Loading...
HomeMy WebLinkAboutSW6211003_Annual Certification Summary (2024)_20240301 Section A-Project Information Permit Number: SW6211003 Project Town/City: Red Springs Project Name: Dollar General-Red Springs Project County: Hoke Permit issued: 1/14/2022 Project Status: underway Section B-Permittee Information Name: Rhetson Companies Inc Street Address: Mailing Address: Signing Official: Jamie Encinosa 2075 Juniper Lake Rd 2075 Juniper Lake Rd Title: EVP of Operations Phone Number: 910-944-0881 Ext. West End,NC 27376 West End,NC 27376 Email Address: jamie@rhetson.com Section C-Property Owner Information Name: Wills P.Rodgers,Jr. Street Address: Mailing Address: Signing Official: Wills Rodgers 8205 Belgium Drive 8205 Belgium Drive Title: Property Owner Phone Number: 9192185784 Raleigh,North Carolina 27606 Raleigh,North Carolina 27606 Email Address: willsrodgers@msn.com Section D-Site Conformance with Permitting Conditions Max BUA not exceeded? NA Veg.setbacks per plans? NA Site is as shown on plans? NA SCM BUA not exceeded? NA Easements recorded? NA Designer Cart.submitted? NA Lot BUA not exceeded? NA O&M Agreemt recorded? NA O&M being performed? NA BUA as shown on plans? NA O&M Agreemt on plats? NA No maintenance issues? Yes SCM/LD area per plans? NA Deed Restrict.recorded? NA Maint.records being kept? Yes SCM/LD area accessible? NA O&M done per E&SC? Yes Permit is active? Yes Stormwater outlets stable? NA SCMs fixed when done? NA Other conditions met? Yes See Attachment A for a list of all N/A explanations to the above items. Section E-Plan to Bring the Project info Conformance Project is in conformance with all permit conditions. Section F-Project Certifier Information Certifier Signing: Carlo Pardo Street Address: Mailing Address: Title: Professional Engineer 4006 Barrett Drive 4006 Barrett Drive Phone Number: 9195536570 Suite 104 Suite 104 Email Address: cpardo@bowman.com Raleigh,NC 27609 Raleigh,NC 27609 Section G-Certification The information in this form is true,accurate,and complete? Yes The project is in conformance with all permit conditions? Yes Electronically signed by Carlo Pardo on March 1,2024. ATTACHMENT A Explanation about why"NIA"items above are not applicable to this project. Max BUA not exceeded N/a: Construction is underway. SCM BUA not exceeded N/a: Construction is underway. Lot BUA not exceeded N/a: N/A BUA as shown on plans N/a: Construction is underway. SCM/LD area per plans N/a: Construction is underway. SCM/LD area accessible N/a: Construction is underway. Stormwater outlets stable N/a: Construction is underway. Veg.setbacks per plans N/a: N/A Easements recorded N/a: Construction is underway. O&M Agreemt recorded N/a: Construction is underway. O&M Agreemt on plats N/a: Construction is underway. Deed Restrict.recorded N/a: N/A O&M done per E&SC N/a: SCMs fixed when done N/a: Construction is underway. Site is as shown on plans N/a: Construction is underway. Designer Cert.submitted N/a: Construction is underway. O&M being performed N/a: Construction is underway. No maintenance issues N/a: Maint.records being kept N/a: Permit is active N/a: Other conditions met N/a: