HomeMy WebLinkAboutUpper Rocky MY2 Credit Release Schedule_SignedProject Name:
Sponsor Name:
USACE Action ID:
NCDWQ Action ID:
Non‐Forested
Wetland
Credits
Warm
Water
Cool
Water
Cold
Water
Riparian
Riverine
Riparian
Non‐Riverine Non‐Riparian Coastal
9,005 9.07
9,001 9.07
Scheduled
Releases
Warm
Water
Cool
Water
Cold
Water
Scheduled
Releases
Riparian
Riverine
Riparian
Non‐Riverine Non‐Riparian Scheduled
Releases Coastal
1 (Bank/Site Establishment)1, 2 15%1350.75 15% 1.786 15% 11/30/2020 11/27/2020 15% and all 0.50 wetland preservation credits
2 (Year 0/As‐Built)3 15%1349.55 15% 1.286 15% 6/30/2022 7/5/2022
3 (Year 1 Monitoring)10% 900.1 10% 0.857 10%1/30/2023 11/29/2022
4 (Year 2 Monitoring)10% 900.1 10% 0.857 15%1/30/2024
5 (Year 3 Monitoring)10% 900.1 15% 1.286 20%1/30/2025
6 (Year 4 Monitoring)5% 450.05 5% 0.429 10%1/30/2026
7 (Year 5 Monitoring)10% 900.1 15% 1.286 15%1/30/2027
8 (Year 6 Monitoring)5% 450.05 5% 0.429 NA NA 1/30/2028
9 (Year 7 Monitoring)10% 900.1 10% 0.857 NA NA 3/30/2029
Stream Bankfull Standard4 10% 900.10 NA NA NA NA NA NA Varies4
Total Credits Release to Date
Date
Mecklenburg
03040105
2017
11/20/2023
County:
8‐Digit HUC:
Year Project Instituted:
Date Prepared:
Actual Release
Date
Potential Credits from As‐Built Survey
Stream Credits
Credit Classification
Non‐Forested Wetland
CreditsForested Wetland CreditsStream Credits
Current and Future Credit Releases
Credit Release Milestone
Wilmington District Mitigation Bank Credit Release Schedule
4 ‐ A 15% reserve of credits to be held back until the bankfull event performance standard has been met.
1 ‐ The first credit release milestone is based on the potential credits stated in the approved mitigation plan.
2 ‐ The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria:
1) Execution of the MBI or UMBI by the Sponsor and the USACE;
2) Approval of the final Mitigation Plan;
3) Mitigation bank site must be secured;
4) Delivery of the financial assurances described in the Mitigation Plan;
5) Recordation of the long‐term protection mechanism and title opinion acceptable to the USACE;
6) 404 permit verification for construction of the site, if required.
3 ‐ The second credit release is based on the credit totals from the as‐built survey, and may differ slightly from the credit totals stated in the mitigation plan.
Contingencies (if any): None
Signature of Wilmington District Official Approving Credit Release
Upper Rocky
Water & Land Solutions, LLC
SAW‐2015‐01816
2016‐0849
Potential Credits from Mitigation Plan
Forested Wetland Credits
Total Potential Credits
Projected
Release Date
3/4/2024
3/4/2024