Loading...
HomeMy WebLinkAboutNCC230309_MODIFICATION Supporting Doc (LOTS 85-97 204-215)_20240229 City of onroe 300 W Crowell Street, Monroe, NC 28112 Engineering monroenc.org • 704-282-4500 • PO Box 69, Monroe, NC 281 1 1 February 21,2024 Cody Cosentino D.R.Horton,Inc. 8025 Arrowridge Blvd. Charlotte,NC 28273 RE: LETTER OF APPROVAL EROSION AND SEDIMENT CONTROL SUBMITTAL Project Name: Secrest Commons Submittal No.:PREN202401648 Disturbed Area:2.66 Acres Location: 1839 Vanderlyn St. Submitted by: Cody Cosentino Date Received:January 10,2024 New Submittal: X Revision: Dear Mr.Cosentino: The City of Monroe Engineering Department has reviewed the subject erosion and sedimentation control plan. The noted plan for Lots 85-97,204-215 has been reviewed and is found to be acceptable;therefore,you are issued this Letter of Approval and Certificate of Plan Approval. Plan approvals shall expire within three (3) years following the date of this approval if no land disturbing activity has been undertaken, as required by the City of Monroe Code of Ordinance Chapter 158.16 (G). The Certificate of Approval, NCGO1 permit, Certificate of Coverage (COC) and record of inspections must be posted at a conspicuous location at the job site. If you proceed prior to approval of all plans you are doing so at your own risk. Please contact the Permit Center to ensure you have all approvals needed to begin. Chapter 158.16(H)of the City Ordinance requires that a copy of the approved erosion control plan be on file at the job site. In addition,the City maintains the right of entry for periodic inspection as indicated in Chapter 158.17(D)of the City Ordinance and by the G.S. I I3A-61.1(a).This letter is due notice of such inspection. As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent(eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the applicable annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form and fee details may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a)and the NCGO1 permit require that the following documentation be kept on file at the job site: 1.The approved E&SC plan as well as any approved deviation. 2.The NCGO1 permit and the COC,once it is received. 3.Records of inspections made during the previous 30 days. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties.If,following the commencement of this project,the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. City of onro e 300 W Crowell Street, Monroe, NC 28112 Engineering monroenc.org • 704-282-4500 • PO Box 69, Monroe, NC 281 1 1 Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations,and rules.In addition,local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. The erosion control permit can be issued prior to an approved Stormwater Management Permit once all erosion control requirements are met. Any changes to the plan during the Stormwater Management and Utility Permit approval process that significantly alters the erosion control plan shall be addressed through a revision submittal. The developer proceeds at their own risk prior to receiving all approvals associated with site development. Please notify us to set up a preconstruction meeting prior to disturbing any land. If a preconstruction is not set up it will be a violation.A copy of an approved Certificate of Coverage(COC)should be provided at this meeting. Sincerely, Tonya Griffm Engineering Associate—Erosion Control cc: Phillip D.Pasbt,Jr.,P.E.,Path Light Pro, 1511 East State Rd 434,Ste.3009,Winter Springs,FL 32708 Cody Cosentino,D.R.Horton,Inc., 160 Mine Lake Ct.,Ste.200,Raleigh,NC 27615-6417:NC SOS registered address Zach Ross,City of Monroe-Erosion Control Inspector,300 West Crowell St.,Monroe,NC 28112 File