Loading...
HomeMy WebLinkAboutNC0072729_Authorization to Construct_20080626�0F W A7F,q O r O < June 26, 2008 Mr. Philip A. Francis, Jr., Superintendent USDI National Park Service 199 Hemphill Knob Road Asheville, North Carolina 28803 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleco H. Sullins, Director Division of Water Quality SUBJECT: Authorization to Construct A to C No. 072729AOI USDI National Park Service Mount Pisgah WWTP Replacement Haywood County Dear Mr. Francis: A letter of request for Authorization to Construct was received February 25, 2008, by the Division, and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 0.032 MGD Wastewater Treatment Plant, with discharge of treated wastewater into an unnamed tributary to Pisgah Creek in the French Broad River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Replacement of the existing aerated lagoon W WTP with a new 0.032 MGD dual train package W WTP consisting of a manual bar screen; an 8,000 gallon flow equalization basin with three (3) 50 gpm pumps; a dual -train 32,000 gpd W WTP with each train consisting of a 19,000 aeration basin, a 10-foot diameter, 10-foot side -water depth clarifier, a 8,500 gallon aerated sludge holding tank; dual 30 cfirt blowers for the equalization basin, dual 75 cfin blowers for the aeration basins, and three (3) 30 cfin blowers for the aerated sludge holding tank; a rotating cloth filter rated at 32,000 gpd; a UV disinfection system with 2 parallel banks, each rated at 80,000 gpd peak flow; an effluent flow meter, and 4-inch effluent discharge pipe; and associated yard piping, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO072729 issued October 19, 2006, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0072729. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the North Carolina Division of Water Quality. N''o�Itcarolma �vatura!/U North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service Internet: wwvv.newatemualitv.ore 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 1-877-623-6748 An Equal Opportundy/Affirmative Action Employer — 500/6 RecycleN10% Post Consumer Paper Mr. Philip A. Francis, Jr., Superintendent June 26, 2008 Page 2 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Asheville Regional Office, telephone number (828) 296-4500, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: Construction Grants & Loans, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T 15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Mr. Philip A. Francis, Jr., Superintendent June 26, 2008 Page 3 Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Ken Pohlig, P.E. at telephone number (919) 715-6221. Sincerely, rColeen H. Sullins kp cc: Eric F. Davidson, P.E. — HDR Engineering, Inc, Charlotte Haywood County Health Department DWQ, Asheville Regional Office, Surface Water Protection DWQ, Technical Assistance and Certification Unit DWQ, Point Source Branch, NPDES Program Daniel Blaisdell, P.E. Ken Pohlig, P.E. ATC File