Loading...
HomeMy WebLinkAbout20240039 Ver 1_Staff Report Kristina Morales_20240110Baker, Caroline D From: OSP Delivery Requests<OSPDeliveryRequests@LumosFiber.com> Sent: Thursday, February 29, 2024 1:33 PM To: Morales, Kristina; Snyder, Lindsay; OSP Delivery Requests Cc: Martin, Matthew K CIV CESAW Subject: [External] RE: PCN Withdrawal: DWR#20240039/SAW-2023-02503 (R01862-108 / S Bright Leaf Blvd / W Market St / Smithfield NC / Johnston County) CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Good afternoon Kristina, Can you please withdraw the permit for DWR# 20240039/SAW-2023-02503. It is being redesigned and will be resubmitted in the near future. Thank you, Ashley Mundy OSP Delivery Coordinator lum s 540-397-0387 lumosfiber.com From: Morales, Kristina <kristina.morales@deq.nc.gov> Sent: Tuesday, February 20, 2024 4:41 PM To: Snyder, Lindsay <Lindsay.Snyder@lumosfiber.com>; OSP Delivery Requests <OSPDeliveryRequests@LumosFiber.com> Cc: Martin, Matthew K CIV CESAW <Matthew.K.Martin@usace.army.mil> Subject: Re: PCN Withdrawal: DWR#20240039/SAW-2023-02503 (R01862-108 / S Bright Leaf Blvd / W Market St / Smithfield NC / Johnston County) Some people who received this message don't often get email from kristina.morales@deg.nc.gov. Learn why this is important CAUTION: EXTERNAL email. Only open links from TRUSTED sources. Hi Lindsey and Ashley, Thankyou for speaking with me today. Given our conversation today the above referenced application will be considered "on hold" until the revised documents are submitted or the application is withdrawn. Please provide the documents or contact me with an update within 30 days. If you will need to withdrawyour application, please contact me for guidance on how to do so. Best, Kristina Morales, PhD (she/her/ella) Environmental Specialist, DWR North Carolina Department of Environmental Quality Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 Office: 919.791.4258 kristina.moralesPdeq.nc.gov e: ��QF�;� . DI` :7\e /G'`��W� yryes', .. ;dance tp a:!r f' Mw, Sis y'v�t "C�'16e �°r V� From: Thomas, Zachary T <zachary.thomas@deg. nc.gov> Sent: Monday, February 12, 2024 11:06 AM To: Morales, Kristina <kristina.morales@deg.nc.gov> Subject: FW: [External] FW: PCN Withdrawal:: SAW-2023-02503 (R01862-108 / S Bright Leaf Blvd / W Market St / Smithfield NC / Johnston County) Importance: High FYI - 20240039 Thank you, Zach Thomas Environmental Program Consultant, Division of Water Resources North Carolina Department of Environmental Quality Office: (919) 791-4255 zachary.thomas@deg.nc.gov Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: OSP Delivery Requests<OSPDelivervRequests@LumosFiber.com> Sent: Monday, February 12, 2024 10:54 AM To: Casey Fox <Casey.Fox@foxdesignsolutions.com>; Joseph Strider <joseph.strider@foxdesignsolutions.com> Cc: Thomas, Zachary T <zachary.thomas@deg. nc.gov>; OSP Delivery Requests <OSPDelivervRequests@LumosFiber.com>; Snyder, Lindsay <Lindsay.Snyder@lumosfiber.com>; Mulder, Sarah <Sarah.Mulder@Lumosfiber.com>; Bradshaw, Shandie <Shandie.Bradshaw@lumosfiber.com> Subject: [External] FW: PCN Withdrawal:: SAW-2023-02503 (R01862-108 / S Bright Leaf Blvd / W Market St / Smithfield NC / Johnston County) Importance: High CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Matt, I'm forwarding this to our Engineering team. Please see below regarding Army Corps River Crossing - SAW-2023-02503. Ashley Mundy OSP Delivery Coordinator Iumos 540-397-0387 lumosfiber.com From: Martin, Matthew K CIV (USA) <Matthew.K.Martin@usace.army.mil> Sent: Monday, February 12, 2024 8:49 AM To: OSP Delivery Requests<OSPDeliveryRequests@LumosFiber.com>; Snyder, Lindsay <Lindsay.Snyder@lumosfiber.com> Cc: Thomas, Zachary T <zachary.thomas@deg. nc.gov> Subject: PCN Withdrawal:: SAW-2023-02503 (R01862-108 / S Bright Leaf Blvd / W Market St / Smithfield NC / Johnston County) CAUTION: EXTERNAL email. Only open links from TRUSTED sources. Lindsay Snyder, Please reference your Pre -Construction Notification (PCN) Form and attachments dated December 24, 2023, for Department of Army (DA) authorization to discharge fill material into streams and other potential waters of the United States to install a fiber optics cable along a 26 mile corridor. The approximate center of the proposed project is located in directly west of North Front street and its intersection with Market Street, in Smithfield, Johnston County, North Carolina. Please also reference our notice (below) sent to you via e-mail on January 10, 2024, that your application was incomplete and required additional information. This notice included requirements related to revisions to project plans and the Pre -Construction Notification (PCN) Form, compliance with Nationwide Permit Regional and General Conditions, and potential additional impacts to wetlands, to be submitted within 30 days of the date of the request. To date we have not received all of the additional information necessary to proceed with your request; therefore we now consider your application withdrawn. In order to allow us to process a DA authorization request, please re -submit the PCN and relevant attachments, using guidance provided in our notice dated January 10, 2024. Please note that DA authorization must precede any discharge of dredged or fill material in waters of the US. Please let me know If you have any questions. Sincerely, Matthew K. Martin, PWS Regulatory Specialist U.S. Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Mobile: (984) 800-3741 Email: matthew.k.martin@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser: https://re_ u�y.ops.usace.army.mil/customer-service-surveY1. Thank you for taking the time to visit this site and complete the survey. From: Martin, Matthew K CIV (USA) Sent: Wednesday, January 10, 2024 1:28 PM To: OSPDeliveryRequests@LumosFiber.com; Snyder, Lindsay <Lindsay.Snyder@lumosfiber.com> Cc: Thomas, Zachary T <zachary.thomas@deg. nc.gov> Subject: Request for Additional Information: SAW-2023-02503 (R01862-108 / S Bright Leaf Blvd / W Market St / Smithfield NC / Johnston County) Lindsay Snyder, Good afternoon, my name is Matt Martin and I have been assigned as the project manager for your project. Thank you for your PCN, dated December 24, 2023, for the above referenced project. I have reviewed the information and need clarification before proceeding with verifying the use of Nationwide Permits (NWP) 57. Please submit the requested information below (via e-mail is fine) within 30 days of receipt of this Notification. Please email (matthew.k.martin@usace.army.mil) me if you have any questions/concerns or would like to set up at time to discuss. General Condition 32(5) requires a delineation of wetlands, other special aquatic sites, and other waters, such as lakes and ponds, and perennial and intermittent streams, on the project site. Wetland delineations must be prepared in accordance with the current method required by the Corps. Please provide a delineation for the complete project along the —25-mile alignment. Please provide a cross section drawing similar to what was submitted for the West Market Street Crossing. This Crossing will also require a Section 10 permit and Section 408 review. a. Sheet 72 of 96. General Condition 32(10) requires that the Corps can not make a permit decision until a review by the Corps pursuant to 33 U.S.C. 408 because it will alter or temporarily or permanently occupy or use a U.S. Army Corps of Engineers federally authorized civil works project. The Corps will coordinate this PCN with Civil Works once the applicant provides an update for item 2 above. Please reach out if you have any questions / concerns or would like to set up a time to discuss. Thank you, Matthew K. Martin, PWS Regulatory Specialist U.S. Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 Mobile: (984) 800-3741 Email: matthew.k.martin(@usace.armv.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey can be accessed by copying and pasting the following link into your web browser: https://re_ u�y.ops.usace.army.mil/customer-service-surveyl. Thank you for taking the time to visit this site and complete the survey. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.