HomeMy WebLinkAboutNCG140101 DMR SWSTORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO. NCG14 0 10 1 SAMPLE COLLECTION YEAR:2014-2015
FACILITY NAME: Chandler Concrete Company - Boone Plant 501 SAMPLING PERIOD: ❑ July -December ® January -June
PERSON COLLECTING SAMPLES: Randy Carroll � � � COUNTY 87a
CERTIFIED LABORATORY:Blue Mize Labs Inc. Lab # 7 PHONE N0O.. ( (828) 355 - 4180
Lab # JUL 31 2015 ADD TO LISTSERVE? ❑YES ®NO EMAIL: _
OPTIONAL INFO: DISCHARGING TO CLASS: [:]SA❑HQW ❑PNA [:]Trout [:]Other
A: Stormwater MonitoringRequirements CENTRAL FILES
q Il1hIR qi=C:TInN
Outfall No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)1
pH
(Standard
Units)
TSS
(mg/L)
Event
Duration
(minutes)
Total
Rainfall°
(in)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months in Tier
2 SamplingZ
-
-
6-9
100 ,
-
-
-
-
1
NO FLOW
-
-
-
-
N
N/A
No Qualifying
discharge during
the period. -
1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above.
2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General P
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/l, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I.
° For each sampled measurable storm event the total precipitation must be recorded using data from an on-site rain gauge.
Permit Date: 7/l/2011-60/30/2015
ermit. Tier 2
Original - State
❑ Copy - State
❑ Copy - Plant
❑ Copy - File
Last Revised 7/13/11
Page 1 of 2
Part B: Vehicle Maintenance Activitv Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year.
Outfall
No.
Date Sample
Collected1
(mo/dd/yr)
PH
(Standard
Units)
TPH using method
1664A SGT -HEM
(mg/L)
Total Suspended
Solids
(mg/L)
Event
Duration
(minutes)
Total
a
Rainfall
(in)
New Motor Oil
Usage
(gal/month)
In Tier 2
Monthly
Monitoring?
(y/n)
# of Months
in Tier 2
Sampling2
6-92
152
23
100 '
-
-
-
-
-
1
-NO FLOW
N
N/A
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO
HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period
in case of "No Flow") to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons direct espons'bl for thering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete
am aware th are ' ifi alties for submitting false information, including the possibility of fi es a imprisonment for knowing violations."
r1
(Signa ure o ermittee) (D e)
Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2