PROJECT NAME PROJECT NO CONSTR / X / Serenity Phase 3, 4&5 1975 REVISION / X / LOCATION BY RECORD / X / Harnett County, North Carolina CJP OTHER / X / CHECKED BY (SPECIFY) CSB Storm Outlet Structure FES No.= FES 215 Q1o/Qfull = 0.33 Pipe Dia= 30 in V/Vfull = 0.89 Q10= 22.52 cfs V= 12.4 fps Qfull = 68.42 cfs Vfull = 13.92 fps From Fig. 8.06.b.1: Zone = 3 From Fig. 8.06.b.2: D5o = 10 in DMAX = 15 in Riprap Class = 1 s Apron Thickness = 22.5 in Apron Length = 20.0 ft Apron Width @ Outlet = 7.5 ft Apron Width @ End = 22.5 ft Length 1975 Storm.xlsx LATEST REVISION:3/4/2024 11:51 AM PAGE 7 OF 7