Loading...
HomeMy WebLinkAboutNC0065242_Correspondence_20240228TOWN OF G ROVER 207 Mulberry Road PO Box 189 Grover, North Carolina 28073 704-937-9986 Fax 704-937-9377 February 28, 2024 North Carolina Department of Environmental Quality Division of Water Resources Attn: Sara Bassett 1617 Mail Service Center Raleigh, North Carolina 27699 RE: Permit NCO065242 The Town of Grover is currently in a wastewater regionalization project with the City of Kings Mountain. This project will include upgrades to the Towns current lift stations, decommissioning our current WWTP, constructing a new lift station at the location of the current WWTP and pumping the Town wastewater to the City of Kings Mountain. At this time, both of the Towns current lift stations have been upgraded and are currently awaiting start up of the back up pumps to complete close out of that portion of the project. Construction of the new lift station at the site of the current WWTP is scheduled to begin in March 2024 with an anticipated completion date of October 2024. A force -main connecting to the City of Kings Mountains wastewater system will also be constructed during this phase of the project. Once this phase of the project is complete, the decommissioning of the Grover WWTP will begin and at that time the discharge permit NCO065242 will no longer be needed for operation. This project is being managed by Metcon, Inc. with Vaibhav Mulay serving as the project manager. Sincerely, Tony Willis, Mayor Town of Grover, NC.