HomeMy WebLinkAboutNCG030039 DMR SW (8)Semi-annual Stormwater Discharige Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
'NC6_6 (O Date submitted 11-7-2014
CERTIFICATE OF COVERAGE NO. NCG030000 SAMPLE COLLECTION YEAR 2014
FACILITY NAME Daimler Trucks North America LLC— Cleveland. NC
PERSON COLLECTING SAMPLES
LABORATORY:
Lab Cert. # -
Comments on sample collection or analysis: No sample collected during
October.
Part A: Stormwater Benchmarks and Monitoring Results
SAMPLE PERIOD ❑ Jan -June ❑ July -Dec
or ® Monthly) October (month)
DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply [:]SA
®Other
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
n No discharae this Deriod?z
Outfall No.
Date Sample
Collected)
(mo/dd/yr)
24-hour rainfallpH,
amount,
Inches3
Total Suspended Solids
Standard units
Copper
Lead
Zinc
Non -Polar O&G/
Total Petroleum
Hydrocarbons
Total Toxic
Organicss
Benchmarks ===>
-
-
100 mg/L or 50 mg/L
6.0-9.0
0.007 mg/L
0.03 mg/L
0.067 mg/L
15 mg/L
1 mg/L
SDO 002
No Flow
No Flow
No Flow
No Flow
No Flow
No Flow
No Flow
No Flow
No Flow
- Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit a Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
1' jCV\C)LQ `
Name (Print name)
I?lav-,�- fV,\av\CLge r
Title (Print title)
(Signature)
(Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3