Loading...
HomeMy WebLinkAbout20240340 Ver 1_Site Plan_20240229(At Ftxi ftW Normal i§!a Lew I TWI Panda -0 D' $ ' k e y ra w � Ft4— L, � e • —` + 14 Opr 6�'U �.',... J. .QAtWA" k"ftw W% W" eftA 40 KcM.Oc PO x.w► 1iu:rrrw s4r.M 4 krl" z�rl yw.aw 4�f . N�M1di .�urm i'aaiica 27iR+-1o17 " ' 9OA Ir 9" [Iflr *,T.W. lF Lake IAR FuI pc+rei� y Lcrp�l�� 31d ARM Oleo" leo 9P �rn&t*tY the fOilow nff rma ton on th[g plan (^vWd* dbn#fi�,b�r�,j4+r � as x"1 1, All pmposad yr ,, during 2. Edon of rip MID ar fM to be pieced -bear. the Full Ptand/ 3, t_acotten of Mp rap or fl�I to be placedl below th* Full Pond/ Namiaet �an'rf any proposed gmcturrsngi� �n s. low OfI"Y V=W tlan or dredin ow tha t�Pond% rural retainingwalj�Krater L&M g Lacrtfon Of ='StructlOnsum wrrfdors PIIA (At Ftxi ftW Normal i§!a Lew I TWI Panda -0 D' $ ' k e y ra w � Ft4— L, � e • —` + 14 Opr 6�'U �.',... J. .QAtWA" k"ftw W% W" eftA 40 KcM.Oc PO x.w► 1iu:rrrw s4r.M 4 krl" z�rl yw.aw 4�f . N�M1di .�urm i'aaiica 27iR+-1o17 " ' 9OA Ir 9" [Iflr *,T.W. lF Lake IAR FuI pc+rei� y Lcrp�l�� 31d ARM Oleo" leo 9P �rn&t*tY the fOilow nff rma ton on th[g plan (^vWd* dbn#fi�,b�r�,j4+r � as x"1 1, All pmposad yr ,, during 2. Edon of rip MID ar fM to be pieced -bear. the Full Ptand/ 3, t_acotten of Mp rap or fl�I to be placedl below th* Full Pond/ Namiaet �an'rf any proposed gmcturrsngi� �n s. low OfI"Y V=W tlan or dredin ow tha t�Pond% rural retainingwalj�Krater L&M g Lacrtfon Of ='StructlOnsum wrrfdors PIIA 3333ww33i333333y3 33 � I M•a\O��y��9 _X'��Eaao�aaa3z / � F �s IR SHE w ♦ l / o eh p�q 3 3Z, bJ 0 0 C7 01 oil °bh ♦ o.P 3�o e a � \ rgez ♦ s x o ¢Fi _ u e pp� ♦° C f 1 �. F � �e 1 } ��' 3 �� � �z� :z :;moo � �•� . 11% Id 3 '��I♦qee c♦e+°°° + PWY-7-m LEW mi-sc-RIP'TION.. PLAN NO . �'7 �� PARCEL ID: Li (or 4,73 41 "EN C "SXf 7-4 "Mered prop" cave -jeers of qle above noted prop", do hereby audxxlze (Name of consulting firm) UU -L.0 CA -it) C)dllaff drid to al achwts cis teary to. U-se piocessing, Issuance wd acceptam of H* Pel"I'lit )r cwdkatior, and any W)d all S*ndard and al cmdRdons attached, VMtV ONMer's AddrM (r difTerero. than property abovc;: *Xne '7DL4 aiwtiN &* above k*rrnabart Gubmlite'd In this is trLm and am rate to the .r CATA BA RIPARIAN BUFFER NOTIFICATION FORM Owrrwar Contract Tree approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02rr .0506 ar,I 15A NCAC 028.0243f8l) Frees are not allowed to be removed from Zone 1 of the Buffer (wfthln 30 ft of the full pond elevation), unless approved. &cept on, tlwse trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping ano siup:-Ig along the Immediate shoreline is allowed. [15A NCAC 028.0243(6)] Benching, grading in the buffer is not allowed_ Excessive disturbance of ground cover. [15A NCAC 028 ,0243 (6)) Lezc:'1es, imperious patios, impervious walkways, etc, are not allowed in the buffer unless specifically approved by tte blvisoaii. Tnere are limitation on size for decks, 115A NCAC 02B .0243{4) and (6)1 f4Vork :a ba conducted rro n land must indicate an access and Indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction r.�r al must lye ,,; -;-e tiae buffer. [15A NCAC 02H .0502 and 15A NCAC 02B ,0243 (4). (6), (8)l Sturrnwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater uischarges must oe a: the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow ar r?on-eroilve velocities to the lake. [15A NCAC 02B .0243(5), (6)) Acknowledgement of Notgkathm SMi hereby state that I have been informed of the Catawba riif .�.,zy work conducted in the buffer, not specifically stated In the application and approved by the Division of VVa ter Resources (DWR), is a violation and subject to enforcement. Due diligence will be be built within substantial compliance and intent of the 401 Water Quality Certification and Buffe�ftyt approved plans) and specification(s), and other supporting mpterlals. 1✓1