Loading...
HomeMy WebLinkAboutNCC230917_NOT Closeout Documents_20240228 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville,NC 28115 (704) 663-1699 County: Stanly Project: New Finish,Inc. River basin: Yadkin-PeeDee Person financially responsible:New Finish,Inc.-Stephen N Bradley,President Project#: STANL-2023-015 Address: 8353 US Highway 52 South,Norwood,NC 28128 1. Project Location: US Highway 52 South,Norwood Pictures: No 2. Weather and soil conditions: Sunny,no activity Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: December 11,2023 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required. Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have questions,contact me at Lily.Kay@ncdenr.gov or by phone at(704)235-2137. Reported by: Lily Kay Others present: Date of inspection: November 30,2023 Time arriving on site: 2:15 PM Time leaving site: 2:20 PM CC: