Loading...
HomeMy WebLinkAboutUpper Rocky MY2 Credit Release Schedule_SignedProject Name: Sponsor Name: USACE Action ID: NCDWQ Action ID: Non‐Forested  Wetland  Credits Warm  Water Cool  Water Cold  Water Riparian  Riverine Riparian Non‐Riverine Non‐Riparian Coastal 9,005 9.07 9,001 9.07 Scheduled  Releases Warm  Water Cool  Water Cold  Water Scheduled  Releases Riparian  Riverine Riparian Non‐Riverine Non‐Riparian Scheduled  Releases Coastal 1 (Bank/Site Establishment)1, 2 15%1350.75 15% 1.786 15% 11/30/2020 11/27/2020 15% and all 0.50 wetland preservation credits 2 (Year 0/As‐Built)3 15%1349.55 15% 1.286 15% 6/30/2022 7/5/2022 3 (Year 1 Monitoring)10% 900.1 10% 0.857 10%1/30/2023 11/29/2022 4 (Year 2 Monitoring)10% 900.1 10% 0.857 15%1/30/2024 5 (Year 3 Monitoring)10% 900.1 15% 1.286 20%1/30/2025 6 (Year 4 Monitoring)5% 450.05 5% 0.429 10%1/30/2026 7 (Year 5 Monitoring)10% 900.1 15% 1.286 15%1/30/2027 8 (Year 6 Monitoring)5% 450.05 5% 0.429 NA NA 1/30/2028 9 (Year 7 Monitoring)10% 900.1 10% 0.857 NA NA 3/30/2029 Stream Bankfull Standard4 10% 900.10 NA NA NA NA NA NA Varies4 Total Credits Release to Date Date Mecklenburg 03040105 2017 11/20/2023 County: 8‐Digit HUC: Year Project Instituted: Date Prepared: Actual Release  Date Potential Credits from As‐Built Survey Stream Credits Credit Classification Non‐Forested Wetland  CreditsForested Wetland CreditsStream Credits Current and Future Credit Releases Credit Release Milestone Wilmington District Mitigation Bank Credit Release Schedule 4 ‐ A 15% reserve of credits to be held back until the bankfull event performance standard has been met. 1 ‐ The first credit release milestone is based on the potential credits stated in the approved mitigation plan. 2 ‐ The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the MBI or UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Mitigation bank site must be secured; 4) Delivery of the financial assurances described in the Mitigation Plan; 5) Recordation of the long‐term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. 3 ‐ The second credit release is based on the credit totals from the as‐built survey, and may differ slightly from the credit totals stated in the mitigation plan. Contingencies (if any): None Signature of Wilmington District Official Approving Credit Release Upper Rocky Water & Land Solutions, LLC SAW‐2015‐01816 2016‐0849 Potential Credits from Mitigation Plan Forested Wetland Credits Total Potential Credits  Projected  Release Date 3/4/2024 3/4/2024