Loading...
HomeMy WebLinkAbout20151135 Ver 1_Riparian Buffer Authorization_20151005State of North Carolina ""'" «. _ Department of Environment and Natural Resources Division of Water Resources Division of Water Resources 15A NCAC 02B.0233 (8)(b),.0243 (8)(b),.0250 (11)(b),.0259 (8)(b),.0267 (11)(c),.0607 (e)(2) - Buffer Authorization FORM: BA 10 -2013 Riparian Buffer Authorization Form A. Applicant Information 1. Project Information 1 a. Name of project: f D " 1 b. County: e, 1c. Nearest municipality: rl I 1d. Subdivision name: a 1e. Is the project located in any of North Carolina's twenty coastal counties. If yes, answer If below. ❑Yes No 1f. Is the project located within a NC Division of Coastal Management Area of Environmental Concern (AEC)? Yes '�No 2. Owner Information 2a. Name on Recorded Deed: -.-54a4l2 W K1L- 2b. Deed Book and Page No. 1P tv 2c. Map Book and Page No. (include a copy of the recorded map that indicates when the lot was created): Lo+ J L.) 1� M E, 0 04 I C -P O t n -Ph 3 Z p NA Z �� 9 1 y O 2d. Responsible Party (for Corporations): 2e. Street address: 2f. City, state, zip: 0-- 2g. Telephone no.: _ (o 2h. Fax no.: 2i. Email address: 3. Applicant Information (if different from owner) 3a. Applicant is: ❑ Agent ❑ Other, specify: 3b. Name: 3c. Business name (if applicable): T 5 3d. Street address: °- 3e. City, state, zip: " 7 -_ _ 3f. Telephone no.: 3g. Fax no.: �. . 3h. Email address: 4. Agent/Consultant Information (if applicable) 4a. Name: 4b. Business name (if applicable): (� 4c. Street address: 4d. City, state, zip: 4e. Telephone no.: 4f. Fax no.: 4g. Email address: FORM: BA 30 -2013 Page 1 of 4 it .r� J i AYG -11 -2015 23:10 FROM:DAVID BARRIER ,w c 0 9194692834 70:9193659734 P.2/4 S. Project Information and Prior Project History t. Property Identification la. Property identification no. (tax PIN or parcel ID): 1 "t 'r,- cp – O 1b. Site coordinates (in decimal degrees): Latitude: . S1 l,, k" Longitude: XI acres 1c. Property size: 2, surface Waters 2a. Name of nearest body of water to proposed project: 2b. Water quality, Classification of nearest receiving water: 2c. River basin: ckvw 4. 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: (2k.--aa" pac1 °Ci�'���+� 1a1 C4• ,5+-�rua};o., 3b. Attach an 8'/ x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site 30. Attach an 8 % x 11 excerpt from tho most recent version of the published County NRCS Soil Survey Map depicting the project site 3d. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3e. Explain the purpose of the proposed project; c —%A Co 3f. Describe the overall project in detail, including the type of equipment to be used: 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property/ project (including all prior phases) in the past? ❑ Yes 4!;b No ❑ Unknown Comments: 4b. If yes, who delineated the jurisdictional areas? Name (if known); Agency/ Consultant Company: Other. 4c If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this © Yes JQNo Q Unknown project (including all prior phases) in the past? _ 5b. If yes, explain and detail according to "help file' instructions. 6. Future Project Plans Ga. Is this a phased project? ❑ Yes No 8b. If yes, explain. FORM. BA 10 -2013 Page 2 of 4 C�� C. Proposed Impacts Inventory I. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. I. Buffer Impacts 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? 1a. Project is in which protected basin? ,�S(Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Jordan ❑ Goose Creek 1b. Individually list all buffer impacts below. if any impacts require mitigation, then you MIUST fill out Section D of this form. Total impact (square feet Multiplier 3 (2 for Catawba) 1.5 Buffer impact Reason for number — impact Type of impact (exempt, allowable, Stream name Suffer Zone 1 Zone 2 Permanent (P) allowable w/ mitigation) mitigation impact impact required? (sq ft) (sq ft) or T e 2d. if yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. B1 P T ❑ Yes ❑ No p Z,(D 132 ❑P ❑T [1 Yes No 83 ❑P ❑T 13 Yes [I No B4 ❑ P T ❑ Yes ❑ No B5 ❑ P ❑ T ❑ Yes ❑ No 136 0 El [I Yes [I No 1c. Comments: Total buffer impacts D, impact Justification and Mitigation I. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Buffer Mitigation 2a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ❑ No 2b, if yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation and calculate the amount of mitigation required in the table below. Zone Zone 1 Zone 2 Reason for impact Total impact (square feet Multiplier 3 (2 for Catawba) 1.5 Required mitigation s uare feet Total buffer mitigation required: 2c. If buffer mitigation is required, is payment to a mitigation bank or NC EEP proposed? 7 ❑ Yes ❑ No 2d. if yes, attach the acceptance letter from the mitigation bank or NC EEP. 2e. If no, then discuss what type of mitigation is proposed. A Comments: FORM: BA 10 -2013 Page 3 of 4 E. Diffuse Flow Plan All buffer impacts and high ground impacts require diffuse flow or other form of ❑ Diffuse flow stormwater treatment. Include a plan that fully documents how diffuse flow will be ❑ Other BMP maintained. If a Level Spreader is proposed, attach a Level Spreader Supplement Form. 1 b. If you answered "yes" to the above, does the project require preparation of an If due to site constraints, a BMP other than a level spreader is proposed, please provide a environmental document pursuant to the requirements of the National or State (North plan for stormwater treatment as outlined in Chapter 8 of the NC Stormwater BMP Carolina) Environmental Policy Act (NEPA/SEPA)? Manual and attach a BMP Supplement Form. 1c. If you answered 'yes' to the above, has the document been finalized by the State F. Supplementary Information 1. Environmental Documentation 1 a. Does the project involve an expenditure of public (federallstate/local) funds or the use of ❑ Yes jj to public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an ❑ Yes ❑ No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered 'yes' to the above, has the document been finalized by the State ❑ Yes ❑ No Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: 2. Violations 2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland ❑ Yes $No Rules (15A NCAC 02H .1300), DWR Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)? 2b. Is this an after- the -fact permit application? ❑ Yes E No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): ApplicantfAgenVs Printed Name V Ap (Agents signature is valid offly D e nt/Agents Signature if an authorization letter from the applicant is provided.) Send this completed form and accompanying documents to the following: For government transportation projects sent by First Class Mail via the US Postal Service: NC DWR, Transportation Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 - 1617 For aH other projects sent by First Class Mail via the US Postal Service Karen Higgins NCDWR — 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 -1617 For government transportation projects sent by delivery service (UPS, FedEx, eta): OR NC DWR, Transportation Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 For all other projects sent by delivery service (UPS, FedEx, eta): OR Karen Higgins NCDWR — 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 FORM: BA 10 -2013 Page 4 of 4 � r r LEGEND ERALD Lines Surveyed — — Lines not surveyed FORESTVtLLERI) x E.I.P. Existing Iron Pipe I.P.S. Iron Pipe Set ° P.P Power Pole HWY 64 M. H. Manhole 40' W 0 4a VICINITY MAP (N.T.S) GRAPHIC SCALE 1 "= 40' 1 HEREBY CERTIFY THAT THIS MAP IS CORRECT AND THAT THE BUILDING FOUNDATION WILL LIE WHOLLY ON THE LOT AND THAT THERE ARE NO ENCROACHMENTS ON SAID LOT EXCEPT AS NOTED. I FUTHER CERTIFY THAT THIS PROPERTY BeIRMOES NOT LIE IN A SPECIAL FLOOD HAZARD AREA AS DETERMINED BY F.E.M.A. Id Radius Arc Length Chord Ch Bear C1 325 00' 76 00' 75 AfT R 610 11'SQ" W Id Bearing Distance LL1 S 54 °29'53" W 3-1-6. TOP OF T= 60' NEUSE RIVER I RIPARIAN BUFFE MEASURED FROM 1 N TOP OF BANK 253 I o 20' PUBLIC DRAINAGE EASEMENT Ico r N V N61 N 0 CA r I� m a 49'x9° r 83.4 _ Z L� Cn i- -- DECK N CJ1 I I wI PROP. HOUSE m I 255 I 20' PUBLIC I I UTILITY EASEMENT 11.00' o I DRIVE I I I I , 254 c 0.17 AC. L1 MORGANITE CT. (50' R/M LOT 254, EMERALD POINTE, PH. 3, RECORDED IN B.O.M. 2006, PG. 1408, WAKE CO. I, David W Barrier,certify that this plat was drawn under my supervision from an actual survey made under my supervision; that the boundaries not surveyed are clearly indicated and any encroachments are shown. PRELIMINARY PLOT PROPERTY OF PROFILE CONSTRUCTION 402 MORGANITE CT SCALE; 1 "=40' DATE; 6/25/14 BOOK; KNIGHTDALE, N.C. David W. Barrier Licensed Surveyor 421 S. Harrison Ave. Cary, N.C. 27511 (919) 469 -2834