HomeMy WebLinkAbout20210754 Ver 3_Task 4 Sassafras Phase II Credit Release Request_20240228 3600 Glenwood Avenue, Suite 100 Raleigh, NC 27612 Corporate Headquarters 6575 West Loop South, Suite 300 Bellaire, TX 77401 Main: 713.520.5400 February 28, 2024 CREDIT RELEASE REQUEST FORM To: NCDEQ-DWR Nutrient Offset Coordinator From: Heath Hidlay, hhidlay@res.us (717-543-7711) Through: Environmental Banc and Exchange, LLC (EBX) We formally request a credit release for the Sassafras Phase II Mitigation Site (DWR Project # 2021- 0754v3) for completion of Task #4: Monitoring Report #1 per the approved credit release schedule, which is included in the Attachments with this request. The following documents have been submitted to DWR for Task #4: 1) Year 1 Monitoring Report 2) Credit Release Schedule (PDF from Approved BPDP, and Excel) and 3) Approved Credit Table (PDF from As-Built) Credits requested for release are detailed below: Credit Type % Release Credit Amount (Include Units) Notes/Comments Generated Nitrogen Nutrient Offset 10 2,812.084 Signature: Heath Hidlay 14 VIII. CREDIT RELEASE SCHEDULE A. In general, upon submittal of all appropriate documentation by the Sponsor, and subsequent approval by DWR, it is agreed that the Riparian Buffer Credits and/or Nutrient Offset Credits associated with the Thunder Swamp Phase II, Sassafras Phase II and Caraway Bluff Phase II Bank Parcels will become available for sale to a third party in accordance with a Credit Release Schedule similar to that provided in Table 3.0 below. B. A Credit Release Schedule specific to each Bank Parcel proposed under this Instrument shall be provided in each BPDP and shall outline project milestones required to be completed for each Task. Credit releases will follow the Credit Release Schedule approved in each BPDP. Table 3.0 - Credit Release Schedule for Riparian Buffer and Nutrient Offset Credits Task Project Milestone % Credit Available for Sale 1 Instrument and BPDP Approved by DWR, applicable DMS Full Delivery Mitigation Plan approved by DWR, Conservation Easement Recorded* and Financial Assurance Posted 15 - 20 2 All Riparian Earthwork & Mitigation Activities, Planting and Installation of Monitoring Devices completed for both the Full Delivery site and the Bank Parcel, easement boundaries adequately marked, all applicable permits obtained. A site visit performed by DWR is required for this task 20 3 Monitoring Financial Assurance Posted and Approval of As-Built Report 10 4 Monitoring Report #1: Approved by the DWR** & Financial Assurance Posted 5-10 5 If Item L of Section V applies, then no remaining credits will be released until Item B (1) of Section X in this Instrument has been completed and approved by DWR 0-10 5 or 6 Monitoring Report #2: Approved by the DWR** & Financial Assurance Posted 5-10 6 Monitoring Report #3: Approved by the DWR** & Financial Assurance Posted 10 7 Item B (1) of Section X in this Instrument has been completed and approved by DWR. 0-5 Unless Item L of Section V applies, then no remaining credits will be released until the conservation easement has been assigned to an approved land trust or stewardship 8 Monitoring Report #4: Approved by the DWR** & Financial Assurance Posted 5-10 9 Monitoring Report #5: Approved by the DWR** and final site visit by DWR has been conducted 10 Total 100% * For specification, please see Section V in this Instrument ** DWR Approval provided upon a determination that the site is meeting success criteria contained within the approved BPDP C. DWR may modify credit release schedules based on the information submitted or the order in which required information is received. DWR will notify the Sponsor of any modification to the credit release schedule. Any major deviations to the Bank Parcels that were not authorized in writing by DWR prior to implementation may affect the amount of riparian buffer credits and nutrient offset credits that will be generated by the Bank Parcels. Table 6. Sassafras Phase II Project Credits Project Area N Credit Conversion Ratio (ft2/pound) P Credit Conversion Ratio (ft2/pound) Credit Type Location Subject? (enter NO if ephemeral or ditch 1) Feature Type Mitigation Activity Min-Max Buffer Width (ft)Feature Name Total Area (ft2) Total (Creditable) Area of Buffer Mitigation (ft2) Initial Credit Ratio (x:1)% Full Credit Final Credit Ratio (x:1) Convertible to Riparian Buffer? Riparian Buffer Credits Convertible to Nutrient Offset? Delivered Nutrient Offset: N (lbs) Delivered Nutrient Offset: P (lbs) Nutrient Offset Rural Yes Ditch Restoration 0-100 Ditch 1 82,737 1 100%No —Yes 4,317.327 — Nutrient Offset Rural Yes Ditch Restoration 101-200 Ditch 1 54,654 1 33%No —Yes 2,851.919 — Nutrient Offset Rural No Ephemeral Restoration 101-200 RS2-A 21,482 1 33%No —Yes 1,120.959 — Nutrient Offset Rural Yes I / P Restoration 101-200 RS1, RS2-B, RS2-C, RS3 380,033 1 33%No —Yes 19,830.630 — Nutrient Offset Rural No Ditch Restoration No Credit Area (> 200 ft)17,640 1 No —No —— ——— ——— ——— ——— ——— ——— ——— ——— ——— ——— ——— ——— ——— ——— Totals (ft2):556,546 0 0.000 28,120.835 0.000 Total Buffer (ft2):0 0 Total Nutrient Offset (ft2):556,546 N/A Total Ephemeral Area (ft2) for Credit:0 0 Total Eligible Ephemeral Area (ft2):0 0.0%Ephemeral Reaches as % TABM Enter Preservation Credits Below Total Eligible for Preservation (ft2):0 0.0%Preservation as % TABM Credit Type Location Subject?Feature Type Mitigation Activity Min-Max Buffer Width (ft)Feature Name Total Area (sf) Total (Creditable) Area for Buffer Mitigation (ft2) Initial Credit Ratio (x:1)% Full Credit Final Credit Ratio (x:1) Riparian Buffer Credits Buffer — Buffer — Buffer — — — Preservation Area Subtotals (ft2):0 0 Square Feet Credits 0 0.000 0 0.000 0 0.000 0 0.000 Square Feet Credits Nitrogen:28,120.835 Phosphorus:0.000 Neuse 03020201 - Outside Falls Lake 19.16394 N/A Restoration: Enhancement: Mitigation Totals 556,546 TOTAL AREA OF BUFFER MITIGATION (TABM) TOTAL NUTRIENT OFFSET MITIGATION Mitigation Totals Nutrient Offset: Preservation: Total Riparian Buffer: 1. The Randleman Lake buffer rules allow some ditches to be classified as subject according to 15A NCAC 02B .0250 (5)(a). last updated 08/03/2020 As-Built Credits 28,120.835 Original Mit Plan Credits 28,121.208 Nutrient Offset Credit release schedule TOTAL (as-built) Credits: Credit Release #%Nitrogen Release Date 1 Instrument and BPDP Approved by DWR, Conservation Easement Recorded* and Financial Assurance Posted 20%5,624.167 4/27/2023 2 Mitigation Site Earthwork, Planting and Installation of Monitoring Devices Completed 15%4,218.125 5/17/2023 Re-plant TOB of Ditch and a couple of areas outside to the easement boundary (6 feet away)5%1,406.042 5/17/2023 3 Monitoring Financial Assurance Posted and Approval of As-Built Report 10%2,812.084 9/6/2023 4 Monitoring Report #1: Approved by the DWR** & financial assurance renewed 10%2,812.084 5 Monitoring Report #2: Approved by the DWR** & financial assurance renewed 10%2,812.084 6 Monitoring Report #3: Approved by the DWR** & financial assurance renewed 10%2,812.084 7 Item B (1) of Section X in this Instrument has been completed and approved by DWR.5%1,406.042 8 Monitoring Report #4: Approved by the DWR** & financial assurance renewed 5%1,406.042 9 Monitoring Report #5: Approved by the DWR** and final site visit by DWR has been conducted 10%2,812.084 14,060.418 Credits Released to Date