HomeMy WebLinkAboutNC0024201_2024 Compliance Evaluation Inspection_20240301 March 1st, 2024 Thomas Wrenn Roanoke Rapids Sanitary District PO Box 308 Roanoke Rapids, NC 27870 Subject: Compliance Evaluation Inspection Roanoke River WWTP NPDES Permit NC0024201 Halifax County Dear Mr. Wrenn: On Wednesday, February 27th, 2023, Kevin Fowler conducted a compliance evaluation inspection of the treatment systems located at Roanoke River WWTP. The purpose of this visit was to conduct an inspection of the subject NPDES facility. During the inspection, the presence and cooperation of Steven Lee Ellis, Operator in Responsible Charge (ORC), and Timothy Van Skipper, Chief Operator, were helpful and appreciated. The Roanoke River WWTP, located is at 135 Aqueduct Road, Weldon, North Carolina 27890 in Halifax County. The plant has a Municipal Wastewater Discharge permit. This NPDES compliance evaluation inspection consisted of the following:  Review of the NPDES permit.  Review of the owner/facility information.  Review of January 2022 – January 2024 monitoring data.  Review of January 2022 – January 2024 compliance history.  On-site inspection of the treatment systems; and  On-site inspection of discharge outfalls DocuSign Envelope ID: E3F4A767-CE57-4DFF-955B-CA038DB318F0 Page 2 of 3 Roanoke River WWTP Compliance Inspection 2024 2 Findings during the pre-inspection file review were: 1. Through NPDES permit NC0024201, Roanoke River WWTP. is authorized to discharge treated wastewater to the Roanoke River classified C waters in the Roanoke River Basin. The current NPDES permit was issued effective April 1, 2023, and will expire March 31, 2028. An application for renewal of this permit should be submitted no less than six months before the expiration of the current permit. 2. The plant provides treatment and discharge of wastewater through outfall pipe 001 to the Roanoke River. The plant is permitted to discharge at a rate of 8.34 MGD. The system consists of: bar screen, grit chambers, equalization basin, dual primary clarifiers, dual trickling filters, three aeration basins, dual final clarifiers, hypochlorite disinfection and dichlorination system, dual secondary sludge thickeners, three aerobic digesters, sludge storage tanks, and sludge drying beds. 3. For the review period January 2022 – January 2024, one violation was found for monitoring frequency for Ammonia. No civil penalty assessment was issued for this violation. Findings during the inspection were: 4. The operator’s log and supporting analytical documentation were consistent and up to date. 5. DMR reports from June 2023, and February 2023 were brought to be compared to laboratory analytical results. No discrepancies were found. 6. The facility contains two back-up power generators not covered in the permit. The plant can run on one of the generators and the other one is a backup. At time the time of the inspection one of the generators was down for repairs. The generators are tested monthly. 7. At the time of the inspection, two aeration basins, one primary clarifier, and one secondary clarifier were not in use due to low flow. 8. An effluent pump station is present that is not covered by the permit. Plant staff indicated that the pump station is only used if the river level is too high for normal plant discharge. 9. EQ basin on site is only used for emergency storage in high flow events. The EQ basin was empty at the time of the inspection. The basin contains dual pumps. 10. At the time of the inspection, the sludge blanket in one of the dual primary clarifiers was more than ¼ of the sidewall depth. Plant staff indicated that sludge from the primary clarifiers is pumped to the anerobic digesters three times a day. The high levels are only temporary until pumped. The plant also typically only uses one of the dual primary clarifiers at a time due to low flow. Plant staff indicated that the clarifier used switches monthly. 11. Dissolved oxygen levels in the aeration basin were at 0.56 mg/l. The low levels were explained by plant staff to be necessary to prevent over nitrification. This would lead to excess solids leaving the plant. Dissolved oxygen levels are typically higher around 1mg/l. 12. The effluent sampler is located after the dual secondary clarifiers but prior to disinfection. The plant was told to do this in correspondence with DEQ in 1993. The correspondence letter which was shown to the inspector during the inspection indicated that this would be the most accurate sampling location given the plant’s design. 13. The right of way to Outfall 001 was well maintained. No evidence of solids or visible environmental impacts were noted downstream of the effluent pipe. DocuSign Envelope ID: E3F4A767-CE57-4DFF-955B-CA038DB318F0 Page 3 of 3 Roanoke River WWTP Compliance Inspection 2024 3 If you have questions or comments about the inspection, this report or the requirements to take corrective action (if applicable), please contact Kevin Fowler at 919-437-0047 or via email at kevin.fowler@deq.nc.gov Sincerely, Vanessa Manuel Water Quality Regional Assistant Supervisor Raleigh Regional Office Attachments: EPA Water Compliance Inspection Report Cc: Laserfische Steven Lee Ellis (ORC) DocuSign Envelope ID: E3F4A767-CE57-4DFF-955B-CA038DB318F0 EPA United States Environmental Protection Agency Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 N 52 NC0024201 24/02/28 C S31112171819 20 21 66 Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved------------------- N67707172 73 74 75 80 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Roanoke River WWTP 135 Aqueduct Rd Weldon NC 27890 Entry Time/Date Permit Effective Date Exit Time/Date Permit Expiration Date 10:00AM 24/02/28 23/04/01 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Other Facility Data 01:45PM 24/02/28 28/03/31 Name, Address of Responsible Official/Title/Phone and Fax Number Steven L Ellis,PO Box 308 Ronok Rpd Afs NC 27870//252-536-4884/2525364885 Contacted No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenance Records/Reports Self-Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date Kevin Fowler DWR/RRO WQ/919-791-4200/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page#1 03/01/2024 DocuSign Envelope ID: E3F4A767-CE57-4DFF-955B-CA038DB318F0 3/1/2024 NPDES yr/mo/day 24/02/28 Inspection Type C3111218 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Lab appeared to be in compliance at time of inspection. Enforcment and violation history was very good. NC0024201 17 Page#2 DocuSign Envelope ID: E3F4A767-CE57-4DFF-955B-CA038DB318F0 Permit:NC0024201 Inspection Date:02/28/2024 Owner - Facility: Inspection Type: Roanoke River WWTP Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Permit Expires March 31st, 2028.Comment: Record Keeping Yes No NA NE Are records kept and maintained as required by the permit? Is all required information readily available, complete and current? Are all records maintained for 3 years (lab. reg. required 5 years)? Are analytical results consistent with data reported on DMRs? Is the chain-of-custody complete? Dates, times and location of sampling Name of individual performing the sampling Results of analysis and calibration Dates of analysis Name of person performing analyses Transported COCs Are DMRs complete: do they include all permit parameters? Has the facility submitted its annual compliance report to users and DWQ? (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? Is the ORC visitation log available and current? Is the ORC certified at grade equal to or higher than the facility classification? Is the backup operator certified at one grade less or greater than the facility classification? Is a copy of the current NPDES permit available on site? Facility has copy of previous year's Annual Report on file for review? Comment: Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? Page#3 DocuSign Envelope ID: E3F4A767-CE57-4DFF-955B-CA038DB318F0 Permit:NC0024201 Inspection Date:02/28/2024 Owner - Facility: Inspection Type: Roanoke River WWTP Compliance Evaluation Operations & Maintenance Yes No NA NE Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Bar Screens Yes No NA NE Type of bar screen a.Manual b.Mechanical Are the bars adequately screening debris? Is the screen free of excessive debris? Is disposal of screening in compliance? Is the unit in good condition? Comment: Grit Removal Yes No NA NE Type of grit removal a.Manual b.Mechanical Is the grit free of excessive organic matter? Is the grit free of excessive odor? # Is disposal of grit in compliance? Plant has 2 different methods of grit removal. (Cyclone and Detritor)Comment: Equalization Basins Yes No NA NE Is the basin aerated? Is the basin free of bypass lines or structures to the natural environment? Is the basin free of excessive grease? Are all pumps present? Are all pumps operable? Are float controls operable? Are audible and visual alarms operable? # Is basin size/volume adequate? Page#4 DocuSign Envelope ID: E3F4A767-CE57-4DFF-955B-CA038DB318F0 Permit:NC0024201 Inspection Date:02/28/2024 Owner - Facility: Inspection Type: Roanoke River WWTP Compliance Evaluation Equalization Basins Yes No NA NE Rarely used. Only used in times of high flow as means of temporary storage. Empty at time of inspection. Comment: Primary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Is the site free of excessive floating sludge? Is the drive unit operational? Is the sludge blanket level acceptable? Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth) Sludge blanket was 4' in a 14' high clarifier. However, plant has 2 clarifiers that can be used. Plant also pumps sludge to digesters 3 times a day which lowers the blanket level. Comment: Trickling Filter Yes No NA NE Is the filter free of ponding? Is the filter free of leaks at the center column of filter’s distribution arms? Is the distribution of flow even from the distribution arms? Is the filter free of uneven or discolored growth? Is the filter free of sloughing of excessive growth? Are the filter’s distribution arms orifices free of clogging? Is the filter free of excessive filter flies, worms or snails? 2 Trickling Filters Present.Comment: Secondary Clarifier Yes No NA NE Is the clarifier free of black and odorous wastewater? Is the site free of excessive buildup of solids in center well of circular clarifier? Are weirs level? Is the site free of weir blockage? Is the site free of evidence of short-circuiting? Is scum removal adequate? Page#5 DocuSign Envelope ID: E3F4A767-CE57-4DFF-955B-CA038DB318F0 Permit:NC0024201 Inspection Date:02/28/2024 Owner - Facility: Inspection Type: Roanoke River WWTP Compliance Evaluation Secondary Clarifier Yes No NA NE Is the site free of excessive floating sludge? Is the drive unit operational? Is the return rate acceptable (low turbulence)? Is the overflow clear of excessive solids/pin floc? Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth) Plant contains 2 secondary clarifiers. Only one in use due to flow. Clarifiers are rectangular in shape. Comment: Aeration Basins Yes No NA NE Mode of operation Ext. Air Type of aeration system Diffused Is the basin free of dead spots? Are surface aerators and mixers operational? Are the diffusers operational? Is the foam the proper color for the treatment process? Does the foam cover less than 25% of the basin’s surface? Is the DO level acceptable? Is the DO level acceptable?(1.0 to 3.0 mg/l) 4 Blowers Present. Only 1 or 2 needed to run process. DO level at time of inspection was 0.56 mg/l. Plant staff indicated that the plant works best when ran at a lower DO. DO is typically around 1mg/l. Comment: Pumps-RAS-WAS Yes No NA NE Are pumps in place? Are pumps operational? Are there adequate spare parts and supplies on site? Comment: Chemical Feed Yes No NA NE Is containment adequate? Is storage adequate? Are backup pumps available? Is the site free of excessive leaking? Comment: Page#6 DocuSign Envelope ID: E3F4A767-CE57-4DFF-955B-CA038DB318F0 Permit:NC0024201 Inspection Date:02/28/2024 Owner - Facility: Inspection Type: Roanoke River WWTP Compliance Evaluation Chemical Feed Yes No NA NE Disinfection-Liquid Yes No NA NE Is there adequate reserve supply of disinfectant? (Sodium Hypochlorite) Is pump feed system operational? Is bulk storage tank containment area adequate? (free of leaks/open drains) Is the level of chlorine residual acceptable? Is the contact chamber free of growth, or sludge buildup? Is there chlorine residual prior to de-chlorination? Duck weed growing in contact chamberComment: De-chlorination Yes No NA NE Type of system ?Liquid Is the feed ratio proportional to chlorine amount (1 to 1)? Is storage appropriate for cylinders? # Is de-chlorination substance stored away from chlorine containers? Are the tablets the proper size and type? Sodium BisulfiteComment: Are tablet de-chlorinators operational? Number of tubes in use? Comment: Anaerobic Digester Yes No NA NE Type of operation:Floating cover Is the capacity adequate? # Is gas stored on site? Is the digester(s) free of tilting covers? Is the gas burner operational? Is the digester heated? Is the temperature maintained constantly? Is tankage available for properly waste sludge? 3 Digesters Present. (2 are heated) Gas is used to heat 2 of the digesters.Comment: Page#7 DocuSign Envelope ID: E3F4A767-CE57-4DFF-955B-CA038DB318F0 Permit:NC0024201 Inspection Date:02/28/2024 Owner - Facility: Inspection Type: Roanoke River WWTP Compliance Evaluation Drying Beds Yes No NA NE Is there adequate drying bed space? Is the sludge distribution on drying beds appropriate? Are the drying beds free of vegetation? # Is the site free of dry sludge remaining in beds? Is the site free of stockpiled sludge? Is the filtrate from sludge drying beds returned to the front of the plant? # Is the sludge disposed of through county landfill? # Is the sludge land applied? (Vacuum filters) Is polymer mixing adequate? Drying beds not used except in extreme circumstance.Comment: Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Comment: Effluent Sampling Yes No NA NE Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected? Is the tubing clean? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Sampling takes place after secondary clarifier. This is because of guidance from DEQ in 1993. Documentation provided at plant to prove this. Comment: Flow Measurement - Effluent Yes No NA NE # Is flow meter used for reporting? Is flow meter calibrated annually? Is the flow meter operational? (If units are separated) Does the chart recorder match the flow meter? Page#8 DocuSign Envelope ID: E3F4A767-CE57-4DFF-955B-CA038DB318F0 Permit:NC0024201 Inspection Date:02/28/2024 Owner - Facility: Inspection Type: Roanoke River WWTP Compliance Evaluation Flow Measurement - Effluent Yes No NA NE Comment: Upstream / Downstream Sampling Yes No NA NE Is the facility sampling performed as required by the permit (frequency, sampling type, and sampling location)? Comment: Solids Handling Equipment Yes No NA NE Is the equipment operational? Is the chemical feed equipment operational? Is storage adequate? Is the site free of high level of solids in filtrate from filter presses or vacuum filters? Is the site free of sludge buildup on belts and/or rollers of filter press? Is the site free of excessive moisture in belt filter press sludge cake? The facility has an approved sludge management plan? Granville Farm Contract.Comment: Pump Station - Effluent Yes No NA NE Is the pump wet well free of bypass lines or structures? Are all pumps present? Are all pumps operable? Are float controls operable? Is SCADA telemetry available and operational? Is audible and visual alarm available and operational? Only used if river level is to high.Comment: Standby Power Yes No NA NE Is automatically activated standby power available? Is the generator tested by interrupting primary power source? Is the generator tested under load? Was generator tested & operational during the inspection? Do the generator(s) have adequate capacity to operate the entire wastewater site? Is there an emergency agreement with a fuel vendor for extended run on back-up power? Page#9 DocuSign Envelope ID: E3F4A767-CE57-4DFF-955B-CA038DB318F0 Permit:NC0024201 Inspection Date:02/28/2024 Owner - Facility: Inspection Type: Roanoke River WWTP Compliance Evaluation Standby Power Yes No NA NE Is the generator fuel level monitored? Diesel fuel supplied by Dixie Oil Company. Generators are ran monthly.Comment: Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory? Are all other parameters(excluding field parameters) performed by a certified lab? # Is the facility using a contract lab? # Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees Celsius)? Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees? Most anlysis handled in house (lab #70). Metals, toxcicity, and nirite/nitrate are handled by meritech (lab #165) Comment: Page#10 DocuSign Envelope ID: E3F4A767-CE57-4DFF-955B-CA038DB318F0