EROSION CONTROL FINANCIAL RESPONSIBILITY FORM3/367/
S
col q
No person may initiate any land-disturbing activity as defined in Chapter 159 of the Town of
Waxhaw Town Code prior to completion of this form, and an applicable and acceptable erosion '
and sedimentation control plan has been approved by the Development Services Department.
(Please type or print)
Part I
Name of Project: 300 N. Broad
Address where land disturbing activity will take place: Parcel 05113019 NE of
Broad & Price St.
Intersection
Approximate date disturbing activity will commence:
Purpose of development(residential,commercial,industrial,etc.): Residential
Total acreage of land to be disturbed or uncovered: 1.97
Amount of fee enclosed(show calculation): TOTAL = $660
$500(FLAT)+$100 (PER ADD'T
ACRE)+(10%TECH FEE)
Agent to contact should sediment control issues arise during land disturbing activity:
Name: Marcus Arroyo
Address: 2593 W. Roosevelt Blvd, Suite 201, Monroe
State: NC Zip code: 28110
Phone: 704-238-9700 Email: Marcusna typarrealty.com
Landowner(s):
Name: Historic Ventures, LLC
Address: 400 North Broome St. Suite 400. Waxhaw
State: NC Zip code:28173
Phone: 704-634-7847 Email: Marcusatyparrealty.com
Name:
Address:
State: Zip code:
Phone: Email:
Indicate Book and Page where deed of the property where land disturbing activity will take place
is recorded:
Book: 6380 Page: 734
Book: 6965 Page: 144
1
1• E•
IWA ,�,„ EROSION CONTROL FINANCIAL RESPONSIBILITY FORM
The above information is true and correct to the best of my knowledge and belief and was
provided by me under oath. I agree to provide corrected information should there be any
change in the information provided herein. (This form must be signed by the financially
responsible person if an individual or his attorney in fact, or if not an individual, by an
officer, director, partner, or registered agent with authority to execute instruments for the
financially responsible person)
Name: Marcus Arroyo
Address: 2593 W. Roosevelt Blvd�� 1, Mon
State: NC Zip code28110
Phone: 704-238-9700 Email: Marcus@typarrealty.corn
I, T)8men;ca A.4. aan.G.u.t , a Notary Public of Meek-ie_nburci
County, North Carolina, do hereby certify that /1/ta rG.ts #troyo personally
ap a red before me this day, and being duly sworn, stated that in his presence
00" '/ihh,,(signed) ( et,utirme the foregoing instrument.
i
•.O witness m`g. Sind official seal, this the I 1 day of Jul..( , 201"1 .
. O : % L
m (Officiartealj O gr—
Notary 'ublic
V.
1.iF> .cor�y. rnt% ' arl��xpires 05/O 5/ , 20Z4
#1°- RGCO' %%' %
3
N OF
WA\XIOAW
_1 -_,= Est.1889
1,11:1
`bTl;nol��t
Marcus Arroyo
Historic Ventures LLC
400 North Broome Street
Suite 400
Waxhaw,NC 28173
Re: 300 North Broad
1.97
Union County
Catawba River Basin
Submitted By: Marcus Arroyo
Date Received: 12/8/2019
Plan Type: Construction Plan
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. The plan has been
found to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of
Approval must be posted at the job site. Per Section 159.16 (G)of the Town of Waxhaw Erosion
and Sedimentation Control Ordinance the plan approval shall expire three(3)years following the
date of approval,if no land-disturbing activity has been undertaken, or if no land-disturbing
activity has occurred with three (3)years. If, following commencement of a land-disturbing
activity pursuant to an approved plan, the Erosion Control Inspector determines that the plan
is inadequate to meet the requirements of this ordinance, the Erosion Control Inspector may
require any revision of the plan that is necessary to comply with this ordinance.
A copy of the approved plan and the Certificate of Plan Approval shall be maintained at the
job site by the persons conducting the land-disturbing activity. Per Section 159.18(A)the Erosion
Control Inspector will periodically inspect land-disturbing activities to ensure compliance with
the Act, this ordinance, or rules or orders adopted or issued pursuant to this ordinance, and to
determine whether the measures required in the plan are effective in controlling erosion and
sediment resulting from land-disturbing activity. The landowner, the financially responsible
party, or the landowner's or the financially responsible party's agent shall perform an inspection
of the area covered by the plan after each phase of the plan has been completed and after
establishment of temporary ground cover. The inspection records shall be kept on site accessible
to the Erosion Control Inspector.
wAxilibtmeAw/�at
Hours:Monday-Friday „ P.704.843.2196 www waxhaw com r w Box 6
el 8:00 a.m.-5:00 pm. F.704.843.2195 1z P.O..O. North Broome St
Waxhaw,NC 28173
1 {,18S9
Iv OF
\WAXII-IIAW
���/,,\` Est.1889
gQ�fi
V�7Y,NO1 C
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You requested to file an amended form if
there is any change in the information included on the form. Finally, please notify this office of
the proposed starting date for this project and of any planned preconstruction conference.
Please be aware that your project is no longer covered by the NPDES General Stormwater Permit
NCGO1000 automatically with the approval of the erosion and sedimentation control plan.
This coverage can be obtained after receiving the erosion and sedimentation control plan approval
by completing an e-NOI available at deq.nc.gov/NCG01.
Your cooperation is greatly appreciated and I look forward to working with you during the
development of this project.
Thank you,
Ck top etc /Zic.m
Christopher Rice
Sedimentation and Erosion
Control Inspector
Enclosure: Certificate of Approval
wA x Ain"
Hours:Monday-Friday , P.704.843.2195 www waxhaw.com ea P11O50 North Broome St
Vi 8:00 a.m.—5:00 p.m. F.704.843.2196
Waxhaw,NC 28173
i$4.N
Fact Sheet on the New NCG01 Permit DEQ,)
April 2019
The NC Construction General Permit(also known as"NCG01")was renewed on April 1,2019.The updated permit
does not significantly change the measures that are required to be implemented on construction sites. However,
there are some organizational and technical updates to the permit as described below. Most notably,there is a new
process in which construction sites will obtain official coverage under an NCG01 permit through an electronic
process. DEMLR worked with a broad team of stakeholders to make all of these updates. If you have questions,
contact Annette Lucas at Annette.lucas@ncdenr.gov or(919)707-3639.
Organizational Updates Acronyms to Know
The new permit: COC: Certificate of Coverage, proof of coverage under an NCG01 permit
• Repeats state requirements for E&SC DEMLR: NC Division of Energy, Mineral, and Land Resources
Plans and organizes them with federal E&SC: Erosion &Sedimentation Control
construction activity requirements; e-NOI: Notice of Intent,application form for the NCG01 permit
• Is clearly organized by topic;and e-NOT: Notice of Termination,form for closing out the NCGO1 permit
• Has less text and more tables. SWPPP: Stormwater Pollution Prevention Plan, required by the NCGO1
Technical Updates
The new permit:
• Requires that the E&SC Plan meet
SWPPP requirements (p. 2);
• Provides a list of items that must be
included in the SWPPP,such as the
construction sequence, plans,
calculations,etc. (p. 2-4);1
• Has updated language on bypasses and
upsets that is tailored to construction
activities(p. 10); MIL- Alit
• Puts all timeframes for inspections,
record-keeping and reporting in The NCG01 Process
"calendar days"
for clarity and The new NCGO1 applies to permits approved on or after April 1,2019.
consistency(p. 11 14);z Permittees will no longer receive a copy of the NCG01 permit in the mail
• Changes the inspection frequency with their E&SC Plan approvals and be considered as covered under the
(during business hours)to at least permit. Federal rules require that DEMLR receive an NOI on each
once per 7 calendar days and after construction project and issue each construction project its own COC.
every storm > 1.0 inch (previously 0.5
inch);3 and Under the new NCG01 process,construction sites will continue to
• Excludes weekends,state and federal receive approval for E&SC Plans from either DEMLR or the delegated
holidays from normal business hours local E&SC program just like before.After receiving E&SC Plan approval,
unless construction activities take permittees will officially obtain coverage under the NCGO1 by
place (p. 23). completing an e-NOI (available at deci.nc.gov/NCG01). The e-NOI will
only take about 20 minutes to fill out and submit on-line.
1 This list is based on website guidance
by the DEMLR Sediment Program. Initially,there will be no charge associated with applying for an NCG01
2 The number of calendar days was permit but on or around June 1, 2019, DEMLR will begin charging a $100
selected to be as equivalent as annual general permit fee as required per§143-215.3D.
possible with the previous permit. DEMLR is working on creating a single application form that will allow an
3 The intent is to provide predictability applicant to simultaneously apply for an E&SC permit and an NCG01
to the inspection schedule. COC.That effort is part of a larger Permit Transformation project at
DEMLR.
Q&A About the New NCG01 Permit
Why do construction sites have to do this extra application step? How does the new NCG01 affect the
DEMLR is required by the EPA to issue a specific COC to every construction delegated local E&SC Programs?
site that disturbs one acre or more. DEMLR is working to create a form Local programs will continue to review
that combines the E&SC plan approval and e-NOI processes, but that will and approve E&SC plans. However,
take more time. For now, DEMLR has created an efficient e-NOI process. they will no longer send copies of the
NCG01 with E&SC Plan approvals.
If an E&SC Plan is approved before April 1,which permit applies? DEMLR will provide sample language to
Projects with already approved E&SC Plans will automatically follow the use in local E&SC Plan approvals to
new NCG01 permit, but will not need to fill out an e-NOI or pay an annual advise permittees that they must
permit fee. However,the permittees should print the new permit and the submit an e-NOI to DEMLR.
two standard detail sheets and have them on site.
Will DEMLR offer tools to help permittees comply with the new NCG01? 9
Yes, DEMLR will provide two sample plan sheets at deq.nc.gov/NCG01 that
can be placed into the E&SC plan set.The first covers the site stabilization
and materials handling p
ortions of the permit. The second sheet covers "itia
the inspection, record-keeping and reporting portions of the permit. " . ;.'`
'
40 =
How will the new e-NOI submittal and COC process work?
Permittees will apply for E&SC Plan approvals from DEMLR or the local
E&SC program like before.The E&SC approval letter will instruct the
permittee to visit deq.nc.gov/NCG01 to submit an e-NOI form to DEMLR. Local programs are not required to
The permittee may begin the construction activity after receipt of the COC check if permittees have submitted e-
(within three days*).The permittee must print and retain a copy of the NOIs to DEMLR. However,if they wish
permit and the COC on site. Initially,the COC will be issued for free but on to do this voluntarily,there will be a
or around June 1, 2019,a $100 annual general permit fee will be charged. tool available on DEMLR's web site for
them to view a list of construction
Who is allowed to submit an e-NOI form? projects that have submitted e-NOls.
Submittal must be by a responsible corporate officer that owns or
operates the activity,such as a president, secretary,treasurer,or vice When local programs close out an E&SC
president or a manager that is authorized in accordance with IV.B.6 of the Plan,the close-out letter will advise
NCG01 permit. Additional signatory options are set forth in IV.B.6 of the permittees that they must submit an e
permit. It is possible for consultant to prepare the e-NOI, save it as a draft, NOT. DEMLR will provide sample
and email it to the responsible entity for signature &submittal. language.
Local programs may approve E&SC
What happens to the COC when the construction activity is complete? plans that meet state sediment laws
When a project is complete,the permittees will contact DEMLR or the local and rules even if those plans are not
delegated program to close out the E&SC Plan. After DEMLR or the local compliant with all of the NCG01
E&SC program inform the permittee of the project close out via inspection requirements. However,their
report,the permittee will visit deq.nc.gov/NCG01 to submit an e-NOT. permittees will be required to add two
plan sheets(which will be provided by
Will there be a grace period for adherence to the new process? DEMLR)to their E&SC Plans to ensure
DEMLR does not have the authority to grant a grace period from a that they fully comply with the ground
federally mandated permit. Permittees will be informed of the new stabilization, materials handling, and
process via web site, E&SC Plan approval letters and list servs. If a inspection, record-keeping and
construction activity disturbs one acre or more(or is part of common plan reporting portion of the NCGO1andpermit.
of development that disturbs one acre or more)fails to submit an e-NOI
after approval of its E&SC Plan,this is a violation of federal permitting * Or 24 business hours for a project
requirements and the permittee could be subject to a penalty assessment. approved under the DEMLR Express
review program.