Loading...
HomeMy WebLinkAboutNCC240613_ESC Approval Submitted_20240304 c-77\ EROSION CONTROL FINANCIAL RESPONSIBILITY FORM3/367/ S col q No person may initiate any land-disturbing activity as defined in Chapter 159 of the Town of Waxhaw Town Code prior to completion of this form, and an applicable and acceptable erosion ' and sedimentation control plan has been approved by the Development Services Department. (Please type or print) Part I Name of Project: 300 N. Broad Address where land disturbing activity will take place: Parcel 05113019 NE of Broad & Price St. Intersection Approximate date disturbing activity will commence: Purpose of development(residential,commercial,industrial,etc.): Residential Total acreage of land to be disturbed or uncovered: 1.97 Amount of fee enclosed(show calculation): TOTAL = $660 $500(FLAT)+$100 (PER ADD'T ACRE)+(10%TECH FEE) Agent to contact should sediment control issues arise during land disturbing activity: Name: Marcus Arroyo Address: 2593 W. Roosevelt Blvd, Suite 201, Monroe State: NC Zip code: 28110 Phone: 704-238-9700 Email: Marcusna typarrealty.com Landowner(s): Name: Historic Ventures, LLC Address: 400 North Broome St. Suite 400. Waxhaw State: NC Zip code:28173 Phone: 704-634-7847 Email: Marcusatyparrealty.com Name: Address: State: Zip code: Phone: Email: Indicate Book and Page where deed of the property where land disturbing activity will take place is recorded: Book: 6380 Page: 734 Book: 6965 Page: 144 1 1• E• IWA ,�,„ EROSION CONTROL FINANCIAL RESPONSIBILITY FORM The above information is true and correct to the best of my knowledge and belief and was provided by me under oath. I agree to provide corrected information should there be any change in the information provided herein. (This form must be signed by the financially responsible person if an individual or his attorney in fact, or if not an individual, by an officer, director, partner, or registered agent with authority to execute instruments for the financially responsible person) Name: Marcus Arroyo Address: 2593 W. Roosevelt Blvd�� 1, Mon State: NC Zip code28110 Phone: 704-238-9700 Email: Marcus@typarrealty.corn I, T)8men;ca A.4. aan.G.u.t , a Notary Public of Meek-ie_nburci County, North Carolina, do hereby certify that /1/ta rG.ts #troyo personally ap a red before me this day, and being duly sworn, stated that in his presence 00" '/ihh,,(signed) ( et,utirme the foregoing instrument. i •.O witness m`g. Sind official seal, this the I 1 day of Jul..( , 201"1 . . O : % L m (Officiartealj O gr— Notary 'ublic V. 1.iF> .cor�y. rnt% ' arl��xpires 05/O 5/ , 20Z4 #1°- RGCO' %%' % 3 N OF WA\XIOAW _1 -_,= Est.1889 1,11:1 `bTl;nol��t Marcus Arroyo Historic Ventures LLC 400 North Broome Street Suite 400 Waxhaw,NC 28173 Re: 300 North Broad 1.97 Union County Catawba River Basin Submitted By: Marcus Arroyo Date Received: 12/8/2019 Plan Type: Construction Plan Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. The plan has been found to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. Per Section 159.16 (G)of the Town of Waxhaw Erosion and Sedimentation Control Ordinance the plan approval shall expire three(3)years following the date of approval,if no land-disturbing activity has been undertaken, or if no land-disturbing activity has occurred with three (3)years. If, following commencement of a land-disturbing activity pursuant to an approved plan, the Erosion Control Inspector determines that the plan is inadequate to meet the requirements of this ordinance, the Erosion Control Inspector may require any revision of the plan that is necessary to comply with this ordinance. A copy of the approved plan and the Certificate of Plan Approval shall be maintained at the job site by the persons conducting the land-disturbing activity. Per Section 159.18(A)the Erosion Control Inspector will periodically inspect land-disturbing activities to ensure compliance with the Act, this ordinance, or rules or orders adopted or issued pursuant to this ordinance, and to determine whether the measures required in the plan are effective in controlling erosion and sediment resulting from land-disturbing activity. The landowner, the financially responsible party, or the landowner's or the financially responsible party's agent shall perform an inspection of the area covered by the plan after each phase of the plan has been completed and after establishment of temporary ground cover. The inspection records shall be kept on site accessible to the Erosion Control Inspector. wAxilibtmeAw/�at Hours:Monday-Friday „ P.704.843.2196 www waxhaw com r w Box 6 el 8:00 a.m.-5:00 pm. F.704.843.2195 1z P.O..O. North Broome St Waxhaw,NC 28173 1 {,18S9 Iv OF \WAXII-IIAW ���/,,\` Est.1889 gQ�fi V�7Y,NO1 C Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You requested to file an amended form if there is any change in the information included on the form. Finally, please notify this office of the proposed starting date for this project and of any planned preconstruction conference. Please be aware that your project is no longer covered by the NPDES General Stormwater Permit NCGO1000 automatically with the approval of the erosion and sedimentation control plan. This coverage can be obtained after receiving the erosion and sedimentation control plan approval by completing an e-NOI available at deq.nc.gov/NCG01. Your cooperation is greatly appreciated and I look forward to working with you during the development of this project. Thank you, Ck top etc /Zic.m Christopher Rice Sedimentation and Erosion Control Inspector Enclosure: Certificate of Approval wA x Ain" Hours:Monday-Friday , P.704.843.2195 www waxhaw.com ea P11O50 North Broome St Vi 8:00 a.m.—5:00 p.m. F.704.843.2196 Waxhaw,NC 28173 i$4.N Fact Sheet on the New NCG01 Permit DEQ,) April 2019 The NC Construction General Permit(also known as"NCG01")was renewed on April 1,2019.The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit as described below. Most notably,there is a new process in which construction sites will obtain official coverage under an NCG01 permit through an electronic process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions, contact Annette Lucas at Annette.lucas@ncdenr.gov or(919)707-3639. Organizational Updates Acronyms to Know The new permit: COC: Certificate of Coverage, proof of coverage under an NCG01 permit • Repeats state requirements for E&SC DEMLR: NC Division of Energy, Mineral, and Land Resources Plans and organizes them with federal E&SC: Erosion &Sedimentation Control construction activity requirements; e-NOI: Notice of Intent,application form for the NCG01 permit • Is clearly organized by topic;and e-NOT: Notice of Termination,form for closing out the NCGO1 permit • Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan, required by the NCGO1 Technical Updates The new permit: • Requires that the E&SC Plan meet SWPPP requirements (p. 2); • Provides a list of items that must be included in the SWPPP,such as the construction sequence, plans, calculations,etc. (p. 2-4);1 • Has updated language on bypasses and upsets that is tailored to construction activities(p. 10); MIL- Alit • Puts all timeframes for inspections, record-keeping and reporting in The NCG01 Process "calendar days" for clarity and The new NCGO1 applies to permits approved on or after April 1,2019. consistency(p. 11 14);z Permittees will no longer receive a copy of the NCG01 permit in the mail • Changes the inspection frequency with their E&SC Plan approvals and be considered as covered under the (during business hours)to at least permit. Federal rules require that DEMLR receive an NOI on each once per 7 calendar days and after construction project and issue each construction project its own COC. every storm > 1.0 inch (previously 0.5 inch);3 and Under the new NCG01 process,construction sites will continue to • Excludes weekends,state and federal receive approval for E&SC Plans from either DEMLR or the delegated holidays from normal business hours local E&SC program just like before.After receiving E&SC Plan approval, unless construction activities take permittees will officially obtain coverage under the NCGO1 by place (p. 23). completing an e-NOI (available at deci.nc.gov/NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. 1 This list is based on website guidance by the DEMLR Sediment Program. Initially,there will be no charge associated with applying for an NCG01 2 The number of calendar days was permit but on or around June 1, 2019, DEMLR will begin charging a $100 selected to be as equivalent as annual general permit fee as required per§143-215.3D. possible with the previous permit. DEMLR is working on creating a single application form that will allow an 3 The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCG01 to the inspection schedule. COC.That effort is part of a larger Permit Transformation project at DEMLR. Q&A About the New NCG01 Permit Why do construction sites have to do this extra application step? How does the new NCG01 affect the DEMLR is required by the EPA to issue a specific COC to every construction delegated local E&SC Programs? site that disturbs one acre or more. DEMLR is working to create a form Local programs will continue to review that combines the E&SC plan approval and e-NOI processes, but that will and approve E&SC plans. However, take more time. For now, DEMLR has created an efficient e-NOI process. they will no longer send copies of the NCG01 with E&SC Plan approvals. If an E&SC Plan is approved before April 1,which permit applies? DEMLR will provide sample language to Projects with already approved E&SC Plans will automatically follow the use in local E&SC Plan approvals to new NCG01 permit, but will not need to fill out an e-NOI or pay an annual advise permittees that they must permit fee. However,the permittees should print the new permit and the submit an e-NOI to DEMLR. two standard detail sheets and have them on site. Will DEMLR offer tools to help permittees comply with the new NCG01? 9 Yes, DEMLR will provide two sample plan sheets at deq.nc.gov/NCG01 that can be placed into the E&SC plan set.The first covers the site stabilization and materials handling p ortions of the permit. The second sheet covers "itia the inspection, record-keeping and reporting portions of the permit. " . ;.'` ' 40 = How will the new e-NOI submittal and COC process work? Permittees will apply for E&SC Plan approvals from DEMLR or the local E&SC program like before.The E&SC approval letter will instruct the permittee to visit deq.nc.gov/NCG01 to submit an e-NOI form to DEMLR. Local programs are not required to The permittee may begin the construction activity after receipt of the COC check if permittees have submitted e- (within three days*).The permittee must print and retain a copy of the NOIs to DEMLR. However,if they wish permit and the COC on site. Initially,the COC will be issued for free but on to do this voluntarily,there will be a or around June 1, 2019,a $100 annual general permit fee will be charged. tool available on DEMLR's web site for them to view a list of construction Who is allowed to submit an e-NOI form? projects that have submitted e-NOls. Submittal must be by a responsible corporate officer that owns or operates the activity,such as a president, secretary,treasurer,or vice When local programs close out an E&SC president or a manager that is authorized in accordance with IV.B.6 of the Plan,the close-out letter will advise NCG01 permit. Additional signatory options are set forth in IV.B.6 of the permittees that they must submit an e permit. It is possible for consultant to prepare the e-NOI, save it as a draft, NOT. DEMLR will provide sample and email it to the responsible entity for signature &submittal. language. Local programs may approve E&SC What happens to the COC when the construction activity is complete? plans that meet state sediment laws When a project is complete,the permittees will contact DEMLR or the local and rules even if those plans are not delegated program to close out the E&SC Plan. After DEMLR or the local compliant with all of the NCG01 E&SC program inform the permittee of the project close out via inspection requirements. However,their report,the permittee will visit deq.nc.gov/NCG01 to submit an e-NOT. permittees will be required to add two plan sheets(which will be provided by Will there be a grace period for adherence to the new process? DEMLR)to their E&SC Plans to ensure DEMLR does not have the authority to grant a grace period from a that they fully comply with the ground federally mandated permit. Permittees will be informed of the new stabilization, materials handling, and process via web site, E&SC Plan approval letters and list servs. If a inspection, record-keeping and construction activity disturbs one acre or more(or is part of common plan reporting portion of the NCGO1andpermit. of development that disturbs one acre or more)fails to submit an e-NOI after approval of its E&SC Plan,this is a violation of federal permitting * Or 24 business hours for a project requirements and the permittee could be subject to a penalty assessment. approved under the DEMLR Express review program.