Loading...
HomeMy WebLinkAbout20130223 Ver 4_Sediment Loss on U-2524C_20151030Wanucha, Dave From: Parker, Jerry A Sent: Friday, October 30, 2015 12:38 PM To: Bailey, David E SAW; Wanucha, Dave; Snell, William H; Mills, James M; Eason, Patty P; Thomson, Nicole J; Nicole Thomson (nthomson@sepiengineering.com); Harrington, Barry W Subject: Sediment Loss on U-2524C Dave and Dave, This email is to report sediment loss at Site 9 on U-2524C. The area recently received two and one half inches of rain which resulted in silt fence failure. As a result, approximately four hundred square feet of wetlands received approximately two to six inches of sediment. The contractor has agreed to repair the silt fence and make some field adjustments to decrease run-off to that area. I have recommended that the contractor hand remove the sediment in two unvegetated areas (approximately one third of the impacted site) while leaving the remaining vegetated area as is. My opinion is that trying to remove the sediment from the vegetated areas would only further damage the wetland. Due to the fact that my camera quit working I was not able to take pictures. However, the contractor should be emailing me pictures which I plan to forward to you. Please let me know if you have any questions or comments. Jerry Parker I rr�7all �:urrc,�l�ui�dci��;e, �C�u ai�d ��rurr�7 �U•ii� �e,i�dcr i� �ul�j��;� �u �C�h•ie, I"J � I�'�"ul�li�; I ta�:ur�:;� I..aw ai�d ir�7ay I�c rli��;lu�e,rl �u �C�h•ih�rl I�artie,�, 1