Loading...
HomeMy WebLinkAbout20071641 Ver 1_Approval Letter_20071107Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen Ei. Sullins, Director Division of Water Quality November 7, 2007 DWQ# 07-1641 Davidson County Mr. Ed Comer c/o Service Recovery Corp 375 Sink Inn Rd Lexington, NC 27292 APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Comer: You have our approval, in accordance with the attached conditions, to place permanent fill in 75 linear feet of stream and 0.25 acres of wetland in order to construct one road crossing for the future commercial site located on Sink Inn Rd in Lexington in Davidson County, as described in your application received by the Division of Water Quality (DWQ) on October 5, 2007. After reviewing your application, we have determined that this fill is covered by General Water Quality Certification Number 3631, which can be viewed on our web site at http://www.ncwaterquality.org/wetlands.html. This Certification allows you to use Nationwide Permit Number 39 when it is issued by the U.S. Army Corps of Engineers. In addition, you should secure any other applicable federal, state or local permits before you proceed with your project, including (but not limited to) those required by Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. Also, this approval will expire when the accompanying 404 permits expire unless otherwise specified in the General Certification. This approval is valid only for the purpose and design that you have described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fill for this project (now or in the future) exceeds one acre, or total fill to perennial streams equals or exceeds 150 linear feet, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification, as well as the additional conditions listed below: The following impacts are hereby approved as long as all other specific and general conditions of this Certification are met. No other impacts, including incidental impacts, are approved: Identifier Stream Im act len th Impact Site 1 Unnamed tributary Michaels Branch 75 linear feet Identifier Wetland Im act area Impact Site 2 Riverine wetland adjacent to Michael's Branch 0.25 acres No~° Carolina ~atura!!y North Carolina Division of Water Quality 585 Waughtown Street Phone (336) 771-5000 Customer Service Winston-Salem Regional Office Winston-Salem, NC 27107 Fax (336) 771-4630 I-877-623-6748 Internet: www.ncwateraualit~ora An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Mr. Ed Comer November 7, 2007 DWQ # 07-1641 Page 2 Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices: a. Erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. e. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 4. Erosion and sediment control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of erosion and sediment control measures in wetlands or waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the project is completed or, if applicable, within six months of the date that the project is released by the North Carolina Division of Land Resources. No waste, spoils, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control "Best Management Practices" shall be performed so that no violations of state water quality standards, statutes, or rules occur. Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCGO10000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http://h2o.enr.state.nc.us/su/Forms Documents.htm. 7. Where riprap is required for energy dissipation and scour protection, it shall be limited to the minimum dimensions specified by appropriate engineering calculations. Riprap may only be used below the normal high water level. The original grade and elevation of the stream's cross-section must be maintained. Riprap placed in the stream bottom must be inserted into the bottom matrix to a depth sufficient to provide the thickness of riprap required for scour protection. The elevation of the stream bottom must not be increased by the placement of riprap. Placement of riprap must not result in destabilization of the streambed or banks upstream or downstream of any crossing. Mr. Ed Comer November 7, 2007 DWQ # 07-1641 Page 3 All construction activities associated with this project shall minimize built-upon surface area, direct stormwater runoff away from surface waters, and incorporate best management practices to minimize water quality impacts. If concrete is used with any fill material, it shall not be allowed to come in contact with surface waters until it has cured. If any stormwater must be collected for discharge into a stream channel, it shall not enter the stream as a point source, but shall be slowed and discharged as sheet flow prior to entering the riparian buffer on either side of the stream. 9. You have indicated an impervious surface area of less than 30% in the PCN Application dated July 21, 2007 and approved by this written 401 Water Quality Certification. You are reminded that if future development of this site increases impervious surface area above 30% you have triggered Condition No. 4 in GC No. 3631, you will be required to develop, submit for DWQ approval, and implement Stormwater Management Plans. The stormwater management plan must include construction plans, specifications, stormwater BMP worksheets, and supporting calculations. The stormwater best management practices are required to be appropriate for the surface water classification and designed to remove at least 85% TSS according to the most recent version of the NC DENR Stormwater Best Management Practices Manual. 10. Upon finishing the project, the Applicant shall fill out and return the enclosed "Certificate of Completion" to notify NCDWQ when all work included in the §401 Certification has been completed. This certificate should be returned to the Winston-Salem Regional Office of the NCDWQ at the address listed on the form. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Sue Homewood in the DWQ Winston-Salem Regional Office at 336-771-4964 or at sue.homewood@ncmail.net. Sincerely, Coleen H. Sullins, Director Division of Water Quality cc: John Thomas, U. S. Army Corps of Engineers, Raleigh Regulatory Field Office DWQ Winston-Salem Regional Office DWQ Central Files DWQ Wetlands/401 Mr. Ed Comer November 7, 2007 DWQ # 07-1641 Page 4 DWQ Project No.: County: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: Certificate of Completion tipon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Cert~cation I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certi acation I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certi acation Partial Final Date: I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date