Loading...
HomeMy WebLinkAboutNCG021035_Application_20240229 FOR AGENCY USE ONLY r NCG02� 0 3 5 Assignedto: 4 COOVL ARO FRO MRO RRO WAR WIRO WSRO R Division of Energy, Mineral, and Land Resources Land Quality Section SCE1�F National Pollutant Discharge Elimination System FF8'?g ¢ NCG020000 Notice of Intent This General Permit covers STORMWATER AND/OR WASTEWATER DISCHARGES associated with activities under SIC(Standard Industrial Classification)Code 14[Mineral Mining Industry]except for:peat mining, coal mining, metal mining, oil and gas extraction, tourist gem mines, NCDOT borrow pits, in-stream sand mining, and discharges from mining operations which are intermixed on site with stormwater from concrete operations. You can find information on the DEMLR Stormwater Program at deq.nc.gov/SW. Directions: Print or type all entries on this application. Send the original, signed application with all required items listed in Item (9) below to: NCDEMLR Stormwater Program, 1612 MSC, Raleigh, NC 27699-1612. The submission of this application does not guarantee coverage under the General Permit. Prior to coverage under this General Permit a site inspection will be conducted. �z I, 1. Owner/Operator(to whom all permit correspondence will be mailed): P NpTa of legal organizatioyI entity: l Legally responsible person as sig ed irk Item(1Q)below: /"( µ F�ti5o L� �} �r ooA T2 f'l�th�F2 Cd elf card T. t Street address: Cit : Stat Zip Code: t�% 5 r4 STx-e e r I�its�« n'Y HI'✓ 88 C( Telephone number: Email address: Zs'z— I Yi- 1730 A re Ovzmd ,2 Type of Ownership: 11v Government ❑ County ❑Federal ❑Municipal ❑ State Non-government ❑ Business(If ownership is business,a copy of NCSOS report must be included with this application) ndividual 2. Industrial Facility(facility being permitted): Facility name: Facility environment I co act: 1j2 I rk /�l e Ali, �� Street address: n / C�i State: Zip Code: Parcel Identification Number(PIN) CountyC : 1 " 01 " © �1 Telephone number: EmailJ a dress: /I 2— tf5 —( �.3U i46 wG9KL�t2te eitilp�F „a�rl,C r( Latitude of eatLance. 3S Longitude of entrance:r 2 `f 7 d o / 7 7,13 cl s` ra/ 4-digit SIC co e: Facility is: Date operation is to begin or began: El New El Proposed ! . 1�� Existing �l�3 Types of minerals mined at this facility: y� ❑ Clay ❑ Feldspar Ore El Lithium Ore El Phosphate ❑Soil Yi Construction Sand El Industrial Sand El Other: ��/ ))) Page 1 of 11 V—o 7-- 2d K Is this a processing-only facility for materials mined elsewhere? Is this an inactive mine site? ❑Yes ❑Y s 0 0 Does total area of this mine site include ready-mixed concrete plant and/or asphalt plant areas? ❑Yes,and has separate NPDES stormwater permits(provide permit numbers): ❑Yes,and does not have separate NPDES stormwater permits No koes this facility already have a valid Mining Permit from DEMLR's Land Quality Section? Yes(please provide the Mining Permit Number) �� q ❑ No(please indicate the status of the Mining Permit application) / re you applying for a discharge permit in the same location as a previously permitted mine? Yes(please provide permit number and mine name) ❑ No th stormwater discharges to a municipal separate storm sewer system(MS4),name the operator of the MS4: N/A 3. Consultant(if applicable): N meo consultant: C It' gfi�t: / /1� DJ I��U Adswfc .pT ��' �i �alSv+�t / Street add s: [City: S Zip de 110 kvls f Saco,4d S APer WAf4J-i /� /`� C Z7`�t1 q Telp Z a—number: Wl�dress:h /� GO�vI� � / / i— 7Z AAJS 4. Development Activities and Buffers Mining operation will precede/development activities at this site: ❑Yes So al�vO�^�'� D„�L y /qr)y!Ny/ ❑ No Mine is located within one of the 20 Coastal Counties,and will it add more than 10,000 ftz of impervious surface: W (to both) this mine is within one of the 20 Coastal Counties,but will not at more than 10,000 ft2 of impervious surface ❑ No,this mine is not within one of the 20 Coastal Counties 7Mi a is in the Neuse,Tar-Pamlico,or Catawba River Basins,OR in the Randleman or Jordan Water supply Watersheds? Yes(specify size of stream buffers) 00 fee_r ❑ No Mine site will include wastewater discharges from a ready-mix concrete batch plant? ❑Yes(please seek additional coverage under General Permit NCG140000: Ready-Mix Concrete) No S. Mine Dewatering RM dewatering will occur at this site: Yes ❑ No(mark N/A for the rest of this section) e dewatering from this facility will be discharged to: Surface Waters and/or Wetlands ❑Other(specify) ❑Mine will not discharge dewatering to Surface Waters and/or Wetlands;specify how dewatering will occur and where water will be directed: ❑N/A Page 2 of 11 e I and/or Surface Waters are within 4W of the mine pit perimeter: 404/401 Certification permits required: Yes(specify distance) No L`vrt G ttcL �� r�-/,LS ❑Yes(briefly describ ) No WR1I I Rwct 5 -37D Fl1a`. o �/'k.'f ir•r �2 is/�1 G.�Y+� Have you been required to obtain a wetland d neation certified by the US Army Corps of Engineers? ❑Yes(please attach to this application) No 6. Wastewater Treatment Will this fa ili wash mined materials? ❑ Yes No Will discharges of process wastewater treatment systems occur(including possible recycle system overflows) ❑ Yes(please describe) No ill this facility employ chemical additives to flocculate suspended solids? ❑Ye (specify name/manufacturer/quantity of daily use) No N te: please visit:https://files.nc.gov/ncdeg/Water+Quality/Environmental+Sciences/ATU/PAM8 30 18.pdf for list of ap roved PAMS Will any of the wastewater treatment facilities at this mine overflow only during rainfall events that exceed the 10-yr, 24-hr rainfall event? ❑ Yes(specify which systems) No Are waste r treatment facilities(including recycle systems)planned in the 100-year flood plain? ❑ Yes No Wastewater Treatment Alternative Review as quired by 15A NCAC 2H.0105(c)(2) Types of wastewater this mine site will discharge: Ixine Dewatering ❑ Process Wastewater Types of wastewater considered for this alternative review: Mine Dewatering ❑ Process Wastewater Are there existing sewer lines within a one-mile radius? ❑Yes ❑Wastewater treatment plant will accept wastewater ❑ Is feasible to connect(explain) ❑ Is not feasible to connect(explain) ❑ Wastewater treatment plant will not accept wastewater(please attach letter documenting this) No Page 3 of 11 Are you already proposing a closed-loop recycle system(CLRS)that meets design requirements of 1SA NCAC 2T.10000? ❑Yes,for dewatering ❑Yes,for process wastewater ❑ Yes,for both ❑ No,this option is technologically feasible(explain) ❑ No,this option is not technologically feasible(explain) ❑ No,this option is otherwise feasible(explain) No,this option is otherwise not feasible(explain) Loase- dA ¢,,/ s'tlicit 'Q� ra re- ./"/,-A01IGAIt-4 What is the feasibility of building a CLRS compared to direct surface water discharge? M l"I e I(TS /har^a— r t/e^ Tk if 8J Ache f i T 2 . Surface or Subsurface Disposal System ❑ A surface or subsurface disposal system is technologically feasible(explain) A surface or subsurface disposal system is not technologicall feasible((explain) 4 0 s� o�Q y Sfrn d �a S /-I vt f-( �y ❑ A surface or subsurface disposal system is otherwise feasible to implement(explain) �A surface of subsurface disposal system is not otherwise feasible to implement(explain) NIfk- P.eAC�1 -r,uw /+i , What is the feasibility of employJ'ng a subsurface of surface discharge as compared to a direct discharge to surface waters? Direct Discharge to surface waters is the most environmentally sound alternative to all reasonably cost-effective options tprAht wastewaters being considered? Yes ❑ No If this review included all wastewater discharge types,would excluding some types make any of the above non-discharge options feasible for some the wastewaters? e❑ Y No 7. Outfalls(s)At least one outfall is required to be eligible for coverage. 3-4 digit identifier: Nome of receivin w/�atter: Classification: ❑This water is impaired. e/ Jr6 SW f� C 1' /6 / sit/ ❑This watershed has a TMDL'~ Discharge from this outfall is from: ❑ Stormwater Mine Dewatering ❑ Process Wastewater 7Q10 Flow of receiving waterbody(if discharging Mine Dewatering or Process Wastewater to waters classified as HQW, ORW,Tr,WS-1,W541,WS-III,SA,or PNA): A Dischar a occurs from this outfall: ❑ Only during a rainfall event Xintermittently(indicate how often) ❑ Continuously(indicate flow in CFS) +f'DA 3 Piti f✓m.� Latitude of ou all: Longitude of outfall: Z S7E -7"7, lctc( 8 u/ Brief description of thi industrial activities that drain to this outfall: J/VA I- m ! va. /Zcrrr� !M it/Q ,EicG/f v afro trll blrse ' li4hr a u e� ��rR/J ii del tIV k.0'r"I'( s Do Vehicle Maintenance Activities occur in the dramage area of this outfall? ❑ Yes VN0 If yes,how many gallons of new motor oil are used each month when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑This water is impaired. ❑This watershed has a TMDL Page 4 of 11 Discharge from this outfall is from: ❑ Stormwater ❑ Mine Dewatering ❑ Process Wastewater 7Q10 Flow of receiving waterbody(if discharging Mine Dewatering or Process Wastewater to waters classified as HOW, ORW,Tr,WS-I,WS-II,WS-III,SA,or PNA): Discharge occurs from this outfall: ❑ Only during a rainfall event ❑ Intermittently(indicate how often) ❑ Continuously(indicate flow in CFS) Latitude of outfall: Longit ryr utfall: Brief description of the industrial activities that drain t is utfa Do Vehicle Maintenance Activities occur in the drainage rea this outfall? ❑ Yes ❑ No If yes,how many gallons of new motor oil are used eachimonth when averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑This water is impaired. ❑This watershed has a TMDL. Discharge from this outfall is from: ❑ Stormwater ❑ Mine Dewatering ❑ Process Wastewater 7Q10 Flow of receiving waterbody(if discharging Mine Dewatering or Process Wastewater to waters classified as HQW, ORW,Tr,WS-1,WS-II,WS-III,SA,or PNA): Discharge occurs from this outfall: ❑ Only during a rainfall event ❑ Intermittently(indicate how often) ❑ Continuously(indicate flow in CFS) Latitude of outfall: Longitude of outfall: Brief description of the industrial activities that drain to this outfall: Do Vehicle Maintenance Activities occur in the drainaqe area f t outfall? ❑ Yes ❑ No If yes, how many gallons of new motor oil are used h roon h veraged over the calendar ear? 3-4 digit identifier: Name of receiving water: assification: El This water is impaired. ❑This watershed has a TMDL Discharge from this outfall is from: ❑ Stormwater ❑ Mine Dewatering ❑ Process Wastewater 7Q10 Flow of receiving waterbody(if discharging Mine Dewatering or Process Wastewater to waters classified as HQW, ORW,Tr,WS-I,WS-II,WS-III,SA,or PNA): Discharge occurs from this outfall: ❑ Only during a rainfall event ❑ Intermittently(indicate how often) ❑ Continuously(indicate flow in CFS) Latitude of outfall: Longitude of outfall: Brief description of the industrial activities that drain tot is o tfall Do Vehicle Maintenance Activities occur in the drainage a f t is utfa ? ❑ Yes ❑ No If yes,how many gallons of new motor oil are used eac mo en averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑This water is impaired. ❑This watershed has a TMDL Discharge from this outfall is from: ❑ Stormwater ❑ Mine Dewatering ❑ Process Wastewater 7Q10 Flow of receiving waterbody(if discharging Mine Dewatering or Process Wastewater to waters classified as HQW, ORW,Tr,WS-I,WS-II,WS-III,SA,or PNA): Discharge occurs from this outfall: Page 5 of 11 El Only during a rainfall event ❑ Intermittently(indic to how often) ❑ Continuously(indicate flow in CFS) Latitude of outfall: on to utfall: Brief description of the industrial activities that drain to is u all: Do Vehicle Maintenance Activities occur in the drainage area of this outfall? ❑Yes ❑ No If yes,how many gallons of new motor oil are used each month when averaged over the calendar ear? All outfalls must be listed and at least one outfall is required.Additional outfalis may be added in the section "Additional Outfalls"found on the last page of this NOI. S. Other Facility Conditions(check all that apply and explain accordingly): ❑This facility has other NPDES permits. If checked,list the ermit numbers for all current NPDES permits: C LIA the /2 M 1 r A(9. C U 3 o ❑This facility has Non-Discharge permits(e.g.recycle permit). If checked,list the permit numbers for ail current Non- Discharge permits: 9 /- This facility uses best management practices or structural stormwater control mg sures. If checked, br(iefly describe the practices/measures and show on site diagram: A f t S✓K�`h �� yvy�elz F/�m drs f✓n/�ycQ/}/[e �ff l Ldwr iKrv-M«a ❑This facility has a Stormwater Pollution Prevention Plan(SW PP). If checked, please list the date the SWPPP was implemented:N/A ❑ This facility stores hazardous waste in the 100-year floodplain. / /4 A0 hA 2 4/ch'Ll If checked,describe how the area is protected from flooding: �lG` fj—o/t/F -e o`f t7 / e ❑This facility is a(mark all that apply) ❑ Hazardous Waste Generation Facility ❑ Hazardous Waste Treatment Facility ❑ Hazardous Waste Storage Facility ` T ❑ Hazardous Waste Disposal Facility If checked,indicate: Kilograms of waste generated each month: Type(s)of waste: How material is stored: Where material is stored: Number of waste shipments per year: Name of transport/disposal vendor: Transport/disposal vendor EPA ID: Vendor address: ❑This facility is located on a Brownfield or Superfund site If checked, briefly describe the site conditions: ❑ Facility provides appropriate secondary containment for bulk storage of liquid materials If checked, briefly describe these measures: /n L/A ❑ Site has an active landfill within the mining permit boundary If checked, please indicate type: `�jj a) ElLOD(Land clearing and Inert Debris) Y t' �'T b) ❑ other(specify) Page 6 of 11 9. Re fired Items(Application will be returned unless all of the following items have been included): Check for$120 made payable to NCDEQ ❑ Copy of most recent Annual Report to the NC Secretary of State(if applicable) & Ar This completed application and any supporting documentation *GrCopy of the approved mining permit or indication of mining permit application status ❑ Cppy of US Army Corps—approved wetland delineation(if applicable) Une drawing of the water flow through the facility or block flow diagram Pictorial description of the nature of any sources of water and any collection and treatment measures site diagram showing,at a minimum, existing and proposed: a) outline of drainage areas b) surface waters c) stormwater management structures d) location of stormwater outfalls corresponding to the drainage areas e) runoff conveyance features f) areas where process materials are stored g) impervious areas JUDa40— h) site property lines 2 copies of large scale(24"x36"minimum)site plan showing: a) topographical lines b) all outfall locations MOW- c) applicable buffers and delineated wetlands d) receiving waters e) 100-year flood plain(if applicable) Copy of county map or USGS quad sheet with the location of the facility clearly marked If mines site is in one of the 20 Coastal Counties(if applicable) Applicant has check with the appropriate regional office to verify the need for a Coastal State Stormwater permit. a) Indicate the Regional Office Contact: hL/ Detailed list of: a) impervious surface areas and percentages /do lmpenUi✓�S A r '4 b) sub-drainage areas T M ("ram _ 11 771 c) total drainage area If mine is dewatering and near wetlands,or may otherwise impact surface waters or groundwater 2 copies of large scale(24"x36"minimum)plans delineating areas on the listing acreage including: a) wetlands b► ditches ?-060Q c) well placements 46,K d) pits e) borrow areas f) overburden storage g) stormwater controls/BMPs h) vehicle maintenance areas 049b He i) settling basins )) product process(such as screening,stockpiles,and waste piles) k) total drainage area 1) impervious surface percentages(if state Stormwater programs apply) , m) applicable buffers access and/or haul roads Pump dewatering size and information on its specifications Page 7 of 11 ❑ Well information(design,depths, maintenance) ❑ Physical monitoring for the wetland areas ILI ettling pond size information, if applicable Level spreader design,if applicable Details about dewatering method Cone of influence calculations _ Description of measures to prevent erosion and flooding !( q2/t Frw vvt dt37vI A4i ❑ Description and information about 401/404 permits that have been obtained /'/0"-re Mi `C /0� ❑ Copy of US Army Corps of Engineers wetlands delineations or approved wetland delineation(if applicable) A1114- I have contacted my local regional office about a Pumping Operation and Monitoring(POM)plan a) Regional Office Contact: Wf f IhA l'0 ty b) Date Contacted: J /i 4L/r}/t 7"e➢ 2 10. Applicant Certification: North Carolina General Statute 143-215.6B(i)provides that: Any person who knowingly makes any false statement, representation,or certification in any application,record,report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article.. .shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). n r penalty of law, I certify that: I am the person responsible for the permitted industrial activity,for satisfying the requirements of this permit,and for any J Tvil or criminal penalties incurred due to violations of this permit. he information submitted in this NOI is,to the best of my knowledge and belief,true,accurate,and complete based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information. .k I will abide by all conditions of the NCG020000 permit.I understand that coverage under this permit will constitute the Wm it requirements for the discharge(s)and is enforceable in the same manner as an individual permit. ,P<l hereby request coverage under the NCG020000 General Permit. Printed Name of Applicant: / '44t4 AF h 0. /T/(t Title: (Sig( naattu a of Applicant) (Date Signed) Mail the entire package to: DEMLR—Stormwater Program Department of Environmental Quality 1612 Mail Service Center Raleigh, NC 27699-1612 Page 8 of 11 Additional Outfalis 3-4 digit identifier: Name of receiving water: Classification: ❑This water is impaired. ❑This watershed has a TMDL Discharge from this outfall is from: ❑ Stormwater ❑ Mine Dewatering ❑ Process W tew er 7Q10 Flow of receiving waterbody(if discharging Mine at rin or r ess Wastewater to waters classified as HQW, ORW,Tr, WS-I,WS-II,WS-III,SA,or PNA): Discharge o(curs jrbrO this outfall: ❑ Only during a rainfall event ❑ Intermitten ly(i icate how often) ❑ Continuously(indicate flow in CFS) Latitude of outfall: Longitude of outfall: Brief description of the industrial activities that drain to this outfall: Do Vehicle Maintenance Activities occur in the drainage area of this outfall? ❑ Yes ❑ No If yes,how many gallons of new motor oil are used each month when averaged over the calendaryear? 3-4 digit identifier: Name of receiving water: Clas fication: ❑This water is impaired. ❑This watershed has a TMDL Discharge from this outfall is from: ❑ Stormwater ❑ Mine Dewatering ❑ Proce a tewat r 7Q10 Flow of receiving waterbody(if discharging Mi a ate n or ocess Wastewater to waters classified as HQW, ORW,Tr, WS-1,WS-11,WS-III,SA,or PNA): Discha a occurs rom this outfall: ❑ Only during a rainfall event ❑ Intermittently ' dicate how often) ❑ Continuously(indicate flow in CFS) Latitude of outfall: Longitude of outfall: Brief description of the industrial activities that drain to this outfall: Do Vehicle Maintenance Activities occur in the drainage area of this ou II? ❑Yes ❑ No If yes,how many gallons of new motor oil are used each month when a4ragOd over the calendar ear? 3-4 digit identifier: Name of receiving water: la 'fiicati ❑This water is impaired. ❑This watershed has a TMDL Discharge from this outfall is from: ❑ Stormwater ❑ Mine Dewatering ❑ Process Wast water 7Q10 Flow of receiving waterbody(if discharging Mine Dewatering 6r Process Wastewater to waters classified as HQW, ORW,Tr,WS-I,WS-II,WS-III,SA,or PNA): Discharge occurs from this outfall: ❑ Only during a rainfall event ❑ Intermittently(indicate how often) ❑ Continuously(indicate flow in CFS) Page 9 of 11 Latitude of outfall: Longitude of outfall: Brief description of the industrial activities that drain to this outfall: Do Vehicle Maintenance Activities occur in the drainage ea f t outfall? ❑ Yes El If yes,how many gallons of new motor oil are use each on h w e a raged over the calendar year? ]q7 3-4 digit identifier: Name of receiving water: lassifiication: ❑This water is impaired. ❑This watershed has a TMDL Discharge from this outfall is from: ❑ Stormwater ❑ Mine Dewatering ❑ Process Wastewater 7Q10 Flow of receiving waterbody(if discharging Mine Dewatering or Process Wastewater to waters classed as HQW, ORW,Tr,WS-1,WS-11,WS-III,SA,or PNA): Discharge occurs from this outfall: ❑ Only during a rainfall event ❑ Intermittently(indicate how often) ❑ Continuously(indicate flow in CFS) Latitude of outfall: Longitude of outfall: Brief description of the industrial activities that drain to this outf II: Do Vehicle Maintenance Activities occur in the drain a rea of thi Au I? ❑ Yes ❑ No If yes, how many gallons of new motor oil are used c th when averaged over the calendar ear? 3-4 digit identifier: Name of receiving water: I Classification: ❑This water is impaired. ❑This watershed has a TMDL Discharge from this outfall is from: ❑ Stormwater ❑ Mine Dewatering ❑ Process Wastewater 7Q10 Flow of receiving waterbody(if discharging Mine Dewatering or Process Wastewater to waters classified as HQW, ORW,Tr,WS-1,WS-II,WS-III,SA,or PNA): Discharge occurs from this outfall: ❑ Only during a rainfall event ❑ Intermittently(indicate how often) ❑ Continuously(indicate flow in CFS) Latitude of outfall: Longit cll outfall: Brief description of the industrial activities that drain thi outf I: Do Vehicle Maintenance Activities occur in the drain ar of hi outfa ? ❑Yes ❑ No If yes,how many gallons of new motor oil are used h m nth hen averaged over the calendar year? 3-4 digit identifier: Name of receiving water: Classification: ❑This water is impaired. ❑This watershed has a TMDL Discharge from this outfall is from: ❑ Stormwater ❑ Mine Dewatering ❑ Process Wastewater 7Q10 Flow of receiving waterbody(if discharging Mine Dewatering or Process Wastewater to waters classified as HQW, ORW,Tr,WS-1,WS-II,WS-III,SA,or PNA): Discharge occurs from this outfall: ❑ Only during a rainfall event ❑ Intermittently(indicate how often) ❑ Continuously(indicate flow in CFS) Latitude of outfall: Longitude of outfall: Page 10 of 11 Brief description of the industrial activities that drain to this outfall: Do Vehicle Maintenance Activities occur in the drainage area of this outfall? ❑ Yes ❑ No If yes, how many gallons of new motor oil are used each month when averaged over the calendar year? Page 11 of 11 Hood Richardson, PA C576 110 West Second Street Washington, N. C. 27889 252-975-3472 February 26, 2024 NARATI VE NCG020000 NOTICE OF INTENT TRIPPLE A MINE CRAVEN COUNTY This is a proposal to dewater the surface workings of a sand mine located at the headwaters of a small branch off Swift Creek. This sand has a very low content of silt with no detectable clay. The sand is evenly graded with a very high percolation rate, in excess of 20 inches per hour according to the USDA Soil Conservation Service. This makes dewatering by pumping off site the only practical method of lowering the surface water table in order to excavate sand. Water travels from the pump located in the mine pit(excavation) by pipe and then a ditch into a settling basin, then across a level spreader and then into wetlands which feed the branch,then into Swift Creek. Best storm water management practices are achieved by surface water from disturbed areas being directed into the mine excavation which is the first settling pond. Because of the high permeability of these sands, rainwater rarely arrives at the pit. The significant source of water at this site is ground water which accumulates in the mine pit. There is no surface or off site source of water other than rain. Treatment of pumped water consists of settling in the pit and then in the settling basin prior to crossing the level spreader and flowing into the wetlands. There are no ditches or streams flowing into or across this 80 acre tract of land. Wetlands located inside this 80 acre tract are the headwaters of the branch flowing into Swift Creek. There are no ditches or swales collecting flowing water in the areas being mined. Rainwater percolates into the ground. Corps of Engineers wetlands were delineated and are shown on the mine mapys which Ire a part of this notice. There are isolated wetlands on this property. Wetl tectiyd by a 50 foot wide undisturbed buffer. Consideration is being given to mio72tpd wetlands after consultation with State and Federal authorities t 4 .. Hood L. Richardson, ¢e it + #� # ## # # # # STONEY AA,yy�H qp { '!//'f •# # # # ,, �'�\'# # # # r �- ( -0� t # E # # # # # + # # -4cam ' # # # # t t =►ivy # # # # # ' # ## 1;4 �.# # ## � , CD u+wm ! r �## # ##, # ### # �k # ## T > O # ## . ## # ## # � � # t SraEEnr +emu k - mzzn M n # # # F # F O.►� #FF1 #. 1f O_ m sm z 1 y .p N OT ,N N N 8 NC Surface Water INC Classificati. Report an Issue ,;, QStream Details Legend ®0 -- Print tern... Print result «a Your printed files will appear -----------_� here. sal Surface Water Classifications: +, Zoom to Stream Index: 27-9746) Stream Name: Swift Creek Description: From mouth of Bear Branch to Neuse River �,W4enLard+° Classification: SC;Sw,NSW Date of Class.: April 30, 1988 What does this Class.mean? View Ike, River Basin: Neuse i i a i ••n �d 77-77.03H35.277... r n -i 0 - L J 2,000 ft State of North Carolina DOT,Esri,H... Powered by Esri '', A NC Surface Water INC Classificati... Report an Issue a Stream Details Legend ®a N e® 11 -d Print tem... Print result i j © J Your printed files will appear here. Sp;�iJtad�ah, sr re S Surface Water Classifications: We It cmVen HyA R�o�. w mi H9h� School m �b u.qo o4�- y f 77 092 35 r i L J 17000 ft State of North Carolina DOT,Esri,H... Powered by Esri , RO}' COOPER G01,01v101. ` ELIZAB I'h1 S. RISER Sevivialy DOUGLAS R. ANSEL NORTH CAROLINA haerim 0iferror Environmental 011c1/in' August 1. 2023 Manfred D Alligood _ Manfred D. Alligood 1935 West 5th Street Washington, NC 27889 RE: Annual Mining fee and Reclamation Report Tripple A Mine Mining Permit 925-97 Craven County Dear Manfred D Alligood: Pursuant to North Carolina General Statute(N.C.G.S.) §74-51.1 and §74-55, all parties holding a North Carolina Mining Permit shall pay an annual fee and submit an Annual Reclamation Report by September I of each year. Failure to pay the annual fee or submit the Annual Reclamation Report can result in a$50 per month additional fee per N.C.G.S. §74-50 and §74-55. If the required annual report and operating fee, including any late payment penalties, are not filed by December 31 of each year. the Department shall give written notice to the operator and shall then initiate permit revocation proceedings in accordance with N.C.G.S. §74-58. Attached to this letter is the invoice and the annual reclamation report farm for Tripple A Mine, permit number 425-97, which by the Division of Energy, Mineral, and Land Resources' records list you as the responsible party for this operation. As the responsible party,you are responsible for the annual fee and the annual reclamation report. Please remit the annual fee with the lower portion of the invoice, and the annual reclamation form to: Via US Postal Service: or Via PedEx/UPS: Division of Energy, Mineral, and Land Resources Division of Energy. Mineral. and Land Resources Mining Program Mining Program 1612 Mail Service Center 512 N Salisbury St.. 51h Floor Raleigh, NC 27699-I612 Raleigh. NC 27604 If your firm is paying for more than one mine with the enclosed payment, please be sure to include the annual reclamation report for each facility and the lower portion of the invoice for each facility. It is also recommended that you include the list of all of the facilities you are remitting for in your cover letter with the check. If you have any questions, please contact Brenda Harris at 919-707-9226,Adam Parr at 919-707-9207, or me at 919-707-9228. Sincerel , David Miller, P.E. North Carolina State Mining Engineer North Carolina Department of Environmental Quality l Division of Energy,Mineral and Land Reeources —, 512 North Salisbury Street ' 1611 Mail Service Center ' Raleigh.North Carolina 27699-I6I2 919.707.9200 1 _ r' DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY,MINERAL AND LAND RESOURCES �• MINING PROGRAM 2022 Annual Reclamation Report GENERAL INFORMATION Legal Corporate/Owner Nam �)�'/`f F� (� Q {� +'�yo- Mine Name:__ Mine Permit No: _ {7 +�V., __ Mine shone Number,It any: /y " V * Mine Address(911 Address) Line 1: Mine Address Lhie 2-- - City: State:—Alf Z�ip Code: County: (/fir Facility Coordinates: LatitUde 2-.Y7fIDN :7 { j9�k1 /�lFf/SY_ .� Longitude' River Basin: Responsible Official/Authorized Contact: - , � {�L � Invoice Contact: Name/Title: �n m FU A � r� /�' r T/L, Check if same as Responsible Offiicial/Authorized1Contact Mailing Address Line l: 1q3Y' cW --,r Name Title: MAgr- t�G K/ /{�(f ✓:.r rl /L, {. Mailing Address Line11,,r2r:' AA// Mailing Address Line 1:I52 S WtyS T 3 City/State/Z�qCode�'v�f{/-(/-/Gl'C�F ,TG. {��'c{ ,,7 y �p'J Mailing Address Line 2: Primary Phone No. / f -/734ax No. 4/r} Ci A�Ashr i c y /`/ < t/' 5 State: Y L Zip Code: y ?Rtj Secondary Phone No. Primary Ph nLr No. `Q'7rJ�,—//73y` Fax No. Email Address: /_�-1f/{WCVgCxer� Secondary Phone No. /W �7 , Email Address: �i/3yW CUNC2F r•y� �M f)/L�,n1 Rr + <<%/''1 El Is the site Active? Yes No Estimate land to T be newly disturbed by mining in the 2023 calendar V)f If mine is now inactive,when did mining stop? year. . r Acres Date: Z/+ Check here if no new acreage was to be affected in 2023:,a Is this stoppage permanent?!/=Yes —a No List by category the total amount of disturbed and unreclaimed land If yes,do you wish to have this mine site reI ased from present at this site at the end of the 2022 calendar year. your reclamation bond?A Yes No TAILINGS PONDS `/F �[J/ Acres Was new land affected in 2022? ,r yes STOCK PILES t`). C Acres No WASTE PILES J/YF_ Acres If yes,how much? PLANT AREA % tl N.E Acres f�1 Acres MINE EXCAVATION . C� Acres Is map onfile current? 17\I yes ,L No r TOTAL DISTURBED AREA AT SITE: 6,.3 Acres If the map/is not current,submit u—uppdated map showing "Note:WASTE PILES.should include overburden storage/disposal affected acreage. areas and berms.State and describe the amount and type of reclamation carried out in 2022 calendar year: , r A/o ly/_ Check here if no reclamation completed in 2022: /y�� O Signature of Responsible Official/Authorized Contact: _ � "�L ""^• rF /u rJ q {(/23 Date: Print Name: /�4 v'd `L�L�.SD,y' Title: (fe-, L(/t-I / — "Complete and return by September 1,2023,with the annual fee,and two copies of this form along with two copies of atwpdated.rnine-- __-- map(if needed). _ _ Shaded areas are not required,but are useful to the Mining Program. � 'a } NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY,MINERAL,AND LAND RESOURCES MINING SECTION ANNUAL MINING PERMIT FEE FOR 2023/2024 Manfred D. Alligood Invoice Date 8/I/2022 1935 West 5th Street Due Date 9/I/2022 Washington,NC 27889 This invoice is for: Tripple A Mine i Permit# 25-97 Pursuant to N.C.G.S. §74-55, the permittee is charged an Annual Permit Fee, due on September Is' of each year. Failure to submit the fee by the required deadline will result in a$50/month late fee and could result in denial of future permit actions and/or revocation of your mining permit. Summary of Charges: 2023/2024 Annual Fee $400.00 Fee for late Annual fee, or/and for late Annual 0.00 Reclamation Report, at$50/month: 0.00 Total $400.00 Notes: I. Pay by mail with a check/[Honey order payable to Division of Energy, Mineral,and Land Resources. 2. Please remit payment to: ' Via US Postal Service Via FedEs/UPS: Division of Energy, Mineral,and Land Resources Division of Energy, Mineral,and Land Resources Mining Program Mining Program 1612 Mail Service Center 512 N Salisbury St., 5"' Floor Raleigh,NC 27699-1612 Raleigh,NC 27604 3. Please include your mining permit number and mine name on all correspondence. 4. Non-payment of the annual fee by the payment due date will initiate late fees and the potential for permit revocation. 5. A$25.00 processing fee will be charged for each returned check in accordance with the N.C.G.S. §25-3-512. It the permittee has multiple sites; it is permissible to make one payment to cover multiple sites provided the pennittee supplies a list stating the site name and permit number covered by the payment. If you have any questions, please contact Brenda Harris at 919-707-9226 or David Miller at 919-707-9228. KEEP THE ABOVE PORTION FOR YOUR RECORDS. RETURN THIS PORTION WITH PAYMENT, UPDATED TELEPHONE NUhIBER IF CHANGED,AND UPDATED ARR Permit#25-97 This Side for Mining Central Office Use Only Tripple A Mine Invoice amount: Craven Payment Amount: 252-945-1730 Check Number: Manfred D. Alligood Date Received: 1935 West 5th Street Received by: Washington,NC 27889 ARR Received: YES ❑ NO 0 LF Ire ; I, 1;L�r7 rj luev p-t k,p y `�.iy, .. ay?eF SR T7Lr�I4 /},fly 4aaa'eaa.awcO�'� \i.ate .. "+caao ,cr,:caN 3 do S� �ty �aldcltyLQ55 �ry �ec Gfzov -L, SJtCtA4.�L-7'�' LJs�i Sz .* QtilT T �// k' ,/vet✓, o ,Q3f�f �- /I,.e tl•� T�vy tic Jar a�z 8 L ev,,e Sir . - L- 4 ✓1 7 �tj,,/lJ 1q 1� 10 1 s � w°a o ? 12 n V '��7`0�`' 12 Co 1-y C� 1114-, a. 1A 10 L� 1 1? V <;o ~ n 14 �----- s l 7q s i81 t2 •—` VD 8 fq1? YO Craven County GIS 1.104A r*Po fA4PAr F0591— 1799 AI Crave Ca only does NOT warrem the Into se a lion snows on in I.ma 11nCh =421 f@Bf p entl aM1ouIn be ueetl ONLY brtex eeaeeamenlpurpaeee. Printetl on Septamher 19,2922 et4a T:d4PM MoAllay-Fi iday:7am-5pm Saturday/Sunday:CLOSED Pricing/Availability: 'Ail items are subject to availability.We will make our best efforts to inform you as soon as possible if the goods you have ordered are not available or if shipment may he delayed.Ag pncos are subject to change withoul notHication. Order Defivery I PickAp: Select items I orders are available for pick-up and/or delivery,B interested,please contact us to determine what your best option will be.We can provide you with a quote on an separated dekvery charge or schedule a pick-up time for your order. Shipping Charges: 'Please note that due to the range a sizes of our dams,additional shipping fees may incur based on location I dimensions of package.Your initial shipping charge will be used as a deposit to reserve your hem,if any additional fees occur we will contact you directly to discuss your options. Inspired by your shopping trends from $95.00 from $60.00 from $70.00 Save s48.no Multiquip OP4TH 1 4"Gas Multiquip OP202TH 2" Multiquip OP301 TH 1 3' $32t� Pump-Trash I Rental Gas Pump-Trash I Gas Pump-Trash from $1,599.00 Cougar Sales&Rental.Inc, Rental Rental $273.00 MultiQuipe OP3TH Trash Cougar Sales&Rental,Inc. Cougar Sales&Rental,Inc. HS2.45 Manual Electri, Submersible Pump Pump Call for Reservation Cougar Sales 8 Rental.Inc. Cougar Sales&Rental,Inc. (248)348-8864 Call for Reservation Call for Reservation Quick shop (248)348-8864 (248)348-8864 Quick shop Choose options Add[o cart Subscribe with Cougar Sales & Rental, Inc. Join our mailing list for exclusive offers.discounts and more. Email address Sign up Main Menu Follow us MultiQuipO QP4TH Trash Pump by Cougar Sales&Rental,In_ $3,382.00 Add-On(s) Yes-Add Suction Hose Quantity 1 V Add to cart Buy with More payment options The OP4TH is the perfect choice for larger pumping applications.Powered by an easy-start Honda 10.7-HP engine it is the preferred choice for dependable dewatering.Four handles on the frame means easy handling.An optional wheel kit is also available. • Features to tackle the toughest requirements of the Pro Contractors. • Trusted 10.7HP Honda GX340 gasoline engine. • Automatic low oil shutdown for the engine is a standard feature. • Pumps water with solid content as large as 2-inch(51 mm)in diameter. • Maximum Head—92 ft(28 meters). • Can pump up to 555 gallons(2.100 liters)per minute. • Dual 4-inch discharge ports to adapt to i Brent applications. • Carbon/silicon mechanical seal for durability. • Large cteanout cover removes in seconds without tools. • Tubular Steel frame for transportation and pump protection. • Cast Iron impeller and volute for abrasion resistance/long life. • Aluminum body with cast-iron fittings. Specifications: • Suction x Discharge:4"x 4" • Max.Water Capacity:555gpm • Max.Lift:25' • Max.Head:92' • Max.Pressure:40psi • Max.Solid Intake:2" • Fuel Tank Capacity:1.65 Gal • Optional Wheel Kit Dimensions/Weights: • Overall Length:30.1" • Overall Width:27.3' • Overall Height:30.7" • Operating Weight:2161b Contact: For questions or concerns,please feet free to contact us online,or call us directly here at(248)348-8864. Hours of Operation: IA- z� ._.. a,r' - A, �l� _a r rx�xr.�`�'� ��� •. f �o t f+{� �"�n..." ae.+'. �1S 7-� t.aye- e AL. r M w 'x. - 1�� UN tl It f A i , 1 MM � �'� 2 y , F - �wU• l 1 t a- \ I re t t ' aHt�r TRIPLE A MINA t -- Craven County G I S MANFRED D. ALLIGOOD, JR. 1 inch = 810 feet Craven County does NOT warrant the information shown on this map and should be used ONLY fortax assessment purposes. Printed on November 13,2022at 17:39:32AM