Loading...
HomeMy WebLinkAboutNCG140099 DMR WWrig — te PROCESS WASTEWATER — Quarterly Discharge Monitoring Report 0 Copy -State GENERAL PERMIT NO. NCG140000 0 Copy — Plant 0 Copy - File CERTIFICATE OF COVERAGE NO. NCG14 0 0 9 9 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Chandler Concrete Company - Sparta #505 SAMPLE QUARTER: ❑Jul -Sept ❑Oct -Dec ❑Jan -March ®April -June PERSON COLLECTING SAMPLES: COUNTY: Ashe CERTIFIED LABORATORY:Blue Ridge Labs Inc. Lab #275 LIMIT VIOLATIONS? YES [:]NO TSS Exceedance — bank erosion from neighboring property crossing property, heavy rains. Evaluating options. Part A: Wastewater Monitoring Requirements PHONE NO. (L36) 982 - 8760 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: C OPTIONAL INFO: Date Sample 1 Outfall No. Collected (mm/dd/yr) Type of Wastewater Z RMMD) (VE, , Total Suspended pH Solids (standard) (mg/L) Settleable Solids (mL/L) TPH usingDischarge method 1664A SGT -HE (mg/L ) Total Flow Duration 7 (minutes) (gallons/day) - - - 6-93A 303,5 53 (15)6 - - 1 APR - NO FLOW VE RM MD N/A 1 MAY - NO FLOW VE RM MD N/A 1 JUN - NO FLOW VE RM MD N/A JUL .3 1 IU13 CEN No Qualifying Discharge observed this Period - DWR SECTION 1 If wastewater systems have not discharged in this quarter — report "No Flow" or "No Discharge" here. Please make sure to mark the sample quarter above. Z Report the abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning (VE), Raw Material Stockpiles (RM), Mixing Drum Cleanout (MD). Report more than one type if the waste -stream is commingled. 3 I an effluent limit is exceeded twice in a row, the permittee is required to institute monthly monitoring for that parameter for six months, unless DWQ RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwaters. 5 TSS limits are 20 mg/L for wastewater discharges to HQW waters, 10 mg/L for Trout and PNA waters, and 30 mg/L for all other water classifications. 6 Process wastewater discharges shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HQW waters shall be set to 50% of the Summer 7Q10 Flow as per 15A NCAC 02B .0224. Permittees who discharge wastewater to HQW waters shall obtain a Summer 7Q10 flow and report this information to DWQ. If the permittee cannot obtain a Summer 7Q10 flow for the receiving waters at the discharge location, the permittee shall notify DWQ, and the DWQ Regional Office may require an annual flow report on a case-by-case basis. Permit Date: 7/1/2010-06/30/2016 Last Revised 07/13/11 Page 1 of 2 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW". "NO DISCHARGE") WITHIN 30 DAYS OF RECEIPT OF SAMPLE (OR At END OF MONITORING PERIOD IN CASE OF "NO FLOW") TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6379 Sediment basins were cleared and erosion from adjacent property controlled using hay bales — P of 3 monthly samples within specifications for TSS. We continue to monitor controls. No qualifying discharge in: • JANUARY 2015 / FEBRUARY 2015 / MARCH 2015 • APRIL 2015 / MAY 2015 / JUNE 2015 Monthly monitoring could not be performed during this period due to no discharge. We will continue to monitor and submit reports in the event of a qualifying discharge. YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significagt penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." �/ / / / re /z,r Zf ( te) Permit Date: 7/1/2010-06/30/2016 Last Revised 07/13/11 Page 2 of 2