Loading...
HomeMy WebLinkAboutNCG140100 DMR SWSTORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG14 010 0 SAMPLE COLLECTION YEAR:2014-2015 FACILITY NAME: Chandler Concrete Company - Blowing Rock 502 SAMPLING PERIOD: ❑ July -December ® January -June PERSON COLLECTING SAMPLES: Sam Thompson COUNTY O. (g2a 828' CERTIFIED LABORATORY:BIue Ridge Labs Inc. Lab #275 PHONE NOO. () 264 - 2901 Lab # ADD TO LISTSERVE? []YES ®NO EMAIL: _ OPTIONAL INFO: DISCHARGING TO CLASS: ❑❑❑ SA HQW PNA ®Trout ®Other: WS -IV Part A: Stormwater Monitoring Requirements Outfall No. Date Sample Collected (mo/dd/yr OR NO FLOW)1 pH (Standard Units) Event TSS Duration (mg/L) (minutes) In Tier 2 Total a Monthly Rainfall Monitoring? (in) (y/n) # of Months in Tier 2 2 Sampling - - 6-9 100 , - - - - 1 NO FLOW Y 12+ CENTRAL F LES 1 If "NO FLOW" or "NO DISCHARGE, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. Original - State For each sampled measurable storm event the total precipitation must be recorded using data from an on-site rain gauge. ❑ Copy - State ❑ Copy - Plant ❑ Copy - File Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month — averaged over a calendar year. Outfall No. Date Sample Collected 1 (mo/dd/yr) pH (Standard Units) TPH using method 1664A SGT -HEM (mg/L) Total Suspended Solids (mg/L) Event Duration (minutes) Total , Rainfall (in) New Motor Oil Usage (gal/month) In Tier 2 Monthly Monitoring? (Y/n) # of Months in Tier 2 Sampling2 6-9Z 15 100 , - - - - NOT APPLICABLE HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified perso nel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directiy r onsible for gat ring the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that the r signi pen7--f, s or submitting false information, including the possibility of ines d imprisonment for knowing violations." zzZ fI f (Sign ture of Permittee) ( te) Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2