Loading...
HomeMy WebLinkAboutNCG140082 DMR SWSTORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 0 0 8 2 FACILITY NAME: Chandler Concrete Co. — Greensboro Pit 102 PERSON COLLECTING SAMPLES: Brian Marsh RECEIVED CERTIFIED LABORATORY:Pace Analytical Lab #633 OPTIONAL INFO: JUL 31 2015 CENTRAL FILES Part A: Stormwater Monitoring Requirements DWR SECTION SAMPLE COLLECTION YEAR:2014-2015 SAMPLING PERIOD: ❑ July -December COUNTY Guilford FORM ,0"" Orig -State 0 Copy - State 0 Copy - Plant 0 Copy - File ® January -June PHONE NO. ( 336) 297 -1179 ADD TO LISTSERVE? []YES [-]NO EMAIL: _ DISCHARGING TO CLASS: ❑SA ❑HQW ®PNA ❑Trout ®Other: WS-IV.zm. NSW Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW) pH (Standard Units) TSS (mg/L) Event Duration (minutes) ) Total 4 Rainfall (in) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 - - 6-92 1002' 1 No Flow _ - _ N N/A No Discharge Observed during this period If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each nutfall here. Please maks dire to mark tha camnla narinrl nhn„o 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. "For each sampled measurable storm event the total precipitation must be recorded using data from an on-site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method Total Suspended 1664A SGT -HEM Solids (mg/L) (mg/L) Event Total a Duration Rainfall (minutes) (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (y/n) # of Months in Tier 2 Sampling2 6-92 15 1002' - - - - - N/A* *Vehicle Maintenance Not Performed at this Location HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified per onnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons i:flrutVjksp01RsibIe for athering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am awar th r gn' cant naltie for submitting false information, including the possibility of fines and imprisonment for knowing violations." 7 (Signature of Permittee) (ate) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2